Filter Results

3551 to 3575 of 11044
35thsw_july2015final
travel times Project goals 5 Make 35th Avenue SW safer for everyone Vision Zero Seattle’s plan to eliminate ...
0.00303159584 |
a/104396
35thsw_july2015final
travel times Project goals 5 Make 35th Avenue SW safer for everyone Vision Zero Seattle’s plan to eliminate ...
0.00303159584 |
a/99396
central_area_neighborhood_greenway_open_house_summary_nov_6_13
in the Montlake and arboretum areas. Specific amenity requests, including pavement improvements, traffic circles and speed ...
0.00303159584 |
a/102282
14-06-02_rainier_valley_boards_mtg_1
AADT TripsSEATTLE’S TRAFFIC SAFETY GOALMARCH 2014The Seattle Department of Transportation2012 ROAD SAFETY SUMMITaction ...
0.00303159584 |
a/101962
14-06-02_rainier_valley_boards -_mtg_1
AADT TripsSEATTLE’S TRAFFIC SAFETY GOALMARCH 2014The Seattle Department of Transportation2012 ROAD SAFETY SUMMITaction ...
0.00303159584 |
a/101961
route_40_tpmc_30%_project_corridor_web
Ave and 9thAveProposed Changes▪Maintain general traffic left turn lane▪Maintain middle general traffic ...
0.00303159584 |
a/128528
public_edit_v3_ch8_drainagewastewater_final_redacted
to minimize traffic impacts during maintenance activities (e.g. not in driveways). MH covers should be located outside of ...
0.00303159584 |
a/113871
fap future conditions part ii presentation
tonnage Future freight travel conditions •Population and employment are expected to grow by more than 25% by 2035 •Truck activity will grow ...
0.00303159584 |
a/107242
sli
West Seattle program spending(a)Transit service investments(b)Capital projects to support transit(c)Park and ride facilities(d)Support for ...
0.00303159584 |
a/63484
csb-information-guide
CENTERSUtility payments, passport applications & appointments, pet licenses & traffic ticket paymentsBallard: 5604 22nd ...
0.00303159584 |
a/55301
freight121923transportofhazardousmaterialsord
: 121923 AN ORDINANCE relating to the Traffic Code, amending Sections 11.62.020 and 11.62.040 of the Seattle Municipal ...
0.00303159584 |
a/101674
sfab_mtg_minutes_20191015
on E Marginal Way S and the main entrance is on Fourth Ave S, via S Front St. The project conducted an impact study and paid for the ...
0.00303159584 |
a/101827
sfab_mtg_minutes_20200420
to ensure you/your business has been added to the review list.Future of the Bridge:It is a question of how much useful life repair will give ...
0.00303159584 |
a/101835
20200708_sfab_letter_sdot_director_w_marginal_way_signed
within our freight community. Our concerns are described below. BACKGROUND: Traffic Volumes are increasing: In 2019, ...
0.00303159584 |
a/101797
sfab_mtg_minutes_20191015_newdraft
Way S and the main entrance is on Fourth Ave S, via S Front St. The project conducted an impact study and paid for the construction of a ...
0.00303159584 |
a/101828
sfab_mtg_minutes_20190820_newdraft
separation from traffic, structural barrier ▪ Buffer barrier, landscaping • Preliminary concept analysis, review of ...
0.00303159584 |
a/101824
sdot_emw_northfactsheet_feb.2024
and East Marginal Way S• Rebuilt traffic signal at S Hanford St and new signal at S Horton St • New street pavement to ...
0.00303159584 |
a/153146
sdot_emw_northfactsheet_042424
and East Marginal Way S• Rebuilt traffic signal at S Hanford St and new signal at S Horton St • New street pavement to ...
0.00303159584 |
a/155699
fabmeeting07152014
travel conditions •Population and employment are expected to grow by more than 25% by 2035 •Truck activity will grow faster than regional ...
0.00303159584 |
a/101662
seattleindustrialfeisch3.9
and improve traffic congestion and air quality. A jobs/housing imbalance can cause upward pressure on housing costs. In ...
0.00303159584 |
a/134529
secmeetingminutes041019
. Patrick's Day Parade • SPD requesting to coordinate with Metro to allow general public traffic onto 3rd Ave when 4th Ave ...
0.00303159584 |
a/110177
seattle draft transportation levy proposal
greenways•Repave and improve streets•Bridge repairs and upgrades•New and upgraded traffic signals•Improved lighting in ...
0.00303159584 |
a/163596
q1 2024 levy to move seattle report - final
RapidRide G Line project and receiving $64.2 million in FTA Small Starts Grant Funding for the RapidRide J Line project. • ...
0.00303159584 |
a/157107
ballard_eval_2022
feet apart close to home•Connect you to groceries stores, pharmacies, and businesses•Reduce car traffic to keep you safer ...
0.00303159584 |
a/134840
sclcip
-CL-YN8404): $10,772,049 This ongoing project provides network system design and construction, engineering design at the substation network ...
0.00303159584 |
a/63417