Filter Results

3126 to 3150 of 5679
lpbminutes_2-2-22
the “gate house” at the beginning of the loop is inserted into plans and doesn’t reference the site; she suggested it be ...
0.00216602115 |
a/131134
lhes sdci decision-recommendation
Architectural Review Committee. According to the District the landmark designation limits the District’s choices to provide ...
0.00216602115 |
a/76820
idminutes3-28-17
installation of a split air conditioning system to be installed on top of the canopy above the storefront. Exhibits included ...
0.00216602115 |
a/73126
seattledesigncommission-2006.07.06presbyterianretirementhousingal ...
Hoffman Karen Kiest Anindita Mitra Sheri Olson Nic Rossouw Dennis Ryan Darrell Vange Guillermo Romano Executive Director Layne Cubell, ...
0.00216602115 |
a/85385
copyofseattledesigncommission-2015.08.06cedarfallsminutes
) is developing a master plan for it’s Cedar Falls Watershed Headquarters located in North Bend, WA. The project consists ...
0.00216602115 |
a/85138
opcdpreapproveddadusurveysummary
opcdpreapproveddadusurveysummary 1Pre-approved Plans for Accessory Dwelling Units Survey ResultsIn July 2019, the City of ...
0.00216602115 |
a/86965
1005_s_king_plan_set
meetings.Massing and Architectural treatment• The overall planning approach of the project was presented ...
0.00216602115 |
a/73284
drainage_system_facilities_2019_checklist
2. Name of applicant: Seattle Public Utilities (SPU) 3. Address and phone number of applicant and contact person: Brenda Gardner, Project ...
0.00216601044 |
a/112869
maplewoodplayfielddns-signed
(June 15, 2023). Written comments must be submitted by ____June 29, 2023______. Responsible official: Mike Schwindeller Position/title: ...
0.00216601044 |
a/143667
commercialandselfhaulwastestreamscompositionstudy2012
. Please see Appendix B for a detailed description of the methodology. Step 1: Develop Sampling Plan  A total 270 ...
0.00216601044 |
a/112789
adopted020613ufcmeetingsummary
an operational plan to address conflicts between trees and sidewalks. 34th Ave in Madrona. Sidewalk repairs would require ...
0.00216601044 |
a/118193
may9-2013approvedminutes
disclosed that her firm, SvR Design, works on projects that could be impacted. ‐ Commissioner Matt Roewe disclosed that his firm, Via 
0.00216601044 |
a/108989
rainierbeachinnovationdistrictreport
Architecture,  under  contract  with  DPD,  has  worked  with  these  partners  to  develop ...
0.00216601044 |
a/87369
constpermitcklisttenantimprovecomm
surface.SCREENING & SUBMITTAL CHECKLIST Commercial Tenant Improvement Additions & Alterations ARCHITECTURAL ...
0.00216601044 |
a/97920
3324-preliminaryreport11102017
), developing objective criteria, marketing plan and review of responses to the RFP; • Issue the RFPs, allowing respondents ...
0.00216601044 |
a/59253
greenhomeguide-salvage
. With careful planning, you can create a home that combines beauty, efficiency, comfort and convenience with health and ...
0.00216601044 |
a/88409
volunteerparkdriveplaza_coa_presentation
. Seattle Department of Parks and Recre-ation investigated repair alternatives and conduct-ed an initial briefi ng with the ...
0.00216601044 |
a/75509
wa_park_presentation
Modifications Site Plans ....................................................... 4 Project Concept ...
0.00216601044 |
a/74264
december2024ctabminutes
Maritza Rivera will be leading the committee on that. She chairs the Department of Neighborhoods, and DEAL, the Department of Early ...
0.00216601044 |
a/164245
sepa checklist routine drainage maintenance 040319
Planning and Analysis Branch Seattle Municipal Tower, Suite 4900 P.O. Box 34018 Seattle, WA 98124-4018 (206) 256-5139 ...
0.00216601044 |
a/145952
sepachecklist-routinedrainagemaintenance-040319
Planning and Analysis Branch Seattle Municipal Tower, Suite 4900 P.O. Box 34018 Seattle, WA 98124-4018 (206) 256-5139 ...
0.00216601044 |
a/113144
sepa-checklist_routinedrainagemaintenance-040319
Planning and Analysis Branch Seattle Municipal Tower, Suite 4900 P.O. Box 34018 Seattle, WA 98124-4018 (206) 256-5139 ...
0.00216601044 |
a/113124
sepachecklistmeadowbrookpondrehabilitation010918
Meadowbrook Pond Rehabilitation 010918.docx January 9, 2018 Page 2 of 28 7. Do you have any plans for future additions, ...
0.00216601044 |
a/115447
sepachecklistdelridge99gateretrofit
plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. ...
0.00216601044 |
a/115444
pspbminutes_7-17-24
architectural details. They discussed that the artwork should align with the other architectural features ...
0.00216601044 |
a/163987