Filter Results

3326 to 3350 of 3904
pspbminutes4-3-19
. Ms. Miles proposed bike lockers at King Street Center which is private property. She said it is a quad locker for four bikes. She ...
0.002189833 |
a/74071
seattledesigncommission-2008.02.07pedestrianmasterplanminutes
radii? o Yes, that will be an important part of the discussion. Key issues will be anything relating to speed, intersection design, ...
0.002189833 |
a/85418
planning commission letter re seattle 2035 section 2
open space, green space, trees and other mature vegetation.Is this for all parks? Are there parks that are an automobile ...
0.002189833 |
a/108155
psb8-3-16_minutes
explained that outreach was done to district stakeholders. He said that installation will be via Hilti Kwik bolt expansion anchor at a 3” ...
0.002189833 |
a/73786
su_minoramendmentletter
regarding the 1300 Columbia property: • The existing parking lot already has existing and well established landscaping including ...
0.002189833 |
a/77318
uwmc_nwcampus_dac_minutes_2024-01-22
Response – Alternative #3 NEW (map) SLIDES 16, 17, 18 19, 20, 21 (21:38) Alternative #3 NEW: Heights SLIDE 22, 23 (24:53) ...
0.002189833 |
a/152711
spc 2035 element comments revised staff draft nov 6
space, green space, trees and other mature vegetation.Is this for all parks? Are there parks that are an automobile draw ...
0.002189833 |
a/109207
psbminutes2-20-19
signs shall occupy the sidewalk only during business hours and cannot be chained to trees, parking meters, etc. (12/94) ...
0.002189833 |
a/73806
mtgnotes_20250416
willingness to present and answer questions from the community and elected officials. The City Light Communications team created a handout ...
0.002189833 |
a/168131
pspbminutes1-17-18
at street level in the area designated on Map B for 23.66.130 require the approval of the Department of Neighborhoods ...
0.002189833 |
a/74049
stp deis comment letter draft 10.6.23 - final for approval
in a clear and easy-to-follow format. The document includes helpful supporting tables and graphics such as: o Summary of Network Changes by ...
0.002189833 |
a/148255
ipmwebinardescription-102820
through habitat creation and protecting bees and other beneficial insects from pesticides. Thoughts on Managing Tree in ...
0.002189833 |
a/113349
lpbminutes_11-22-22
of the Duwamish Tribe. The Duwamish and other Native Coast Salish peoples of the Puget Sound region have lived in the area, including what ...
0.002189833 |
a/139567
agenda 12_11_24
– 3:30 Urban Forestry Story Map, Interim Update (Lauren Urgenson, OSE) 3:30 – 3:50 Presentation: City ...
0.002189833 |
a/163377
uwmc_nwcampus_dac_notes_meeting 9
approves the section. 2. Landscape, Open Spaces, Stormwater, Tree Preservation (Andy, Kippy) No changes were made. DAC ...
0.002189833 |
a/151968
green_lake_outer_loop_qa
phase and will be exploring both stop-control and yield-control options. Final design is scheduled to be completed summer of 2022 and will ...
0.002189833 |
a/100589
green lake outer loop q&a
phase and will be exploring both stop-control and yield-control options. Final design is scheduled to be completed summer of 2022 and will ...
0.002189833 |
a/100583
green_lake_outer_loop_q&a
phase and will be exploring both stop-control and yield-control options. Final design is scheduled to be completed summer of 2022 and will ...
0.002189833 |
a/100588
green lake outer loop q&a (final)
design phase and will be exploring both stop-control and yield-control options. Final design is scheduled to be completed summer of 2022 and ...
0.002189833 |
a/133588
introcap
trees and construction of a retaining wall at Brooklyn Ave NE between 50th and 52nd St SDOT 59,000 Northeast 2015-098 ...
0.002189833 |
a/62350
lpbminutes7-17-19
the language regarding review of removal of trees has been changed from 8” to 6” diameter. Mr. Coney asked for ...
0.002189833 |
a/75043
lpbminutes7-1-20
x 60’ long 3 recess that allows abutment for new Fairview Avenue bridge. He proposed low landscape on the lid with landscape at north end ...
0.002189833 |
a/163348
sdot - dr - employer shared transit stops - d-2022
– A description of the waiting/boarding area at the bus stop including condition of the concrete, planting strip and adjacent landscaping, ...
0.002189833 |
a/135916
spc_transitcommunitiescompplanamendment
and conditions. Seattle Planning Commission – DRAFT Transit Communities 2012 Comp Plan Proposal Land Use Element line-in/line out ...
0.002189833 |
a/109275
cen_projects
Pavilion, a facility completed in 2002. The plan provides a long-term road map for future major maintenance investments in ...
0.002189833 |
a/61677