You just searched for:
Search
Filter Results
3526 to 3550 of 11044
sclcip
https://www.seattle.gov/documents/departments/financedepartment/2025propose ...
interface, and underground conversion of the streetlight, traffic signals, and telecom and fiber optic systems. ...
0.00303159584 |
a/63260
scl
https://www.seattle.gov/documents/departments/financedepartment/2025adopted ...
, and underground conversion of the streetlight, traffic signals, and telecom and fiber optic systems. ...
0.00303159584 |
a/63244
sparc080823publicrowbp
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
/xxxx)Department NamePage Number62nd Ave NE between NE 65th St & NE 70th St•Non-arterial concrete street•Bus route•Pavement is failing due ...
0.00303159584 |
a/145196
15physicalsecurityfinalredacted
https://www.seattle.gov/documents/departments/spu/engineering/15physicalsec ...
and sidewalks to increase pedestrian traffic - Large windows with open shades - Points of entry in ...
0.00303159584 |
a/113597
seattledesigncommission-2009.05.19alaskanwayviaductandseawallpres ...
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
.•Provide updated cost estimates for bored tunnel and bored tunnelhybrid alternative to governor and legislature by Jan. 1, 2010. •Complete ...
0.00303159584 |
a/85478
2022solidwaste-chapter6-solidwastehandlingcollectionremoval
https://www.seattle.gov/documents/departments/spu/documents/plans/solidwast ...
dumpsters in high-traffic public right-of-way alleys poses many problems, such as providing cover for uncivil and illegal ...
0.00303159584 |
a/146067
newvisionforfreewaypark-activationplanpps_jan2005
https://www.seattle.gov/documents/departments/parksandrecreation/projects/f ...
of park users.Halprin has expressed the belief that hisdesigns are not necessarily static;in a number of cases,he thinks that theycould be ...
0.00303159584 |
a/93148
5waterinfrastructurefinalredacted
https://www.seattle.gov/documents/departments/spu/engineering/dsg/2024/5wat ...
friction losses, which hinders the air valve’s performance. Where the standpipe assembly is exposed to traffic collisions, ...
0.00303159584 |
a/154278
alki-point-public-presentation_nov2022
https://www.seattle.gov/documents/departments/sdot/stay healthy ...
•Background•Healthy Street Upgrades•Permanent healthy street areas•Traffic control tools•Timeline•Q&APresentation ...
0.00303159584 |
a/152255
10-14-04_minutes
https://www.seattle.gov/documents/departments/parksandrecreation/minutes/20 ...
. This is of interest to the Department as it relates to South Lake Union Park. This traffic revision would make the park ...
0.00303159584 |
a/91967
12-10-09
https://www.seattle.gov/documents/departments/parksandrecreation/minutes/20 ...
Boulevard Traffic-calming Study in Progress: The Arboretum and Botanical Garden Committee (ABGC) requested Seattle ...
0.00303159584 |
a/92073
06-10-10
https://www.seattle.gov/documents/departments/parksandrecreation/minutes/20 ...
with no through traffic appears to be working well. For the Japanese Garden event coming this weekend, Parks staff ...
0.00303159584 |
a/92083
11-03-11
https://www.seattle.gov/documents/departments/parksandrecreation/minutes/20 ...
to have the fence removed. There is limited on street parking adjacent to the park and neighbors expressed concern over increased ...
0.00303159584 |
a/92112
sclcap
https://www.seattle.gov/documents/departments/financedepartment/1924propose ...
This ongoing project provides network system design and construction, engineering design at the substation network interface, and ...
0.00303159584 |
a/63081
greenwoodphinneyguidelines
https://www.seattle.gov/documents/departments/opcd/vault/citywidedesignguid ...
of vital pedestrian streetscapes; ■a pedestrian-friendly walkway from Greenwood Avenue North west into the business core, and improved ...
0.00303159584 |
a/87954
greenwoodphinney2013
https://www.seattle.gov/documents/departments/sdci/about/greenwoodphinney20 ...
pedestrian streetscapes; ■a pedestrian-friendly walkway from Greenwood Avenue North west into the business core, and improved sidewalks; ...
0.00303159584 |
a/96322
2019_0122_greenlakewallingford_factsheet_n80th_final
https://www.seattle.gov/documents/departments/sdot/maintenanceprogram/green ...
a cost-effective opportunity to enhance streets and accomplish our safety and mobility goals, we aren’t able to make design updates ...
0.00303159584 |
a/102952
sclcap
https://www.seattle.gov/documents/departments/financedepartment/1823adopted ...
network interface, and underground conversion of the streetlight, traffic signals, andtelecom and fiber optic systems ...
0.00303159584 |
a/62890
sclcip_000
https://www.seattle.gov/documents/departments/financedepartment/19adoptedbu ...
network system design and construction, engineering design at the substation network interface, and underground conversion of the ...
0.00303159584 |
a/63149
material update – sir forward looking infrared real-time video ...
https://www.seattle.gov/documents/departments/tech/privacy/material update ...
- including theft and recovery (7 events), Assault (6 events), and Burglary (6 events). Other event types include Domestic Violence, ...
0.00303159584 |
a/139487
2021sfcchapter57
https://www.seattle.gov/documents/departments/sdci/codes/seattlefirecode/20 ...
and hydrostatic loading on the floors, walls and lid; anticipated seismic forces; uplifting by groundwater or flood-ing; and to loads ...
0.00303159584 |
a/162539
pedretailareassepachecklist
https://www.seattle.gov/documents/departments/opcd/vault/pedestrianretailar ...
affect your project (for example: traffic, equipment, operation, other)? SEPA Environmental checklist (WAC 197-11-960) ...
0.00303159584 |
a/88126
first-hill-plan
https://www.seattle.gov/documents/departments/neighborhoods/planning/plan/f ...
>, IIeJWvoILIInes of thl-ough and lord traffic, Senec2, incfud-ing the Spring-Senem one-vwy couplet m~est of 9th, is a ...
0.00303159584 |
a/78403
4 - transportation funding plan
https://www.seattle.gov/documents/departments/sdot/boardscommittees/loc/4 - ...
to Move SeattleCompleted (2016-2022)•24 Safety Corridor Projects•171+ Safe Routes to School projects•22 new traffic ...
0.00303159584 |
a/145109
35thsw_july2015final
https://www.seattle.gov/documents/departments/sdot/maintenanceprogram/35tha ...
travel times Project goals 5 Make 35th Avenue SW safer for everyone Vision Zero Seattle’s plan to eliminate ...
0.00303159584 |
a/102845
Previous
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
Next