Filter Results

5026 to 5050 of 11838
westrayestvmp
and citizen interest in the removal and trimming of trees along a slope of Magnolia Boulevard known as the Raye Street Bowl. The impetus of ...
0.00218238146 |
a/92749
2019-05
practice of basing affordable housing developer contribution amounts on the final building design reflected in construction ...
0.00218238146 |
a/50566
spr commuse insurance example and requirements 121324
) AFFORDING COVERAGE NAIC# INSURED INSURER A: INSURER B: INSURER C: INSURER D: ABC Company (MUST match the name on business license and the ...
0.00218238146 |
a/163565
evansschool_reimaginingkssracialequitylens
.................................................................................................................... 16 Community ...
0.00218238146 |
a/49212
seattleindustrialfeisch3.1
codes and applying any site-specific conditions (e.g., methane mitigation systems for buildings built near historical ...
0.00218238146 |
a/134516
bike_route_study_30percent_plans_2024-07-05
SECTIONS 1-07.15 AND 8-01.2.THE CONTRACTOR MUST COMPLY WITH ALL NPDES PERMIT REQUIREMENTS. SEE SECTIONS1-07.15 AND ...
0.00218238146 |
a/158124
pioneersquare-application
Square Preservation Board (hereafter, Board) and the Director of the Department of Neighborhoods. They are required before the City will ...
0.0021823463 |
a/73734
2018smcchapter11
designations in ASHRAE 34 shall not be mixed ina system.Exception: Addition of a second refrigerant is allowed where ...
0.0021823463 |
a/97269
2013.12.19macysskybridgedesigncommissionminutes
of Review The purpose of this meeting was to review the proposal by Macy’s to retain their existing skybridge. Their 30 year ...
0.0021823463 |
a/85114
pspb_application_2017
of Neighborhoods. They are required before the City will issue permits for work that results in any change to the exterior ...
0.0021823463 |
a/74093
approvedjul252024meetingminutes
the built environment work together on an issue. For example, how do decisions in the Comprehensive Plan, zoning incentives, and ...
0.0021823463 |
a/159268
pspb_application_2019
of Neighborhoods. They are required before the City will issue permits for work that results in any change to the exterior ...
0.0021823463 |
a/74094
pspbapplication ch
Preservation Board (hereafter, Board) and the Director of the Department of Neighborhoods. They are required before the City will issue ...
0.0021823463 |
a/74047
columbia-city-hillman-city-matrix
licensestage. DCLU’s role begins at the application stage of aland use or building permit. DCLU verifies ...
0.0021823463 |
a/78356
seattledesigncommission-2016.06.0220205thaveskybridgeminutes
as a pedestrian connection between the Westin Building and 2020 5th Ave. The approval did not include the addition of ...
0.0021823463 |
a/85802
introduction
commercial activity and efforts to conserve by residents. The Department of Planning and Development (DPD), which relies on ...
0.0021823463 |
a/61779
general_fund_revenue_overview
. In 2017, the City issued building permits valued at a record $5.0 billion (see Figure 6). Figure 6. ...
0.0021823463 |
a/63355
generalfundrevenueoverview
. Initially construction was focused in new apartments and public construction, but over time activity has broadened to include more office ...
0.0021823463 |
a/63294
annualreport2018
of the approved Master Plan. North Seattle College (NSC) has met the major goals and conditions of the 1995 Master Plan as described in this ...
0.0021823463 |
a/76859
2016facilitiesannualreport-final
. The Physical Education Building, now called the Roy Flores Wellness Center, was constructed and occupied in 1995. The ...
0.0021823463 |
a/76854
2016facilitiesannualreport-final_1
. The Physical Education Building, now called the Roy Flores Wellness Center, was constructed and occupied in 1995. The ...
0.0021823463 |
a/76855
dr_dpd_13_2015_u district green streets.3
of Planning and Development (DPD). Therefore, applicants for Street Improvement Permits that follow these concept plans ...
0.0021823463 |
a/99182
carkeek pedestrian bridge replacement feasibility study final
............................................................................................................................................ ...
0.0021823463 |
a/157274
carkeekpedestrianbridgereplacementfeasibilitystudy2020-final
............................................................................................................................................ ...
0.0021823463 |
a/129096
dadu_submission070
ELECTRICAL CODE (NEC) INTERNATIONAL FIRE CODE WA STATE ENERGY CODE WA STATE VENTILATION CODE THE BUILDING ...
0.0021823463 |
a/86865