Filter Results

4976 to 5000 of 5678
seattledesigncommission-2016.05.05seattleoperapresentation
MEANINGFUL PUBLIC CONNECTIONS TO CRAFT BEHIND THE SCENESINTEGRATE WITH MCCAW HALL AT MERCERLEVERAGE STAGECRAFT CONCEPTS IN ...
0.00214775465 |
a/85801
2014.06.05sr520designcommissionpresentation
to complete the project and compatibility with the project delivery schedule and fish windows.ƒArchitectural characterScale ...
0.00214775465 |
a/85004
seattledesigncommission-2012.02.02alaskanwayviaductandseawallpres ...
seattledesigncommission-2012.02.02alaskanwayviaductandseawallpresentation2 SOUTH OPERATIONS BUILDING ARCHITECTURE & ...
0.00214775465 |
a/85677
dadu_submission020
sagedesignsnw.biz savvy & artful SDNW ADU ENTRY 1 - MARY’S COTTAGE - SMALL FOOTPRINT CEILING FANS PRICE FOR THE ...
0.00214775465 |
a/86814
uncle_bob_place_presentation
of the above.PROJECTLOCATIONPREPARED FORNO.DATEREVISION SEATTLE DCI / OPCD APPROVAL STAMPCHECKDATEISSUE 3/18/2022 9:51:23 AMA2.001BFEBRUARY ...
0.00214775465 |
a/126581
seattledesigncommission-2017.01.05portagebayparkpresentation
LAWNBEACHSHORELINE HABITATSHORELINE HABITAT100’50’25’0NCurrent Site Plan Base BidBeachfront Lawn TerracesShade GrovePicnic ...
0.00214775465 |
a/85082
lpb011525minutes
analysis was done by SMR, the architecture firm responsible for the prior rehabilitation. Board deliberation: BM Barnes ...
0.00214775465 |
a/166522
seattledesigncommission-2016.09.01judkinsparkstationminutes
HaddadDesign CommissionRachel GleesonDesign CommissionJescelle MajorDesign CommissionJake McKinstryPlanning CommissionMarj PressPlanning ...
0.00214775465 |
a/84894
kss_2020studioresidency_guidesfacility (002)
Street Station location is especially suited to the applicant’s growth and development: dedicated space, mission, location, public ...
0.00214775465 |
a/49289
doit_overview
center, which houses most of the computer servers and the computing architecture that operates software applications on ...
0.00214708922 |
a/61622
library_narrative
planning. As verified by the assessment, the overall condition of Library facilities is very good. The Central Library ...
0.00214708922 |
a/61515
library_overview
in their library facilities. In 2007, the Library commissioned a building condition assessment and development of an asset management ...
0.00214708922 |
a/61445
sr_mhc1521_feb10
, decorative finishes, lighting fixtures. Exhibits: • Site location • Photo of existing storefront • Written scope of work • Photos of ...
0.00214708922 |
a/73706
city_light_narrative
, are in place when and where the power is requested. For 2009, City Light plans twelve new projects, which include, but ...
0.00214708922 |
a/61493
bios092016
and Manager of Strategic Initiatives for the Department of Capital Planning and Development. She has been attending CUCAC ...
0.00214708922 |
a/77691
bios022017
of Strategic Initiatives for the Department of Capital Planning and Development. She has been attending CUCAC meetings for ...
0.00214708922 |
a/77690
lpbagendaarc_1-15-16
of the Architectural Review Committee, and Other Interested Persons From: Sarah Sodt, Landmarks Board Coordinator ...
0.00214708922 |
a/74706
mpacminutes11-9-16
. They have recently convened SPARC (Sand Point Application Review Committee) which will replace the architectural review ...
0.00214708922 |
a/92326
23rdavenueactionplanphase3strategysummary
23rdavenueactionplanphase3strategysummary 23rd Avenue Action Plan Goal A: A DESTINATION WITH UNIQUE IDEN-TITY The Central ...
0.00214708922 |
a/86198
initiativesoverview-stratplan2021
initiativesoverview-stratplan2021 Strategic Plan 2021-2026: Proposed Initiatives Priority Initiative Sponsor Overview ...
0.00214708922 |
a/51279
ufc090915agendav2
– 5:00 p.m. Seattle Municipal Tower, Room 2750 (27th floor) 700 5th Avenue, Seattle 3:00 Call to order 3:00 – 3:05 Chair report ...
0.00214708922 |
a/118377
mhcminutes8-8-18
Cherries in the Fairley building. Owner operator: Volunteers. 2 Business hours: 11:00 a.m. to 3:00 p.m. Monday through Friday. ...
0.00214708922 |
a/73626
200810_kimball_departures_responses
200810_kimball_departures_responses August 10, 2020 Paul Wight Project Manager Seattle School District #1 Department of Capital and ...
0.00214708922 |
a/76804
centralareadesignguidelines-draftsummary
, and on the rooffor larger mixed-use buildings.•Unify streets through street trees. Incorporate an irrigation plan that ...
0.00214708922 |
a/86537
mhcminutes5-9-18
reviewed included a site plan, written description of ownership interest and role in the business operation; applicant ...
0.00214708922 |
a/73613