You just searched for:
Search
Filter Results
3351 to 3375 of 14293
sbab_oct2015meetingminutes-final
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/mi ...
100,000 jobs downtown while reducing car traffic. Group includes Scott Kubly and Kevin ...
0.00310118822 |
a/107100
sbab_oct2015meetingminutes-final
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/pr ...
100,000 jobs downtown while reducing car traffic. Group includes Scott Kubly and Kevin ...
0.00310118822 |
a/107196
notes20180321
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
was the morning drop-off traffic congestion. The number of parking spaces does not address that issue but added that a tool ...
0.00310118822 |
a/77951
mhcminutes4-12-17
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
: Ms. Vaughan said produce should be placed where the most traffic passes by. Mr. Ogliore said the URC reviewed a lot. ...
0.00310118822 |
a/73604
sbabsep2015minutes_final
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/mi ...
involved collecting an immense amount of data, including traffic volume, speed, turning ...
0.00310118822 |
a/107093
january7minutes_final
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/mi ...
that be a parallel route option for car traffic? Or does it automatically mean ...
0.00310118822 |
a/107066
melrosepromenade_jan.10businessmeetingsummary
http://www.seattle.gov/documents/departments/sdot/bikeprogram/melrosepromen ...
, preliminary traffic control plans, and anticipated construction impacts. The meeting included a presentation and ...
0.00310118822 |
a/100125
dns_analysis-gwp_comfort station
http://www.seattle.gov/documents/departments/parksandrecreation/projects/ga ...
3 January 25, 2021 construction activities; potential soil erosion and disturbance to subsurface soils during site work; increased noise ...
0.00310118822 |
a/93152
key arena and nodo map
http://www.seattle.gov/documents/departments/sdot/bikeprogram/key arena and ...
to the heavy increase in traffic and competition for limited right-of-way that is anticipated with the Key Arena ...
0.00310118822 |
a/100099
appendix_b_vision_zero_top_to_bottom_review_outreach_summary
http://www.seattle.gov/documents/departments/sdot/visionzero/toptobottomrev ...
on his first day on the job to provide an assessment of the department’s progress towards meeting Seattle’s Vision Zero goal to end ...
0.00310118822 |
a/145115
crown-hill-table-notes_final
http://www.seattle.gov/documents/departments/council/members/johnson/commun ...
• Creating opportunity for creating additional parking by developers • Consensus: Not enough discussion re parking o Commitment needed o No ...
0.00310118822 |
a/54144
approvedjun13meetingminutes
http://www.seattle.gov/documents/departments/seattleplanningcommission/minu ...
project, I looked at Oman and analyzed how traffic safety is addressed and potential lessons that Vision Zero could take ...
0.00310118822 |
a/158499
cam2109
http://www.seattle.gov/documents/departments/sdot/cams/cam2109.pdf
structures or leaks, should be responded to immediately. The emergency permit needs to be submitted to Street Use within 24 hours of the ...
0.00310118822 |
a/101599
trnguide10-5
http://www.seattle.gov/documents/boardsandcommissions/civ/publicsafetycivil ...
) Electrical Shock Hazards Engulfing Agents (See appendix D) Traffic (See appendix E) Terrain Mechanical ...
0.00310118822 |
a/95273
mbdag14summary624
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/bridg ...
where truck traffic routes would be needed to serve businesses on the Port’s property. Lamar also pointed out where a ...
0.00310118822 |
a/101156
lidi5preliminarystructuralfeasibilityworkshopsummary
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/lidi5f ...
review; this would need to be performed in future phases of work ...
0.00310118822 |
a/87211
i5lid_consultantqa
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/lidi5f ...
on foot, especially at I-5 entry and exit points restricted to the connections and conflicts at the entry to the ROW only or is there meant ...
0.00310118822 |
a/87187
notes-2013-11-07(0)
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
included in these preliminary documents. The transportation analysis will provide data and evaluate the impacts on both ...
0.00310118822 |
a/77430
i5lid_consultantqa_final
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/lidi5f ...
and conflicts at the entry to the ROW only or is there meant to be additional consideration given to the traffic flows on ...
0.00310118822 |
a/87188
spd
http://www.seattle.gov/documents/departments/financedepartment/03-04budget/ ...
, and reducing the Community Service Officer Program and the School Crossing Guard Program. Misdemeanor warrants will continue to be ...
0.00310118822 |
a/60512
idminutes8-25-20
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
approval of a Certificate of Approval for modifications within the right-of-way, including: a new traffic signal at S. King ...
0.00310118822 |
a/73155
2023opa-0444ccs4-3-24_remediated
http://www.seattle.gov/documents/departments/opa/closedcasesummaries/2023op ...
), police traffic collision report, traffic crash report, NE#1’s warrant application, Washington State ...
0.00310118822 |
a/175591
seattledesigncommission-2003.09.04bitterlakereservoirminutes
http://www.seattle.gov/documents/departments/opcd/designcommission/projecta ...
the potential solutions only from the standpoint of traffic flow. Both Commissions would like theViaduct team to analyze ...
0.00310118822 |
a/85323
isrd_10020_draft_minutes
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Greenway. In February 2019, the Board recommended approval of a Certificate of Approval for modifications within the right-of-way, ...
0.00310118822 |
a/73332
wsb_survey_wseattle_ballot_english
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/west ...
out neighborhood prioritization process ballot by July 31st. The unexpected closure of the West Seattle High- Rise Bridge has had major ...
0.00310118822 |
a/101574
Previous
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
Next