Filter Results

3776 to 3800 of 15999
sentinel_event_review_wave_2
to this process. I am also grateful to the SER Planning Group, the OIG Data Team, and our experts and facilitators who ...
0.00225010957 |
a/127811
publiccommentsfromkeydirections062414notes
Comment Sheets returned (pages 17-21) 1- Welcome to Key Directions No comments 2 - What is Seattle’s Comprehensive Plan? ...
0.00225009443 |
a/87626
approvedapr112024meetingminutes
approvedapr112024meetingminutes Seattle Planning Commission, 600 4th Avenue, Floor 5; PO Box 34788 Seattle, WA. ...
0.00225009443 |
a/155720
spr
budget and a decrease by 14% of its capital budget and from 2024, largely due to updating planned bond issuance to align ...
0.00225009443 |
a/160719
lpbcurrentnom_asa_mercer
of Seattle Public Schools with the assistance of Bassetti Architects. 1.1 BACKGROUND The City of Seattle’s Department of Construction and ...
0.00225009443 |
a/74419
asamercerms_nom_application
at the request of Seattle Public Schools with the assistance of Bassetti Architects. 1.1 BACKGROUND The City of Seattle’s Department of ...
0.00225009443 |
a/75133
05-10_adopted_capital_facilities
201,000-square-foot City Hall with over 165,000 usable square feet of office and public space.00600 4th Ave.Civic Center ...
0.00225002528 |
a/60749
lpbminutes10-17-18
of vinyl window decal business signs. Exhibits included plans, photographs and samples. The Hasegawa Professional Building ...
0.00225002528 |
a/75000
2021-22-organicsstreamcompositionstudy
a strict health and safety plan that meets Occupational Safety and Health Administration (OSHA) standards. ...
0.00225002528 |
a/145119
6acsispecificationsforcathodicprotection
psi. 2.19. BOLLARDS A. Per COS standard plan NO. 463 or as noted on drawings. 2.20. ELECTRICAL ...
0.00225002528 |
a/154281
2018auditorsreport
with auditing standards generally accepted in the United States of America. Those standards require that ...
0.00225000386 |
a/95767
2022.04.28_cos_wsble_deisattachmentsbmcommentstopicarea
, and standards that must be met when making or restoring openings in the public right-of-way. The DEIS does not cite ...
0.00224996754 |
a/129362
tmp2016ch6
Strategic Plan has established a network evaluation and operating performance standards system, which will ...
0.00224996754 |
a/105940
lpbcurrentnom_lakecourt_final
design era. Floor plans vary and are non-standardized, making a typical unit difficult to describe. ...
0.00224996754 |
a/161994
lpb110624landmarknominationlakecourtapartments
(informally referred to by tenants as “The Spanish Building”) were built in 1952 and reflect trends that emerged in the Mid-century design ...
0.00224996754 |
a/162159
lpbcurrentnom_lakecourt
. Floor plans vary and are non-standardized, making a typical unit difficult to describe. Interior walls ...
0.00224996754 |
2026_cobra_annual_notice
. All Medicare drug plans provide at least a standard level of coverage set by Medicare. Some ...
0.00224986556 |
a/174689
2025_cobra_annual_notice (1)
. All Medicare drug plans provide at least a standard level of coverage set by Medicare. Some ...
0.00224986556 |
a/161892
spu
of trucks and heavy equipment, and several closed landfills. The Solid Waste Capital Improvement Plan (CIP) supports the ...
0.00224986556 |
a/62991
urbandesignframeworkforthecapitolhilllightrailstationsites
Page 3Seattle Department of Planning and DevelopmentOVERVIEWPurpose and ProcessThe purpose of this Urban Design Framework ...
0.00224986556 |
a/86527
capitolhillstationareaudf
............................................................................................................................................ ...
0.00224986556 |
a/86497
capitol-hill-light-rail-station-sites-urban-design-framework
Rail Station Sites Urban Design Framework Page 3Seattle Department of Planning and DevelopmentOVERVIEWPurpose and ...
0.00224986556 |
a/86460
belltownsmalllotdevelopmentsepadetermination
the proposed development standards are the subject of the SEPA checklist and this decision. ELEMENTS OF THE ENVIRONMENT ...
0.002249862 |
a/86386
2012 annual report_final
project managers. a. Phase I: Required quarterly use of forecasting tool to enable project manager capacity planning; ...
0.002249862 |
a/70102
desrptjohn b. allen school
provided the basis for a flexible and economical approach to school construction. The wooden construction system and ...
0.002249815 |
a/76115
Previous 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 Next