Filter Results

3301 to 3325 of 11044
overview
2010 investments will prepare the City for the pending construction by improving traffic flow throughout the City's major ...
0.00303159584 |
a/61710
pspbminutes_5-15-24
” and noted the location in a transition zone between districts and the distance plus four lanes of vehicle traffic between ...
0.00303159584 |
a/163991
notes-2013-12-05
and state that the height, bulk, scale, shadowing, and traffic impact do not represent a balance envisioned by the code and ...
0.00303159584 |
a/77433
notes-2013-12-05(0)
and state that the height, bulk, scale, shadowing, and traffic impact do not represent a balance envisioned by the code and ...
0.00303159584 |
a/77432
seattledesigncommission-2003.03.06gasworkssiteplanminutes
to get them to allow the angled parking to be front-in parking. For locations with high traffic it makes sense to back-in, ...
0.00303159584 |
a/85311
introduction
of the project is expected to be completed in 2012. Many 2010 investments will prepare the City for the pending construction by improving ...
0.00303159584 |
a/61700
2015_response.esf14annex
/impact assessment, temporary service provision, traffic control, temporary space for displaced ...
0.00303159584 |
a/56686
lakecitynotesmarch2014
corridor in the mid-1990s study that preceded the neighborhood plan. Katie mentioned that WDOT has done a more recent study ...
0.00303159584 |
a/86244
seattledesigncommission-2002.09.19calandersonparkminutes
. This creates a new east-west axis across the site. The west entry is expected to host the most traffic and will therefore ...
0.00303159584 |
a/85301
3040025-sd decision
of bulk; 4. Impacts on traffic, noise, circulation, and parking in the area; and 5. Impacts on housing and open space. More ...
0.00303159584 |
a/142815
childrensacfinalnotesmeeting_29
at the last meeting about the overall general traffic movement along 40th and the preference to convey to the public that ...
0.00303159584 |
a/140688
opa_auditor_semi-annual_report_july-december_2014
clarification would still be helpful was in regard to an officer who failed to appear for traffic citation hearings. The ...
0.00303159584 |
a/80748
pspbminutes_2-7-24
be a change in traffic flow. Mr. Dusciuc said there would be no change to lane configuration. Action: I move to recommend ...
0.00303159584 |
a/154528
seattlecentersigndistrictordinance
23.55. 12 6. Signs that attempt, or appear to attempt, to direct the movement of traffic 13 or that interfere with, ...
0.00303159584 |
a/96606
about-wmbe-committee-members-public
about-wmbe-committee-members-public ...
0.00303159584 |
a/58983
2017opa-1283ccs092118
to loud traffic, he had difficulty hearing the Complainant. NE#1 stated that he asked the Complainant multiple times to ...
0.00303159584 |
a/82168
1a_19-3
, with revisions☐NoComments: The traffic data supports installing a Rapid Rectangular Flashing Beacon (RRFB) on the east ...
0.00303159584 |
a/78221
1a,19-3,intersection of sw admiral way and 44th ave sw. crosswalk ...
: (206)684-5102Review Date: August 9th, 2019 SDOT Project Summary SDOT approves project ☐Yes☒Yes, with revisions☐NoComments: The ...
0.00303159584 |
a/78896
upcoming_opps_2020_7.21
: (206) 684-ROAD Tel: (206) 684-5000 Fax: (206) 684-5180 Web: www.seattle.gov/transportation An equal opportunity employer. ...
0.00303159584 |
a/99822
5j. 18-592, ne 145th st and 30th ave ne
5j. 18-592, ne 145th st and 30th ave ne YVYC 2018: 18-592, NE 145th St & 30th Ave NE 2018 Project Review Sheet (2019 Construction) City ...
0.00303159584 |
a/78126
5j. 18-592, ne 145th st & 30th ave ne
5j. 18-592, ne 145th st & 30th ave ne YVYC 2018: 18-592, NE 145th St & 30th Ave NE 2018 Project Review Sheet (2019 Construction) City ...
0.00303159584 |
a/78125
seattledesigncommission-2014.01.23waterfrontminutes
open space in Belltown. The project intends to connect the Pike Place Market and Belltown to the waterfront while providing quality bicycle ...
0.00303159584 |
a/86022
2018opa-0256ccs09-10-18
that he was subjected to biased policing by the Named Employee during a traffic stop. ANALYSIS AND CONCLUSIONS: Named ...
0.00303159584 |
a/82342
centralridge_greenwaysr_factsheet
with crosswalks, flashing beacons, or traffic signals• Speed humps to calm traffic• Stop signs for side ...
0.00303159584 |
a/102030
alkipoinths_factsheet_dec2022
, and other traffic calming. The Alki Point Healthy Street runs on Beach Dr SW and Alki Ave SW from the north end ...
0.00303159584 |
a/152254