Filter Results

26 to 50 of 432
seattleindustrialfeiscommentletters
Output Prototype Concept Site Size Model Output Economic Surplus Prototype 1: Industry and Innovation Medium ...
0.00182634918 |
a/134325
seattle city light 2021a pos
, workers, and vulnerable populations adversely impacted. In 2020, working with the Seattle Fire Department, the City launched free public ...
0.00182498735 |
a/58482
lfs-existing-conditions-and-context-memorandum
four areas within the site.·The analysis of existing conditions and context was used as a foundation for developingthe ...
0.001823805 |
a/135026
lidi5existingconditionscontextmemorandum
-risestructures. The physical context of the site and its surroundings was fundamental todeveloping the ...
0.001823805 |
a/87191
2020seattleelectricalcodequickreference
that the ground-fault protective system will not cause the switch to open. (C) Performance Testing. The ground-fault ...
0.00182307814 |
a/96489
2020seattleelectricalcodereplacementpages
first in-stalled on site. ((This testing shall be conducted by a qualified person(s) using a ...
0.00182307814 |
a/96490
seattle city light vrdb refunding 2023b os
and Disposal Issues ...
0.00182229048 |
a/148661
seattle city light 2021a final os plus addendum
. In 2020, working with the Seattle Fire Department, the City launched free public COVID-19 testing sites ...
0.00182224135 |
a/58481
seattle city light 2021a final os plus addendum(0)
impacted. In 2020, working with the Seattle Fire Department, the City launched free public COVID-19 testing ...
0.00182224135 |
a/58480
lfs-technical-feasibility-memorandum
analyses that were applied to lid area test concepts. The analyses considered a range of variables (i.e., geometric ...
0.00181953306 |
a/135025
lidi5technicalfeasibilitymemorandum
analyses that were applied to lid area test concepts. The analyses considered a range of variables (i.e., geometric ...
0.00181953306 |
a/87217
04142021rpmtgmaterialsbinder
, and uncertainty of operating in a COVID-adjusted environment.Connect with UsTo learn more about the 2022-2026 Strategic ...
0.00181929814 |
a/51559
seattle city light 2023 pos
mechanical, electrical, and plumbing. In addition to the above, City departments are encouraged to test new approaches and ...
0.00181914528 |
a/144115
seattle city light 2022 pos
green building rating is LEED Gold. In addition to the above, City departments are encouraged to test new approaches and ...
0.00181906321 |
a/129751
seattledisabilityactivismhistoriccontextstudy
). Ida Daly and other leaders with disabilities led the project and vision for the site. Ida Flagler Daly Posters, ...
0.0018188355 |
a/162997
2021 proposed budget
and Mayor’s two-year package of COVID-19 relief. • Additional funding of $5 million will be provided to ensure that the City’s current ...
0.00181619544 |
a/63491
seattle city light 2022 os
pandemic and providing testing and vaccination sites. The City continues to address a number of social ...
0.00181567424 |
a/131003
seattle city light 2022 os with errata notice
building rating is LEED Gold. In addition to the above, City departments are encouraged to test new approaches and ...
0.00181567424 |
a/131376
seattle city light 2023 os
, and plumbing. In addition to the above, City departments are encouraged to test new approaches and standards, such as ...
0.0018156108 |
a/144775
wsble-deis-comment-letters-city_full_letter
(SMC22.800-22.808).3Geology and soils. The Prospect Street portal, Smith Cove Station site, and alignments along thewest ...
0.00181280484 |
a/168907
2025-2026 adopted budget book
Endorsed Budget and 2025-2030 CIP can also be found online at the City Budget Office’s webpage. In addition to PDF files containing the ...
0.00181260437 |
a/165415
2024-2029 adopted capital improvement program
, siting, pre-design, test-to-fit analyses, and structural assessments and repairs. These improvements ...
0.0018114337 |
a/153286
2024-2029 proposed cip
are encouraged to test new approaches and standards, such as the LivingBuilding Challenge and the Sustainable ...
0.00181113393 |
a/147694
jac-meeting-notes-2020
on 4/8. Start tying column steel on site last week of April. Condon Johnson – Mobbing to site 4/6 and 4/7. ...
0.00180997269 |
a/58812
2022 jac meeting minutes
second month. There is a priority hire journey worker on site, and they plan to ramp up with laborers. They also plan to ...
0.00180994463 |
a/137680