Filter Results

3276 to 3300 of 3917
center_projects
Preservation Plan for Fisher Pavilion, a facility completed in 2002. The plan provides a long-term road map for future ...
0.002189833 |
a/61428
revised draft 2022-2023 docketing letter_7.8.22
Selection, included in Resolution 31807 (Attachment A). The Planning Commission recommends the following amendment proposals not move ...
0.002189833 |
a/131197
mar132008approvedminutes
and the tree canopy at the same time should be considered possible. Mr. Nicholas noted that the aura around property rights ...
0.002189833 |
a/108881
2020 project pauses
the community, an elected leader, or a colleague to drive positive change for a growing Seattle. The amount of time and energy it takes to ...
0.002189833 |
a/99546
wmbe-goals-2014
and operating Seattle’s multi-billion dollar transportation infrastructure;  Managing short-and long-term investments in streets, bridges, ...
0.002189833 |
a/99828
interbayworkinggroupmeetingnotesdecember52012
Conditions A series of existing conditions maps were developed and presented to the working group (Draft maps
0.002189833 |
a/86331
interbayworkinggroupmeetingnotesdecember52012
Conditions A series of existing conditions maps were developed and presented to the working group (Draft maps
0.002189833 |
a/87009
3.21.2025 stsc meeting
of that turn to see if it could work with bollards or trees. Could the sidewalk be widened there or elsewhere? Could we get ...
0.002189833 |
a/168645
august262010approvedminutes
. Ms. Wilson provided brief updates about the Commission’s review of the proposed South Downtown legislation and the proposed ...
0.002189833 |
a/108444
affordablehousingdrordinance
. Commercial; 23 c. Seattle Mixed; 24 d. Downtown; and 25 e. Stadium Transition Area Overlay District as shown in Map A for ...
0.002189833 |
a/139082
rko-distributing-company-building-designation
of the block on the east of Second Avenue, between Bell and Battery streets. This stretch of Second Avenue has been improved with numerous ...
0.002189833 |
a/76512
desrptrko
, between Bell and Battery streets. This stretch of Second Avenue has been improved with numerous evergreen and deciduous street ...
0.002189833 |
a/76221
madison-miller-summary-of-themes-final
madison-miller-summary-of-themes-final Seattle Neighborhood Workshops SUMMARY THEMES Madison Miller ** Please also see map ...
0.002189833 |
a/54184
eastlake-summary-of-themes-final
eastlake-summary-of-themes-final Seattle Neighborhood Workshops SUMMARY THEMES ** Please also see map of potential zoning ...
0.002189833 |
a/54183
attachment b - 2022 vehicle license fee spend plan
Spend Plan in the 2022 Budget. Safe Sidewalks | $2.3 million is allocated to improving sidewalk safety. • Repair sidewalks, focusing on ...
0.002189833 |
a/104173
05-10_index_adopted
Evaluation Program...................................277 Colman Park - Trees Settlement...............................70 ...
0.002189833 |
a/60786
strategicinitiativessummaryjan2019
) increasing awareness of City Light’s many environmental achievements with an environmental report and website. Key accomplishments ...
0.002189833 |
a/51513
slurry seal 2022 notice 1 2024
” treatment on selected blocks in your neighborhood to extend the life of the pavement. (See reverse side of this flyer for ...
0.002189833 |
a/158211
missinglink11.15.07_openhouse_comments
11th Ave. NW to Ballard Locks Extension Project organizers provided comment forms for attendees to submit, as well as flip charts for ...
0.002189833 |
a/100510
slurry seal 2021_english
” treatment on selected blocks in your neighborhood to extend the life of the pavement. (See reverse side of this flyer for ...
0.002189833 |
a/103043
05-10_proposed_cip_index
- Trees Settlement...............................65 Colman School - African American Heritage ...
0.002189833 |
a/60836
2013-2018-strategic-initiatives-summary-finalreport
values, and 2) increasing awareness of City Light’s many environmental achievements with an environmental report and website. Key ...
0.002189833 |
a/51064
center
for Fisher Pavilion, a facility completed in 2002. The plan provides a long-term road map for future major maintenance ...
0.002189833 |
a/61485
desrptuwcanoe house
. The building is oriented toward the water rather than toward the campus, and is screened on the north by mature trees. ...
0.002189833 |
a/76293
desrptuw_canoe house
. The building is oriented toward the water rather than toward the campus, and is screened on the north by mature trees. ...
0.002189833 |
a/76296