Filter Results

3926 to 3950 of 5700
psb5421_met
will restored and the others replaced, Fire escape will be decommissioned, retaining the rails, An outdoor rooftop play area is ...
0.00215752027 |
a/73696
psb5421_met
will restored and the others replaced, Fire escape will be decommissioned, retaining the rails, An outdoor rooftop play area is ...
0.00215752027 |
a/74219
pspb8-5-21
historical, cultural, or architectural values. (7/99) In considering rehabilitation projects, what is critical is the ...
0.00215752027 |
a/73835
seattledesigncommission-2014.09.16sr520montlakelidandportagebaybr ...
seattledesigncommission-2014.09.16sr520montlakelidandportagebaybridgememo Ed Murray Mayor Diane Sugimura Director, DPD Marshall Foster ...
0.00215752027 |
a/85007
sr 520 portage bay bridge montlake lid memo
for the SDC to consider during our deliberations. We understand that WSDOT has adopted the Legislature’s Least Cost ...
0.00215752027 |
a/55981
seattledesigncommission-2016.02.04sr520restofthewestminutes
will include the design and construction of the Montlake lid, land bridge, and West Approach Bridge South (WABS).• Phase II – Includes the ...
0.00215752027 |
a/85955
seattledesigncommission-2020.04.02freewayparkimprovements_minutes ...
WineOffice of Planning and Community DevelopmentSeattle City Hall600 4th Avenue, 5th FloorSeattle, WA 98124TEL ...
0.00215752027 |
a/84840
dadu_submission018
dadu_submission018 ACCESSIBLE DADUsThe 1-story Accessible DADU uses a rectangular plan and open floor concept to enhance ...
0.00215752027 |
a/86812
lpb110624lakecourtpp
& is comprised of five buildings housing a total of 63 unique units.SITE & SETTINGHistoric Maps & Aerial Views + Site Plan1911 Municipal ...
0.00215752027 |
a/162041
centralareadesignguidelinesfinalpresentation
, Inc. On behalf: Congress for the New Urbanism In collaboration with: Schemata Workshop Mimar Studio City of SeattleCentral Area ...
0.00215752027 |
a/86540
seattledesigncommission-2014.11.06dennysubstationpresentation
’ to meet the intent of the requirement. The portion that drops below 25' is important to the architectural response to ...
0.00215752027 |
a/85769
2009src
,theeffectivedateandtitle,andthesectionorsectionsofthisdocument that reference the standard. The application of the referenced standards ...
0.00215752027 |
a/97768
slt_pres
slt_pres architecture design interiorsHISTORIC LANDMARK BUILDING, SEATTLE LABOR TEMPLELandmarks Preservation Board - ...
0.00215752027 |
a/75459
seattledesigncommission-2014.08.07judkinsparkstationminutes
seattledesigncommission-2014.08.07judkinsparkstationminutes APPROVED Seattle Light Rail Review Panel MINUTES OF THE MEETING David Cutler ...
0.00215752027 |
a/84888
minutes11.3.11
minutes11.3.11 Page 1 of 6 Seattle Light Rail Review Panel Julie Bassuk Design Commission LRRP Co-Chair David Cutler ...
0.00215752027 |
a/84915
twrg meeting #8 slides
the information received in meetings but should not identify the speaker or their affiliation.Last meeting we discussed…•Overview of ...
0.00215752027 |
a/168619
id-guidelines
, and translucent materials. 2. Awning shall not cover distinctive architectural features of the building face, nor shall ...
0.00215747487 |
a/72914
sanctuaryhotelcommentletter_draft_20190804
design of buildings proposed under the Swedish Cherry Hill Major Institution Master Plan (MIMP) adopted July 8, 2016. MIMP ...
0.00215747487 |
a/77589
seattledesigncommission-2014.02.06northtransferstationminutes
seattledesigncommission-2014.02.06northtransferstationminutes APPROVED MINUTES OF THE MEETING Ed Murray Mayor Diane Sugimura Director, ...
0.00215747487 |
a/85754
idminutes7-24-18
Architecture and James Wong, Vibrant Cities, on proposed redevelopment plans for the properties at 614 ...
0.00215747487 |
a/73149
lpb12-7-16_minutes
ordinance and The Harvard Belmont District Guidelines: District Ordinance The proposed landscaping plans as presented Dec ...
0.00215747487 |
a/74644
idminutes6-12-18
an appendix, glossary and/or diagram of architectural features / elements existing in district, e.g. cornice. Ms. Hsie ...
0.00215747487 |
a/73139
psb051023flatsr
of signs, flags, and banners, shall be reviewed by the Board and are regulated as set out in this Section 23.66.160. Building owners are ...
0.00215747487 |
a/142291
lpbminutes_10-19-22
Safeways built in Seattle that had the same standard plan had local architectural firms as permit holders ...
0.00215747487 |
a/139564
id-01-13-15-minutes
fixture; installation of an ATM and signage on the south façade, and installation of an illuminated ATM sign (dimensions: 2’ in diameter) on ...
0.00215747487 |
a/72902