Filter Results

4801 to 4825 of 11044
02222013arenamou_plaintiffopeningbrief
site. Because construction of a third major sports facility in SODO will result in significant environmental impacts to the human and ...
0.0030266738 |
a/50485
spu_water_projects
offers a unique opportunity to improve traffic flow and meet current drainage code requirements. The projects will be ...
0.0030266738 |
a/61341
2018opa-0523ccs121018
: The Complainant alleged that the Named Employee was rude to the Subject during a traffic stop. ANALYSIS AND ...
0.0030266738 |
a/82468
mimpannualstatusreportjuly2018-june2019
Center, a traffic study shall be conducted in consultation with the SCC Standing Advisory Committee and appropriate City of ...
0.0030266738 |
a/76985
4a_19-158
day 85th percentile speed 27.2 mph • Daily traffic volume 7,968 vehicles • Pedestrian crossings: 117 in one hour (West ...
0.0030266738 |
a/78250
march 2023 seattle eaq evaluation final report
concerns. Initially, we raised concerns about how AVL transmission while using thoroughfares or traffic corridors may ...
0.0030266738 |
a/152199
pspb5-12-21
, constructed in and near the Pioneer Square area, and the traffic and activities that they generate have resulted in ...
0.0030266738 |
a/73827
stadiumdistrictlandusevisioningmeetingnotes
Square is strengthening. We also need to be cautious about adding residential however, because event day surges and noise, as well as ...
0.0030266738 |
a/87721
core_tap_procedures_storm_sewer
for transporting core tapping equipment to the tap location and providing alternate power and alternate water source. 4.2 ...
0.0030266738 |
a/113805
3a_19-103
Nemani Reviewer Phone Number: (206) 733-9643 Review Date: August 7th, 2019 SDOT Project Summary SDOT approves project ☒ Yes ...
0.0030266738 |
a/78240
23rdavenueactionplanphase2june29workshopsummary
speed limits - MLK Jr (23rd, 24th, 25th, 26th) increase crosswalks, NW corner of Powell Barnett Park - 26th & Alder (4 vehicle accidents ...
0.0030266738 |
a/86193
2019opa-0397ccs12-06-19
that he walked directly in front of oncoming traffic and placed himself in potentially danger. The Subject then proceeded ...
0.0030266738 |
a/82911
14thconcordfactsheet
. During that time, SPU will provide updates on specific construction activities and impacts, substantial traffic changes ...
0.0030266738 |
a/114257
2023 oig work plan
issues. In 2023, OIG will develop a SER Panel review of officer involved shootings of persons in crisis. Minor Traffic ...
0.0030266738 |
a/136909
seattledesigncommission-2003.01.16jointtrainingfacilityminutes
011603.doc 2/19/2003 ƒ Proponents stated that there is the possibility not only of drifting odors, but of light and pollution. They have ...
0.0030266738 |
a/85308
2017opa-0746ccs01-19-18
on ICV giving several commands to the subject for him to move out of the street and to therefore allow traffic to move ...
0.0030266738 |
a/81953
spu_drainage_wastewater_projects
was built in the1960s, and its use has exceeded its lifespan. The concrete is now 40 years old and needs to be replaced. Repairing I-5 ...
0.0030266738 |
a/61272
desrptelmonterey
in the area, and the period from 1915-1929 can be considered the neighborhood's commercial heyday. In 1919 an improved University Bridge ...
0.0030266738 |
a/75997
desrpt_cettolin
was regraded to accommodate vehicular traffic navigating the steep hillside from Spokane Street up to Alaska Street and the ...
0.0030266738 |
a/151081
desrpt_cettolin
was regraded to accommodate vehicular traffic navigating the steep hillside from Spokane Street up to Alaska Street and the ...
0.0030266738 |
a/152178
appxb_rehab study
’ wide sidewalk, with 6” depth, on one side of bridge structure. 5) (1) WSDOT 34” Single Slope Traffic Barrier with a ...
0.0030266738 |
a/101037
7d. 17-338, 2nd ave ext s and s jackson st
lights, the audible cues of the traffic are difficult to decipher and one can often hear the audible signal from the 4th ...
0.0030266738 |
a/78152
2019_oct_lettertoneighbors_rose
side of S Rose St between 47th and 48th but, because of the narrow width of the block between 46th and 47th, we need to change the ...
0.0030266738 |
a/104898
isrd2-8-22
to the street. Ms. Baskerville said regarding service access on Jackson Street, there is already vehicular access on 10th where a lot of ...
0.0030266738 |
a/131073
seattledesigncommission-2007.09.20southlakeunionstreetcarminutes
to progression of Art Plan in follow up reviews at the Public Art Advisory Committee (PAAC). o Encourage you to time the ...
0.0030266738 |
a/85407