Filter Results

376 to 400 of 3805
seattle_ccc_vol_ii_detailed_eval_rpt_appendices_final_8-2014_web
) ....................... H-19 Key Findings ...
0.00217411178 |
a/103931
07262022rpmtgmaterialsbinder
any other municipal utilities.”10 Similarly, the Cuthbert Report finds that the fixed cost charges for ...
0.00217409781 |
a/131608
final_findings_report_reduced
BridgeNorth BridgeSouth BridgeOn-line BridgeINITIAL CONCEPTSREFINED CONCEPTSBEST CONCEPTSThe WSHB long-term planning effort developed ...
0.00217408082 |
a/101335
final report pdf - reduced size
BridgeNorth BridgeSouth BridgeOn-line BridgeINITIAL CONCEPTSREFINED CONCEPTSBEST CONCEPTSThe WSHB long-term planning effort developed ...
0.00217408082 |
a/101334
emails thru 10.20
. Any other profession they would all have been fired.8/30/2021Find it Fix It - reduced maintenance, seeking explanationI ...
0.002173692 |
a/92600
2019-2020proposedbudget
• Community Liaisons • Duwamish River Opportunity Fund • Find It Fix It Walks • Historic Preservation ...
0.00217347615 |
a/63171
2022_proposed_budget
22,531 - Provide Resources For Redistricting 275,000 - Provide Resources for Wealth Education (Equitable Communities Initiative) 1,800,000 ...
0.00217347615 |
a/63575
2006waterconservationsurvey
%). • A small proportion of customers (18%) say they have used a dye tab to check for “noiseless” toilet leaks. If they did ...
0.002173403 |
a/112541
2008standardspecs
Material to be repositioned on the pavement surface before permanently fixing it in its final position ...
0.002173403 |
a/113657
enclosure2
know of anyone,” offered Nicole Grant, the executive secretary-treasurer of the King County Labor Council, a labor group that expects Murray ...
0.002173361 |
a/129783
seattle city light 2022 os
, and monitor these risks and ensure proper segregation of duties. Credit Risk. If a counterparty fails to perform on its ...
0.002172799 |
a/131003
seattle city light 2022 os with errata notice
fails to perform on its contractual obligation, the Department may find it necessary to procure or sell ...
0.002172799 |
a/131376
parks
are included in multiple areas within the plan. SPR has updated its 2017 Parks and Open Space Plan to be consistent with Se ...
0.00217263028 |
a/63242
appendix_d_adu_feis_2018
find the line of reasoning in the DEIS to be spurious and its conclusions, disingenuous. I would like to ...
0.00217247265 |
a/53201
opadirectorreport070013
they left their fixed position, could not immediately find Mr. Patterson, but then located him about one ...
0.0021724354 |
a/83743
2000standardspec
. Plaster (i.e., sheet rock or plaster board) or any other material, other than wood, that islikely to produce gases or leachate during ...
0.002172386 |
a/113651
2019wadohwatersystemdesignmanual-4thedition331-123
criteria: 1. It consists only of distribution or storage facilities without source or treatment facilities. 2. It obtains all ...
0.002172199 |
a/113670
5e2019wadohwatersystemdesignmanual
. It consists only of distribution or storage facilities without source or treatment facilities. 2. It obtains all its ...
0.002172199 |
a/154276
scl salvage unit fraud risk audit report 6_5_14
will not reoccur. We included a recommendation to address this incident in our report3. SCL’s action plans to address the ...
0.002172137 |
a/50627
dprcip
are included in multiple areas within the plan. SPR has updated its 2017 Parks and Open Space Plan to be consistent with Se ...
0.002172137 |
a/63256
sprcip
, or a documented environmental health hazard. Facility Integrity: The project will help keep the facility operational and extend ...
0.002172137 |
a/127129
parks
elements, or a documented environmental health hazard. Facility Integrity: The project will help keep the facility operational and extend ...
0.002172137 |
a/63564
getmovingfinalreportfull
success. The findings from this project point to important next steps Get Moving can take to keep moving by better serving ...
0.002172137 |
a/91836
sohiprfpappendixaitefficienciesstudy092812
is at an important information technology (IT) cross road. This study’s findings point the way toward a Citywide approach ...
0.002172137 |
a/70203
cpc line-by-line review of tentative spog contract
not meet required timelines once OPA completed its investigation and issued its recommended ...
0.00217212667 |
a/52346