Filter Results

276 to 300 of 1915
seattle-ltgo-2018a-b-taxable-pos
in the applicable 2018B Bond (and the amount of taxable interest received) and is deductible for federal income tax purposes. The basis ...
0.00220172131 |
a/58538
greenfeeherreravolireport
.........................................................................Assumptions and Limitations ...
0.00220136228 |
a/112971
contracting-equity-2015-report
policies, boilerplate language and templates.•Creating and managing City consultant rosters.•Creating, managing and directing ...
0.00220129 |
a/58990
4-5_commentsn-z_marked_mha_feis_2017
storystructures with front and back yards, to L3 or L2 zoning. Furtheranalysis needs to be conducted, and allowable heights need tobe ...
0.00220127753 |
a/65048
cityofseattle_doingbusinesswiththecitywmbevoices
COMMUNITY AMONG BUSINESS OWNERS AND THE CITY OF SEATTLE5RECOMMENDATIONS & STRATEGIES23Consistent with the survey results, ...
0.00220127753 |
a/167546
seattle solid waste 2021 final os
results shown herein will be achieved, and actual results may differ materially from the forecasts shown. ...
0.00220123725 |
a/58494
tsl_final_080107
, respectively, would result in year of expenditure costs of $193.6 million through project completion in February 2012. ...
0.00220107357 |
a/101203
2013-2018_adopted_cip
of significant increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes ...
0.00220077788 |
a/61969
2013-2018_proposed_cip
): Estimate of significant increases or decreases in operations and maintenance costs as a result of a capital project. ...
0.00220077788 |
a/61983
2013-2018_adopted_cip_000
of significant increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes ...
0.00220077788 |
a/61970
2020annualwastewatercollectionsystemreport
.............................................................................................................. 54 4.9 Expanded Arterial ...
0.00220077788 |
a/114389
sea-drain-os-2016
, but rather are forecasts and “forward-looking statements.” No assurance can be given that the future results shown ...
0.002200607 |
a/58470
entire_2009-2014_proposed_cip
by approximately $534,000. In 2009 the West Seattle Reservoir Covering project costs were reduced in part because the construction ...
0.00220051943 |
a/61504
2009-2014_adopted_cip_book
the West Seattle Reservoir Covering project costs were reduced in part because the construction bid was lower than the ...
0.00219975226 |
a/61424
fasfromadministration
(products, supplies, equipment and services) on behalf of City departments. These work groups conduct the bid process, ...
0.002199534 |
a/61834
targetedhire
, and ordinances. Another option is to set criteria through responsible contractor standards that contractors must meet in order to ...
0.002199342 |
a/58924
food and beverage rfp 01142021
top ranked Proposers from the Bid Response Committee review. If interviews are conducted, rankings of Proposers shall be ...
0.002199337 |
a/91768
seattle-city-light-os-2012-abc
of fact or as guarantees of results. If and when included in this Official Statement, the words “plan,” “expect,” ...
0.00219916622 |
a/107379
seattle-city-light-os-2012-abc-plus-errata
by the City that such forecasts, projections, and estimates will occur. Such forecasts, projections, and estimates are not intended as ...
0.00219916622 |
a/107378
ltcpappendicesathroughh
..................................................................................................... 5-1 5.3 Calibration Locations ...
0.00219916622 |
a/112999
seattle-city-light-os-2012-abc
of fact or as guarantees of results. If and when included in this Official Statement, the words “plan,” “expect,” ...
0.00219916622 |
a/58504
seattle-city-light-os-2012-abc-plus-errata
by the City that such forecasts, projections, and estimates will occur. Such forecasts, projections, and estimates are not intended as ...
0.00219916622 |
a/58503
2010_adopted_cip
increases or decreases in operations and maintenance costs as a result of a capital project. “N/C” denotes that operations ...
0.002198977 |
a/61612
appdxc_hazardousmaterialsdisciplinereport
......................................................................................... 27 III.3. Summary Results of ...
0.002198977 |
a/100829
appendix b to g for att 1 - sir closed-circuit television camera ...
(CPTP). Despite the best efforts of all parties, we were unable to reach a consensus on the substance and process of the RETs. The ...
0.002198583 |
a/159548