Filter Results

501 to 525 of 3064
vol 2_part_c_bgt_feis_comments_responses_web_lowrez
places(at6thAveNW,whichisaproposedfutureneighborhoodgreenway,ifmyunderstandingiscorrect)a ...
0.00221272046 |
a/100531
rainierrapidride_hia_final_7june2018
and traffic, bike lanes with minor separation between parked cars and travel lanes, and neighborhood ...
0.00221260148 |
a/106047
vol 2_part_b_bgt_feis_comments_responses_web_lowrez
comments (see particularly those of Moe Moosavi and Seattle Neighborhood Greenways)xFinal EIS needs to ...
0.00221246574 |
a/100530
rainiervalleygreenwaysouthsectionfoldedmailer8.2015
second open house on September 23 to learn more and share your thoughts on the most promising route for the Rainier Valley North-South ...
0.00221239263 |
a/102161
23rdavenueudfdraft9-26-14r
with apartments, live-work units, and ground floor retail ·The Central Area Neighborhood Greenway as part ...
0.00221233931 |
a/86205
gtsp report 04.17.2019
the community has envisioned. A neighborhood greenway provides a safe and comfortable connection on low ...
0.00221220078 |
a/100567
transportation
and construction of an initial 2.1 mile segment of the Ballard Neighborhood Greenway and $100,000 is ...
0.00221219822 |
a/61982
249transportation
for design and construction of an initial 2.1 mile segment of the Ballard Neighborhood Greenway and ...
0.00221219822 |
a/61971
university-plan
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
0.00221208949 |
a/78421
communityplanningprioritization
and install a traffic signal at the intersection for walking and biking. Improvements are scheduled for completion in late 2019 • North ...
0.00221179752 |
a/84050
georgetown-pstf_finalreport_7.31.2018
for neighborhoods (walkability, food access, etc.). Enforce air quality regulations. Create/expand Georgetown tourism ...
0.002211717 |
a/78515
move_ballard_2016
facilities in Ballard include sharrows, neighborhood greenways, bicycle lanes, and the multi-use ...
0.00221168459 |
a/99132
gtsp_report_04.17.2019_8.5x11
St to S Eddy St – Shared Use Path• Ellis Ave S: S Eddy St to S Bailey St – Greenway • S Bailey St: 13th Ave S to Ellis Ave ...
0.00221124664 |
a/100571
1.transportation
to theregion.Incorporating environmental excellence and climate protection into every decision, project andprogram.Promoting the ...
0.00221098238 |
a/62366
sdotcap
.Incorporating environmental excellence and climate protection into every decision, project andprogram.Promoting the livability of our ...
0.00221098238 |
a/62381
opcd130th145thsurveysummary
adamantly opposed to bikes using major arterials. Create a greenway route to the station..7Greenwood Ave N8I do not plan to ...
0.00221098238 |
a/87265
opcd130th145thsurveysummary
adamantly opposed to bikes using major arterials. Create a greenway route to the station..7Greenwood Ave N8I do not plan to ...
0.00221098238 |
a/86962
centralareadesignguidelinesfinalpresentation
)Urban Village Community NodeTransitBus Lines and StopsProposed Light Rail StopCivic and Open SpaceCivic BuildingCentral Area ...
0.00221077166 |
a/86540
south park home zone survey_english_final
Neighborhood Greenway with Stay Healthy Street Phase 2 Neighborhood ...
0.0022107258 |
a/104031
south park home zone survey_english_final
Neighborhood Greenway with Stay Healthy Street Phase 2 Neighborhood ...
0.0022107258 |
a/101506
2020_1218_south park survey_wsb updates_english_final
ParkHome Zone BoundariesPhase 1 Neighborhood Greenway with Stay Healthy Street Phase 2 ...
0.0022107258 |
a/103993
2020_1218_south park survey_wsb updates_english_final (1)
ParkHome Zone BoundariesPhase 1 Neighborhood Greenway with Stay Healthy Street Phase 2 ...
0.0022107258 |
a/103992
ngw_faq_2024
ngw_faq_2024 Neighborhood Greenways: Frequently Asked Questions Neighborhood ...
0.00221043546 |
a/158922
rooseveltdesignguidelines2015
residents strongly value green spaces in the neighborhood for their open space function and environmental benefits. ■New ...
0.00221041846 |
a/96357
2023 levy to move seattle annual report
lanes and 60 miles of greenways, completing over half of the Expect to build 90 or more miles out of the goal of 110 ...
0.00221019983 |
a/155497