Filter Results

501 to 525 of 2655
seattle-city-light-os-2017c
Insurance Corporation or the Federal Savings and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as ...
0.00224572583 |
a/58508
uptowndirectorsreport2017
density. The amount of permitted floor area is a function of lot size multiplied by the FAR limit. For example a ...
0.00224572583 |
a/87888
seattleindustrialfeischapter6appendices
buildings for landmark review when demolition of properties that are over 50 years old is proposed, regardless of City ...
0.00224559265 |
a/134320
2021sfcchapter3
and premises for precautions against fire and the spread of fire and general requirements of fire safety. [W][S] 301.2 ...
0.00224533118 |
a/162464
draft battery language 03_ifc_2021
and maintenance of all structures and premises for precautions against fire and the spread of fire and general requirements of fire safety. ...
0.00224533118 |
a/154144
uptownrezoneordinance
Non-residential uses Permit applications for additions, modifications, demolition, or replacement of ...
0.00224533118 |
a/87903
seattle solid waste 2021 final os
of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners under the Bond ...
0.002245261 |
a/58494
lowrisecodeupdatedirectorsreport
.......................................................................................................................13 5. ...
0.00224518473 |
a/87994
2010_adopted_cip
and the University of Washington. SDOT is managing the City’s design review and permitting process and has negotiated a ...
0.0022449817 |
a/61612
finalmimp-2014-12-11
with a new Major Institutional Master Plan (MIMP) for the Cherry Hill cam- pus, consistent with all applicable City of Seattle ...
0.0022449817 |
a/77396
cherry hillcompiledmimp_2016_07_08(0)
of the master planning process is to permit appropriate institutional growth within boundaries while minimizing the adverse ...
0.0022449817 |
a/77376
cherry hillcompiledmimp_2016_07_08
of the master planning process is to permit appropriate institutional growth within boundaries while minimizing the adverse ...
0.0022449817 |
a/77377
psbminutes8-16-17
that new construction will be completed within two (2) years of demolition. SMC23.66.120 Permitted uses ...
0.00224490138 |
a/73817
03_ifc_2021
of fire safety. [W][S] 301.2 Permits. Permits shall be required as set forth in Section 105.5 for the ...
0.00224475912 |
a/139961
pioneersquare-guidelines
, or space and any change of use after initial approval. Use, design and demolition approval is required before any ...
0.00224461942 |
a/73736
mimp_report_fy2020
moves forward with a Master Use Permit (MUP) application for development that would include the demolition ...
0.00224422687 |
a/77262
2021sebcchapter3
of their erection or installation shall be permitted to remain in use unless ((determined)) the materials are deemed unsafe ...
0.00224422687 |
a/162629
33_ifc_2021v3
AND DEMOLITION User note: About this chapter: Chapter 33 outlines general fire safety precautions for all structures and ...
0.00224408926 |
a/139498
demolitionpermitsposter
described in Director's Rule 4-2009, Demolition Permits With Waste Diversion Plan•The structure will be ...
0.002243922 |
a/98077
prelimdraftmimp-2014-02-04
entitlement work is to permit institutional growth while mitigating its impact on surrounding neighborhoods. The MIMP ...
0.00224375166 |
a/77560
tenessentialstepstostartabusinessinseattle_2014
. DPD issues a series of construction-related permits, including building permits, ...
0.0022437023 |
a/56220
appendixbeis scopingengagementhubcomments
apartment buildings could be allowed by-right without requiring land use review (just building permit review for life ...
0.002243672 |
a/135759
reporttopolicycommitteeurmlistvalidation
.................................................................................................... 36 3.2 Buildings Removed from the URM ...
0.00224359427 |
a/96888
cwb_nom_application
, and boathouse – were included in the Center’s original permit requests and are the primary focus of this report. The ...
0.00224359427 |
a/75217
lpbcurrentnom_center_wooden_boats
, pavilion, oar house, and boathouse – were included in the Center’s original permit requests and are the primary focus of ...
0.00224359427 |
a/74444