Filter Results

3451 to 3475 of 11044
caoannualreport2009
laws, environmental regulations and contracts. The Public and Community Safety Division (now Criminal) is the criminal branch of the office. ...
0.00303159584 |
a/50255
2018_829_fairview_factsheet
to share information about what to expect and understand community needs during constructionFAIRVIEW AVENUE NORTHBRIDGE REPLACEMENT ...
0.00303159584 |
a/100814
sdot_levy_proposal_folio_may2024
streets, sidewalks, bridges, and traffic signals. The Levy to Move Seattle, which expires at the end of 2024, represents ...
0.00303159584 |
a/155966
2016_0317_2ndave_mailer_final
and protected bike lane extensionTo improve the safety and efficiency of travel and bike connections downtown, the Seattle Department of ...
0.00303159584 |
a/99884
south park home zone survey_english_final
of public safety, the Seattle Department of Transportation (SDOT) closed the West Seattle High-Rise Bridge to all vehicle ...
0.00303159584 |
a/104031
madisonbrt_aug2016_openhouseboards
traffic, with no restriction. Bus-only lanes are painted red.Business access and transit (BAT) lanes are bus-only lanes. ...
0.00303159584 |
a/106162
2020_1218_south park survey_wsb updates_english_final
, in the interest of public safety, the Seattle Department of Transportation (SDOT) closed the West Seattle High-Rise Bridge to all vehicle ...
0.00303159584 |
a/103993
2020_1218_south park survey_wsb updates_english_final (1)
, in the interest of public safety, the Seattle Department of Transportation (SDOT) closed the West Seattle High-Rise Bridge to all vehicle ...
0.00303159584 |
a/103992
improving equity, fairness, and accessibility at the seattle ...
into account and supported. > Juveniles with a record have a fresh start as adults. Individuals with Infractions Over half of participants ...
0.00303159584 |
a/54800
portagebaynotessept2015
, ducks, etc.) • Skip the parking/fan of less parking • Fill should be engineered – liquefaction area • Boat traffic – ...
0.00303159584 |
a/93477
portagebayopenhousenotes
, ducks, etc.) • Skip the parking/fan of less parking • Fill should be engineered – liquefaction area • Boat traffic – ...
0.00303159584 |
a/93480
seattlebikesharepermitrequirements2018
on each device as part of their rider education plan. All devices must inform riders of King County’s helmet law. The signage program must ...
0.00303159584 |
a/100214
yvyc-glossary
yvyc-glossary Your Voice, Your Choice: Parks & Streets 2017 Project Glossary Many of these projects are examples of traffic ...
0.00303159584 |
a/78182
cam2501
orparking pay stations, traffic signs, SDOT andutility poles, fire hydrants, bike racks, and otherstreet fixtures;o10 feet ...
0.00303159584 |
a/104203
sdot_levy_proposal_folio_may2024_spreads
to our streets, sidewalks, bridges, and traffic signals. The Levy to Move Seattle, which expires at the end of 2024, ...
0.00303159584 |
a/155965
adopted010715meetingsummary
, a famous 5000-acre urban forest. The park is beloved, and its nature trails are well-used by foot traffic. It is also ...
0.00303159584 |
a/118456
draft010715meetingsummary
, and its nature trails are well-used by foot traffic. It is also heavily affected by invasive plants. In many places, the ...
0.00303159584 |
a/118477
dpdnorthrainierrezonedirectorsreport
traffic. The area is largely built-out so impacts on natural systems are limited. Minor negative impacts described above ...
0.00303159584 |
a/87297
2024opa-0020ccs6-30-24
Page 4 of 14 v.2020 09 17 CM#1, in the black vehicle, veered from NE#1’s vehicle. CM#1 drove into oncoming traffic on ...
0.00303159584 |
a/158351
rainier_buslane_phase2_survey_english
rainier_buslane_phase2_survey_english Rainier Ave S Bus-Only Lane: Phase 2 Alternatives Typical ExistingTwo general traffic ...
0.00303159584 |
a/137393
ufmpupdatedraft070312
et.al. 1998)2. Street trees keep streets and sidewalks cool in the summer and provide scale and interest in the winter. They also calm ...
0.00303159584 |
a/119386
birt_iat_notes_may_21_2020
of the study area and the traffic inputs that were adapted for use in this project (as the team was unable to conduct new ...
0.00303159584 |
a/103956
cnseattle_technical_appendix_may_2011
, and traffic signals that allow for safe and efficient movement by all modes of travel. Providing infrastructure intended ...
0.00303159584 |
a/57389
cnseattle_technical_appendix_may_2011
, and traffic signals that allow for safe and efficient movement by all modes of travel. Providing infrastructure intended ...
0.00303159584 |
a/88271
2019_0723_greenlakeprogram_fs_n80th
and accomplish our safety and mobility goals, we aren’t able to make design updates everywhere. N 80th St is a high-traffic ...
0.00303159584 |
a/102967