You just searched for:
Search
Filter Results
3076 to 3100 of 5610
maplewoodplayfielddns-signed
https://www.seattle.gov/documents/departments/parksandrecreation/projects/m ...
(June 15, 2023). Written comments must be submitted by ____June 29, 2023______. Responsible official: Mike Schwindeller Position/title: ...
0.002177306 |
a/143667
adoptedufcmeetingnotes050620
https://www.seattle.gov/documents/departments/urbanforestrycommission/2020/ ...
to date - Completed project charter and rough project plan - Compiled list of sites to interview for leading practices - ...
0.002177306 |
a/119035
adoptedufcmeetingnotes031120
https://www.seattle.gov/documents/departments/urbanforestrycommission/2020/ ...
30-year Forest Plan Steve walked the group through the draft. Commissioners discussed, edited and adopted the document. ...
0.002177306 |
a/119032
december2024ctabminutes
https://www.seattle.gov/documents/departments/cttab/minutes/december2024cta ...
Maritza Rivera will be leading the committee on that. She chairs the Department of Neighborhoods, and DEAL, the Department of Early ...
0.002177306 |
a/164245
psb041625prefontaintreepp
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
this is reflected on the plan and the replacement tree locations are provided with the plan. Emily ...
0.002177306 |
a/167760
volunteerparkdriveplaza_coa_presentation
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
. Seattle Department of Parks and Recre-ation investigated repair alternatives and conduct-ed an initial briefi ng with the ...
0.002177306 |
a/75509
wa_park_presentation
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
Modifications Site Plans ....................................................... 4 Project Concept ...
0.002177306 |
a/74264
commercialandselfhaulwastestreamscompositionstudy2012
https://www.seattle.gov/documents/departments/spu/aboutus/reports/solid-was ...
. Please see Appendix B for a detailed description of the methodology. Step 1: Develop Sampling Plan A total 270 ...
0.002177306 |
a/112789
culturalresourceselement
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/seatt ...
they are located. ASeattle’s Comprehensive Plan | Toward a Sustainable Seattle January | 200510.5 cultural resource ...
0.00217724964 |
a/87552
seattledesigncommission-2013.10.03northtransferstationminutes
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
seattledesigncommission-2013.10.03northtransferstationminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura ...
0.00217724964 |
a/85749
sixth-church-christ-designation
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
: D. It embodies the distinctive visible characteristics of an architectural style, period, or of a method of ...
0.00217724964 |
a/76545
desrptsixthchurchofchristformer
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
: D. It embodies the distinctive visible characteristics of an architectural style, period, or of a method of ...
0.00217724964 |
a/76261
fn2-12-20 maple wood meeting notes
https://www.seattle.gov/documents/departments/parksandrecreation/projects/m ...
Architecture: Phoebe Bogert, Katherine Goodrich, Tori Halligan Project Maple Wood Playfield and Play Area Renovation: ...
0.00217724964 |
a/93390
lpbminutes3-20-19
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
the historic doors below. She said they looked at a switchback stair plan, but it would block the doors, and a donut stair ...
0.00217724964 |
a/75020
march222012approvedminutes
https://www.seattle.gov/documents/departments/seattleplanningcommission/min ...
Vote Chair Miller called for any disclosures and recusals. Disclosures: - Commissioner Matt Roewe disclosed that his firm, VIA ...
0.00217724964 |
a/108912
pspb081022glsectionhistoryintro
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
, quoted in Link, 2005. MAKERS architecture and urban design Page 5 P Sq History - 5/14/21 Planning ...
0.00217724964 |
a/132190
2016 seattle it annual report (read only)
https://www.seattle.gov/documents/departments/tech/annual reports/2016 ...
will allow for more efficient usage and will create capacity to invest in other services not currently available, such as ...
0.00217724964 |
a/107666
pres_brief_17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
pres_brief_17 PRESERVATION BRIEFS 17 Close-up of stone wall, showing craftsmanship. Photo: NPS files. Architectural ...
0.00217724964 |
a/74190
nps_17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
nps_17 PRESERVATION BRIEFS 17 Close-up of stone wall, showing craftsmanship. Photo: NPS files. Architectural ...
0.00217724964 |
a/73362
2019_4_22-structureforstability
https://www.seattle.gov/documents/departments/arts/downloads/space/2019_4_2 ...
Real Property AgentOFFICE OF PLANNING & COMMUNITY DEVELOPMENTSamuel Assefa, DirectorUbax Gardheere, Equity Strategies ...
0.00217724964 |
a/49632
draft structure for stability apr 22 draft
https://www.seattle.gov/documents/departments/arts/downloads/reports/draft ...
, Senior Real Property AgentOFFICE OF PLANNING & COMMUNITY DEVELOPMENTSamuel Assefa, DirectorUbax Gardheere, Equity ...
0.00217724964 |
a/49559
materialselevations
https://www.seattle.gov/documents/departments/sdci/about/materialselevation ...
+ DESIGN3210 BEACON AVE. S. SUiTE 130 SEATTLE, WA 98144 TEL 206.257.3345RAINIERDEARBORNLANE09040806appenDix a - floor ...
0.00217724964 |
a/96340
lpb011724nortonbp
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
BUILDINGEXISTING GRANITE WALL, RE-CLAD TO MATCH NEW GRANITE WALLS, SEE ARCHITECTUREEXISTING ART TO BE RELOCATEDLIMIT OF WORK2SCREEN WALL, ...
0.00217724964 |
a/151600
seattledesigncommission-2017.11.16northgatepedbridgepresentation
https://www.seattle.gov/documents/departments/opcd/designcommission/northga ...
Sustainability StrategyDesign RefinementLandscape Architecture Project Art SummaryOVERVIEWOverviewRevised Alignment ...
0.00217724964 |
a/85035
dr_seatran rule 20-2000
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/di ...
, and construction process.The guidelines address site planning issues, streetscape compatibility, linkages, user comfort, ...
0.00217714719 |
a/99192
Previous
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
Next