Filter Results

4951 to 4975 of 11414
7h_19-280
: (206) 733-9643 Review Date: August 7th, 2019 SDOT Project Summary SDOT approves project ☒ Yes ☐ Yes, with revisions ☐ No ...
0.0030266738 |
a/78281
1adesignchecklist
2024 1 Scoping Yes N/A Comments What is the channelization? Click or tap here to enter text. Are there traffic ...
0.0030266738 |
a/154256
mailer_23rdavee_visionzero_sidewalkwork_final
and mobility on 23rd Ave E/24th Ave E between E Madison St and E Roanoke St as part of our Vision Zero efforts to reach zero ...
0.0030266738 |
a/106725
run_guidelines_including_magnuson
help keep park events well managed, minimize traffic and congestion, neighborhood impacts and keep all of the many daily ...
0.0030266738 |
a/93718
taylorcreekfeb2012meetingsummary
of the proposed plan and noted some of the concerns that have been heard to date from the community. She said she would especially like to ...
0.0030266738 |
a/115629
psbminutes3-15-17
. He said that King Street will be reduced to one lane in each direction. Mr. Astor said he was concerned about the reduction of vehicle ...
0.0030266738 |
a/73808
5d_19-184
the following: • Northbound all day 85th percentile speed 34.7 mph • Southbound all day 85th percentile speed 34.7 mph • Daily ...
0.0030266738 |
a/78259
cityofseattlelegislativebulletinweek8030314
did not advance before cutoff. HB 2244 passed out of the House 87-11 and has been referred to Senate Ways & Means. No hearing has been ...
0.0030266738 |
a/79962
final_mimp_swed cherry hill _letter response to 2023 annual ...
. This inconsistency can make it difficult for commuters to plan their journeys effectively. Even when buses are running, they can be ...
0.0030266738 |
a/163234
johnmuir_flyer
johnmuir_flyer STAY HEALTHY STREETS AND SCHOOLS What is a Stay Healthy Street? Stay Healthy Streets are open for people walking, rolling, ...
0.0030266738 |
a/104086
aki_flyer
aki_flyer STAY HEALTHY STREETS AND SCHOOLS What is a Stay Healthy Street? Stay Healthy Streets are open for people walking, rolling, ...
0.0030266738 |
a/104063
seattledesigncommission-2003.05.012026emadisondesigncommissionmin ...
such as pedestrian patterns, vehicular traffic, and neighborhood needs, and present a nine-square block urban design ...
0.0030266738 |
a/85314
2012.11.01arboretumnorthentrylooptraildesigncommissionminutes
the trail’s connection at Madison near the South Entry.  Consider increasing the width of trail to facilitate two-way ...
0.0030266738 |
a/85089
coretapproceduresforstormandsewermainsfinalforpdfprintable
, the contractor is responsible for transporting core tapping equipment to the tap location and providing alternate power and alternate ...
0.0030266738 |
a/113803
coretapproceduresforstormandsewermainsfinalforpdfprintable
, the contractor is responsible for transporting core tapping equipment to the tap location and providing alternate power and alternate ...
0.0030266738 |
a/111124
4c_19-163
: 7/31/2019 SDOT Project Summary SDOT approves project ☒ Yes ☐ Yes, with revisions ☐ No Comments: In consideration of adjacent land ...
0.0030266738 |
a/78252
birt_iat_agenda_03_18_20
Framework - Traffic Forecast Results and Alternatives - Draft Project and Strategy List Yes Meeting #4 - Technical ...
0.0030266738 |
a/103944
rws communications toolkit
the West Seattle peninsula and improve safety and traffic outcomes in communities along the detour routes – and we need ...
0.0030266738 |
a/101464
2014_0818_delridgegreenway_factsheet
impacts.Greenways can: Help improve safety Help people cross busy streets Discourage cut-thru traffic Protect the ...
0.0030266738 |
a/101984
cf_323176_september2024
Technology SIR Council Bill Description SDOT Closed Circuit Television Equipment "Traffic Cameras" CB 119519 (passed by ...
0.0030266738 |
a/160907
mimpannualreport2017
to the following conditions: 1) that any access to the garage system from Terrace Avenue shall be limited to permit holder entry only and ...
0.0030266738 |
a/76778
7b_19-303
in the 2019 Your Voice, Your Choice: Parks & Streets process. Given the 4-lane channelization of 1st Avenue at Vine Street, a ...
0.0030266738 |
a/78275
3b. 18-805, e aloha st and 14th ave e
: $ 83,298 Solution and Comments: This review has been completed for use in the 2018 Your Voice, Your Choice: Parks & Streets process. ...
0.0030266738 |
a/78081
2020opa-0519ccs080521_pt1
across four lanes of traffic or in Seattle Office of Police Accountability CLOSED CASE SUMMARY OPA CASE NUMBER: ...
0.0030266738 |
a/83385
2024opa-0216ccs11-5-24
) was assigned to direct pedestrian traffic at an intersection outside a Mariner’s game. The Complainant alleged NE#1 ...
0.0030266738 |
a/163572