You just searched for:
Search
Filter Results
476 to 500 of 2630
2003seattlefirecode
http://www.seattle.gov/documents/departments/sdci/codes/seattlefirecode/200 ...
buildings.105.6.28 LP-gas.An operational permit is required for:1.Storage and use of ...
0.00223370572 |
a/97556
2010_proposed_cip_book
http://www.seattle.gov/documents/departments/financedepartment/1015proposed ...
from Downtown Seattle to Capitol Hill and the University of Washington. SDOT is managing the City’s design review and ...
0.00223352527 |
a/61672
appendixaeisscopinglettersemails
http://www.seattle.gov/documents/departments/opcd/seattleplan/appendixaeiss ...
please, just stop the B.S…………….. At a minimum, placate us by evaluating and calculating the loss of our urban canopy, green spaces and parks ...
0.002233475 |
a/135756
oneseattleplandeiscultural
http://www.seattle.gov/documents/departments/opcd/seattleplan/oneseattlepla ...
years old or older are indicated on the “Historic-Aged Parcels and NRHP-Eligible Properties” maps. ▪ This data is updated regularly with ...
0.00223347172 |
a/153552
sdci design review exemption ord
http://www.seattle.gov/documents/departments/sdci/codes/changestocodes/desi ...
(determination that an Environmental Impact 3 Statement is required) for Master Use Permits and for building, ...
0.00223339861 |
a/161023
2012srcchapter4
http://www.seattle.gov/documents/departments/sdci/codes/seattleresidentialc ...
the provisions of Section R322. Wood foundations shallbe designed and installed in accordance with AF&PA PWF.Exception: The provisions of ...
0.00223339861 |
a/97807
4217-phasei-esa-harbor
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
Permit System DataUICUnderground Injection Wells ListingECHOEnforcement & Compliance History InformationFUELS PROGRAMEPA ...
0.00223339861 |
a/59377
reportonmayorsrecommendations
http://www.seattle.gov/documents/departments/opcd/vault/multifamily/reporto ...
........................................................................................................................21 ...
0.00223335414 |
a/88029
2021secchapter5
http://www.seattle.gov/documents/departments/sdci/codes/seattleenergycode/2 ...
. Unaltered portions of existing buildings used for residential purposes that received a certificate of occupancy at least ...
0.00223335414 |
a/162722
seattle-city-light-os-2017c
http://www.seattle.gov/documents/departments/investorrelations/delete/2017 ...
Insurance Corporation or the Federal Savings and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as ...
0.00223335414 |
a/58508
uptowndirectorsreport2017
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/uptown ...
density. The amount of permitted floor area is a function of lot size multiplied by the FAR limit. For example a ...
0.00223335414 |
a/87888
seattleindustrialfeischapter6appendices
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/indust ...
buildings for landmark review when demolition of properties that are over 50 years old is proposed, regardless of City ...
0.002233223 |
a/134320
2021sfcchapter3
http://www.seattle.gov/documents/departments/sdci/codes/seattlefirecode/202 ...
and premises for precautions against fire and the spread of fire and general requirements of fire safety. [W][S] 301.2 ...
0.00223296555 |
a/162464
draft battery language 03_ifc_2021
http://www.seattle.gov/documents/departments/fire/business/archived ...
and maintenance of all structures and premises for precautions against fire and the spread of fire and general requirements of fire safety. ...
0.00223296555 |
a/154144
seattle solid waste 2021 final os
http://www.seattle.gov/documents/departments/investorrelations/2021 ...
of or interest on the Bonds, or any notice which is permitted or required to be given to Registered Owners under the Bond ...
0.00223289663 |
a/58494
lowrisecodeupdatedirectorsreport
http://www.seattle.gov/documents/departments/opcd/vault/multifamily/lowrise ...
.......................................................................................................................13 5. ...
0.00223282143 |
a/87994
2010_adopted_cip
http://www.seattle.gov/documents/departments/financedepartment/1015adoptedc ...
and the University of Washington. SDOT is managing the City’s design review and permitting process and has negotiated a ...
0.00223262166 |
a/61612
finalmimp-2014-12-11
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
with a new Major Institutional Master Plan (MIMP) for the Cherry Hill cam- pus, consistent with all applicable City of Seattle ...
0.00223262166 |
a/77396
cherry hillcompiledmimp_2016_07_08(0)
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
of the master planning process is to permit appropriate institutional growth within boundaries while minimizing the adverse ...
0.00223262166 |
a/77376
cherry hillcompiledmimp_2016_07_08
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
of the master planning process is to permit appropriate institutional growth within boundaries while minimizing the adverse ...
0.00223262166 |
a/77377
psbminutes8-16-17
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
that new construction will be completed within two (2) years of demolition. SMC23.66.120 Permitted uses ...
0.00223254249 |
a/73817
03_ifc_2021
http://www.seattle.gov/documents/departments/fire/business/archived ...
of fire safety. [W][S] 301.2 Permits. Permits shall be required as set forth in Section 105.5 for the ...
0.00223240233 |
a/139961
pioneersquare-guidelines
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
, or space and any change of use after initial approval. Use, design and demolition approval is required before any ...
0.002232265 |
a/73736
mimp_report_fy2020
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
moves forward with a Master Use Permit (MUP) application for development that would include the demolition ...
0.00223187846 |
a/77262
2021sebcchapter3
http://www.seattle.gov/documents/departments/sdci/codes/existingbuildingcod ...
of their erection or installation shall be permitted to remain in use unless ((determined)) the materials are deemed unsafe ...
0.00223187846 |
a/162629