Filter Results

4076 to 4100 of 11044
appendix b
: MC-TR-C020 Project Title: New Traffic Signals Location: Citywide 701Appendix B: Capital Projects passing the $5 ...
0.00302929059 |
a/63557
2015sinediereport
of tampering with an IID, and makes driving with an open container of marijuana a traffic infraction. Bills Not Passed ↑ ...
0.00302929059 |
a/79793
appendixa_2530adoptedcip
, streetscape, intersection and traffic signal improvements and improving accessibility including ADA-compliant curb ramps. ...
0.00302929059 |
a/166648
edmunds_doorhanger
' No Parking area on both sides to provide motorists a location to yield to oncoming traffic. • Parking on both sides is ...
0.00302929059 |
a/103456
ferdinande_doorhanger
a 40' No Parking area on both sides to provide motorists a location to yield to oncoming traffic. • Parking on both sides ...
0.00302929059 |
a/103457
4193_revised_prelimiaryreport
a high traffic corridor poses a noise nuisance to residential development. The following is documentation of our analysis ...
0.00302929059 |
a/59361
cac_mtg17_design_standards_guidelines
jurisdictions to support the development of traffic calming, and pedestrian crossings consistent with a pedestrian friendly ...
0.00302929059 |
a/76970
sustainableinfrastructureinitiativereport
them) d) ...
0.00302929059 |
a/88176
spd
Enforcement Officers to expand capacity for reviewing automated traffic cameras, adding 7.0 FTE investigative support staff ...
0.00302929059 |
a/160717
2024 may atec presentation to tab
2024 may atec presentation to tab Date (xx/xx/xxxx)Department NamePage NumberSeattle Department of Transportation1Seattle Department of ...
0.00302929059 |
a/163613
7thave_factsheet_nov2016
) 727-86977TH AVE MOBILITY IMPROVEMENTS: TRAFFIC SIGNAL UPGRADES AND A NEW PROTECTED BIKE LANEFall 2016FACT SHEETPROJECT ...
0.00302929059 |
a/99977
7thave_factsheet_oct2017
) 727-8697FACT SHEET 7TH AVE MOBILITY IMPROVEMENTS: TRAFFIC SIGNAL UPGRADES AND A NEW PROTECTED BIKE LANE Fall 2017PROJECT ...
0.00302929059 |
a/99978
impactmatrix_nov2005_v9
(requiring an 8-minute detour across Dravus Street and impacting traffic on 15th Avenue) 14-20 months 8-14 months 6-12 ...
0.00302929059 |
a/101118
wa lawmakers should pass two bills to add accountability to ...
. It isunfathomable that the routine traffic stop of anunarmed motorist could have triggered such anextreme response.But ...
0.00302929059 |
a/138391
cityofseattlelegislativebulletinweek6v2
) Traffic safety cameras Limiting the use of automated traffic safety cameras to detect speed violations ...
0.00302929059 |
a/79979
westseattlebridgeclosure_tab_061020
milestones in the process6Department of TransportationReconnect West SeattleWorking together to identify short-, medium-, and long-term ...
0.00302929059 |
a/117531
northrainiersupplementalrezoneanalysis
. This could result in minor negative impacts such as an increase in shadowing by new structures, replacement of some existing smaller scale ...
0.00302929059 |
a/87315
seattledesigncommission-2016.09.15wsccexpansionminutes
surrounding Terry Ave. Pedestrian access and experienceThe SDC appreciated the design team highlighting the pedestrian experience, but ...
0.00302929059 |
a/86123
2017-12-15 2017 q4 surveillance review report - final
or along a public right-of-way solely to record traffic violations. Q5 Is this technology a camera installed on City ...
0.00302929059 |
a/116972
cityofseattlelegislativebulletinweek7
Bulletin Bill Report Bill # Abbrev. Title Short Description Status Sponsor Last Status HB 1007 (SB 5336) Traffic safety ...
0.00302929059 |
a/79980
uw-annual-report-2024-final
is a decline since 2018. The University made a payment under Condition 62 (Traffic Signals) and is in discussion with SDOT ...
0.00302929059 |
a/156091
spd
for reviewing automated traffic cameras, adding 14.0 FTE investigative support staff over the biennium to assist SPD ...
0.00302929059 |
a/165375
southpassageptpk
and foot traffic as well, it had to be rebuilt in 1902.Its site was Sixth Avenue and the 1-5 Freeway Bridge built in 1962 ...
0.00302929059 |
a/141275
northpassageptpk
to accommodate wagons, horses and foot traffic as well, it had to be rebuilt in 1902.Its site was Sixth Avenue and the 1-5 ...
0.00302929059 |
a/141385
seattledesigncommission2015.05.21seattlearenaminutes
. The 1st Ave S and S Atlantic St corridor is the most critical connection for traffic entering or exiting downtown at its ...
0.00302929059 |
a/85892