Filter Results

3501 to 3525 of 5754
professionalprojectfinaljuly13
in Transit CommunitiesInputsShort-term outcomesActivitiesOutputsIntermediate-term outcomesLong-term outcomesCoordination with agencies, ...
0.00219743326 |
a/109272
city_atty_ar_2016
provided an answer within the Seattle Municipal Code and the master use permit issued by the City to the building developer ...
0.00219743326 |
a/50519
rapidride roosevelt nepa ea final
, improvements in air quality, and stormwater benefits. With the mitigation proposed by the Project, the development of additional ...
0.00219743326 |
a/106327
oneseattleplanfeis-chapter3.1-earthandwater
rainfall runoff controls are required to meet permitting requirements that should prevent or minimize adverse impacts. ▪ ...
0.00219743326 |
a/165714
maynard-lane-green-streets-streetscape-concept-plan
collec�on. Mark with significant landscape bed. Preserve recent street improvements made with Dearborn St. repaving project. Use and ...
0.00219743326 |
a/128916
uwwallacehall_nomination_application
Permit as part of its environmental review under the State Environmental Policy Act. The University’s Historic Survey and ...
0.00219743326 |
a/75500
lpbcurrentnom_uw_wallace_hall
of such neighborhood or the City. There is no local ordinance that requires an owner to nominate its property. The City may require a ...
0.00219743326 |
a/74564
counciladopted2016_appendices
demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit data in the table to ...
0.00219743326 |
a/84255
counciladopted2016_appendices
demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit data in the table to ...
0.00219743326 |
a/87524
mayors plan - appendices
and added the net number new units built since that count was taken. (Net new units built is the number of newly built minus the number of ...
0.00219743326 |
a/87601
mayors plan - appendices
and added the net number new units built since that count was taken. (Net new units built is the number of newly built minus the number of ...
0.00219743326 |
a/87424
setsfinadec08
will be revised and likely extended to Mt. Baker Station.The Seattle Bicycle Master Plan recommends sharrows between ...
0.00219743326 |
a/101639
setsfinadec08
will be revised and likely extended to Mt. Baker Station.The Seattle Bicycle Master Plan recommends sharrows between ...
0.00219743326 |
a/99459
11232021rpmtgmaterialsbinder
.The first such plan was submitted (and approved) in 2012. The plan has been updated/revised every 2 years since then, ...
0.00219743326 |
a/51565
sbmp_21march_ch4_bicyclenetwork
will develop more detailed design standards for these facilities as revisions to the Right-of-Way Improvements Manual, ...
0.00219743326 |
a/100195
lpb040523bressipp-web
of an average of 10 feet from the lot line is required for any portion of a structure exceeding the maximum height that is ...
0.00219743326 |
a/140513
2018-12-10 draft sir - parking enforcement - for working group ...
locations. 3. Restricted Parking Zones ("RPZ") means a portion of the street commonly used for vehicular parking where vehicles properly ...
0.00219743326 |
a/117004
counciladopted2018_appendices
the number of units demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit ...
0.00219743326 |
a/87535
counciladopted2019_appendices
the number of units demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit ...
0.00219743326 |
a/87541
counciladopted2017_appendices
the number of units demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit ...
0.00219743326 |
a/87530
counciladopted2020_appendices
of units demolished, based on numbers in the SDCI permit system.) Adding the 1996–2015 permit data in the ...
0.00219743326 |
a/87547
pacific_hospital
LOT09.11.2020 | 20-004 | ©2020 WEBER THOMPSON ...
0.00219743326 |
a/75398
framework_plan_full
that includes new short term parking • better utilization of existing parking near the waterfront using real time information (signs ...
0.00219743326 |
a/171983
spu technical resources_cad review process
to standards. This ensures that all documentation is ready for final approval, permitting, or construction. • 100% Review: ...
0.00219743326 |
a/176575
tab meeting minutes 06.25.25
: 1. Land Use Code Amendments a. Streamline Master Use Permit Process b. Create project-level Preliminary Construction ...
0.00219743326 |
a/177159