Filter Results

3126 to 3150 of 3932
appendix_e_route_40_esa_no_effect_memo
Page 2  Project Area of Potential Effect (APE) maps  Google Earth Pro aerial and street-level photography  National ...
0.00219216617 |
a/142747
opcdlcipfundingplan
street from Mercer to John with an enhanced green street environment that could serve as a woonerf. The project will likely include widened ...
0.00219216617 |
a/87688
pspb081022glsectionhistoryintro
sophisticated fishing techniques using nets, weirs, and hooks, used cedar trees to create canoes, baskets, clothes and ...
0.00219216617 |
a/132190
sdotcap_000
facilities, • More than 180,000 signs, • 41,000 street trees, • 2,018 pay stations, and • 29,073 curb ramps. SDOT’s 2016 ...
0.00219216617 |
a/62355
249transportation
retaining walls, 22 miles of seawalls, 1,060 signalized intersections, 47 miles of bike trails, more than 200 miles of on-street bicycle ...
0.00219216617 |
a/61971
seattledesigncommission-2017.01.05portagebayparkminutes
wide concrete curb stamped with text and/or maps highlighting the history of the project site. The pathway will terminate ...
0.00219216617 |
a/85081
23rdavenueactionplanphase2draftstrategies
fabric, while full of mature trees and historic architecture. It is layered – new and old; youth and elders; a single ...
0.00219216617 |
a/86192
centralareastatusreport
- beleaguered district, - must be attributed to the success of the original CAAP itself- which laid out a road map for ...
0.00219216617 |
a/86208
2015-council-work-program
guidance for adding a district map overlay or data filter feature. Research other cities with similar governance ...
0.00219216617 |
a/53340
pldp_beta publication - 20170927
data (e.g., location of trees, quality of storefronts) to support the quantitative observational studies.WHY IS A PUBLIC ...
0.00219216617 |
a/133151
othelloneighborhoodactionplan
; activating public spaces with vendors; business district marketing map and brochure; and establishing its identity as the ...
0.00219216617 |
a/88098
seattle_city_light
VillageThe project replaces the existing Energy Management System (EMS). The project includes (but is not limited to) replacing portions of ...
0.00219216617 |
a/61981
sdotcap
of multi-purpose trails338 miles of on-street bicycle facilitiesMore than 180,000 signs41,000 street trees2,018 pay ...
0.00219216617 |
a/62545
ose
, as well as staffing and policy coordination for tree planting efforts. • $1,050,000 for the Environmental Justice Fund.  ...
0.00219216617 |
a/160709
transportation
retaining walls, 22 miles of seawalls, 1,060 signalized intersections, 47 miles of bike trails, more than 200 miles of on-street bicycle ...
0.00219216617 |
a/61992
ose
, and recreational programming.•$500,000 for urban forestry, including $300,000 for greening industrial zones in the Duwamish Area, as ...
0.00219216617 |
a/165356
351seattlecitylight
map board and all of the front end processors, implementing a hot EMS off site backup (Backup Control System) with live ...
0.00219216617 |
a/61972
newhalem_20221104_sclresponsescopingdoc1comments
and lateral scarps, which has likely increased due to the 2015 wildfire that burned most trees in the area. The unraveling ...
0.00219216617 |
a/145997
south park check-in_reconnect west seattle
:Add mature tree plantings to reduce noise impacts, create a rebate program for air purification system due to the severe ...
0.00219216617 |
a/101505
northrainierneighborhoodplanupdate2010
of trees and open space. At the same time, the update process has made clear that sustainability does not need to be set ...
0.00219216617 |
a/87307
1.transportation
of seawalls,1,061 signalized intersections,47 miles of bike trails,338 miles of on-street bicycle facilities,More than 170,000 ...
0.00219216617 |
a/62366
sdotcap
,1,061 signalized intersections,47 miles of bike trails,338 miles of on-street bicycle facilities,More than 170,000 signs,41,000 street ...
0.00219216617 |
a/62381
northrainierneighborhoodplanupdateprintable2010
infrastructure of trees and open space. At the same time, the update process has made clear that sustainability does not ...
0.00219216617 |
a/87308
industrialzoningsummary
and entertain-ment uses: 10,000 square feet. Office uses: 10,000 square feet. Some exceptions apply to maximum size of use limits ...
0.00219216617 |
a/96554
northrainiersupplementalrezoneanalysis
– 40 to Seattle Mixed 65. A summary of this additional rezone proposal, in addition to what was originally proposed, is shown in ...
0.00219216617 |
a/87315