Filter Results

376 to 400 of 3463
opadirectorreport070013
they left their fixed position, could not immediately find Mr. Patterson, but then located him about one ...
0.00221910421 |
a/83743
2000standardspec
. Plaster (i.e., sheet rock or plaster board) or any other material, other than wood, that islikely to produce gases or leachate during ...
0.00221905159 |
a/113651
5e2019wadohwatersystemdesignmanual
: 1. It consists only of distribution or storage facilities without source or treatment facilities. 2. It obtains all its ...
0.002218853 |
a/154276
dprcip
are included in multiple areas within the plan. SPR has updated its 2017 Parks and Open Space Plan to be consistent with Se ...
0.00221878686 |
a/63256
sprcip
, or a documented environmental health hazard. Facility Integrity: The project will help keep the facility operational and extend ...
0.00221878686 |
a/127129
parks
elements, or a documented environmental health hazard. Facility Integrity: The project will help keep the facility operational and extend ...
0.00221878686 |
a/63564
getmovingfinalreportfull
success. The findings from this project point to important next steps Get Moving can take to keep moving by better serving ...
0.00221878686 |
a/91836
sohiprfpappendixaitefficienciesstudy092812
is at an important information technology (IT) cross road. This study’s findings point the way toward a Citywide approach ...
0.00221878686 |
a/70203
cpc line-by-line review of tentative spog contract
not meet required timelines once OPA completed its investigation and issued its recommended ...
0.00221877615 |
a/52346
seattle-water-2015-pos-2015
to Pay Bonds If the principal of any Bond is not paid when properly presented at its maturity or date ...
0.00221877615 |
a/107418
seattle-water-2015-pos-2015
to Pay Bonds If the principal of any Bond is not paid when properly presented at its maturity or date ...
0.00221877615 |
a/58569
full2013adopted2014endorsedbudget_000
Overview As the City begins its recovery from the Great Recession, City departments must find efficient ...
0.002218575 |
a/62074
full2013adopted2014endorsedbudget
Auditor released findings of a study of SPD's data analysis capabilities. This study found SPD was in a good position to ...
0.002218575 |
a/62073
030519 corrected healthy food availability food bank network ...
experts, and published studies shaped our approach to developing this report, which has five sections (Figure 1): KEY ...
0.00221855519 |
a/50548
lfs-technical-feasibility-memorandum
............................................................... 5-51 6. Summary of Findings ...
0.00221832353 |
a/135025
lidi5technicalfeasibilitymemorandum
............................................................... 5-51 6. Summary of Findings ...
0.00221832353 |
a/87217
sprcip
updated its 2017 Parks and Open Space Plan to be consistent with Seattle 2035. In addition to the City-wide Comprehensive ...
0.00221825717 |
a/63405
seattle fcc study - strategy options brief_01-24-19
or discounted appliance purchases and retirement funds to its Washington Child Care Business Edge services. (In response to ...
0.00221825717 |
a/55433
sprcip
also updated its 2017 Parks and Open Space Plan to be consistent with Seattle 2035. In addition to the City-wide ...
0.00221825717 |
a/63421
4-5_commentsg-m_marked_mha_feis_2017
construction. She despaired as she considered where she might be able to move to, speculating thiswould not be within Seattle city limits. ...
0.00221815659 |
a/65047
seattle_cctmp04draftfullreport
for urban residential development and discourage auto-oriented development. Because Seattle uses a fixed land use forecast ...
0.002218058 |
a/99458
seattleu_fwp_report_final_mar2016
influential aspect that often finds its way into a collaborative partnership. Armed with the knowledge of ...
0.00221782015 |
a/93150
2023auditorsreport
, or other counterparty, to an investment will not fulfill its obligations. The Core Fixed Income asset ...
0.00221772143 |
a/158251
2022auditorsreport
findings, and certain internal control related matters that we identified during the audit. Required Supplementary ...
0.00221772143 |
a/144412
sprcip
: The project will help keep the facility operational and extend its life cycle by repairing, replacing, and renovating ...
0.00221772143 |
a/134215