Filter Results

2901 to 2925 of 5719
lpbcurrentnom_spu_southtransferstation
NO. 9709239004 DISCLOSES AN ADDITIONAL DONATION CLAIM BOUNDARY, PURSUANT TO KING COUNTY SUPERIOR COURT CAUSE NO. 14450. SAID CASE APPEARS TO ...
0.00220147474 |
a/74544
northgatepedbridgedec12binder
Utilities ............................................................................................................... ...
0.00220147474 |
a/99436
northgatepedbridgedec12binder
Utilities ............................................................................................................... ...
0.00220147474 |
a/100780
utilities
of combined sewers • 68 pump stations • 92 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ...
0.00220147474 |
a/61807
sectionsudistrictdrafteis2-0descriptionofalternatives
. The station, located on Brooklyn Avenue between NE 43rd and NE 45th Streets, is anticipated to open in late 2021 and to serve as an ...
0.00220147474 |
a/87797
oneseattleplanfeis-chapter3.11-publicservices
total population within the revised center boundaries of the Preferred Alternative. Future 2044 population by center was ...
0.00220147474 |
a/165721
key-arena-report-june-2015
, 2014-2019 ................................................................................................................ 160 Figure 45: ...
0.00220147474 |
a/53312
year4stbdannualreport_102519
Schools: ORCA Opportunity24 SHA Properties: ORCA Opportunity2 Youth Organizations: Youth Transportation Ambassadors Program3 Senior Centers: ...
0.00220147474 |
a/105945
year4stbdannualreport_102519
Fare Permit Pilot10 Community Organizations: Transportation Equity WorkgroupSeattle Department of Transportation All Aboard ...
0.00220147474 |
a/106412
ballardurbandesign-draftexistingconditionsreport
, curb revisions, landscaping and artistic features within the park. Additionally, the steering committee raised another ...
0.00220147474 |
a/86293
lpbcurrentnom_shearwater_community_decatur_annex
, Permit # BN 26747: “Alter. ex. building & occupy as classrooms per revision of permit ...
0.00220147474 |
a/74538
ballardexistingconditionsreport
with funding by Department of Neighborhood Matching Fund and community contributions, included sidewalk replacement, installation of rain ...
0.00220147474 |
a/108449
2016_publicinvolvementsummary
they are revised or removed in the proposed route).NE 73rd St and Roosevelt oWest side: Businesses, sidewalk, cyclist ...
0.00220147474 |
a/106261
stp-part1-primary-plan-doc-final-draft-august2023_hi-res
and pavement markings to help people find their way  Neighborhood activities like hopscotch and basketball (that would otherwise require a ...
0.00220147474 |
a/151467
lpbcurrentnom_northgate_lmn
of Seattle Permit # 436099, Construct a building per plan, 1955 ...................................... A-37 Figure 67 • ...
0.00220147474 |
a/74516
lpbnorthgate lmn revised 1-17-20
lpbnorthgate lmn revised 1-17-20 Northgate Elementary School11725 First Ave NE, Seattle, WA 98125641160-0312see belowH.E. ...
0.00220147474 |
a/74577
cao2023report
. • Seattle Department of Construction & Inspections (SDCI) – permitting services, code compliance, design review, ...
0.00220147474 |
a/156846
cityofseattle_ols_appbasedworkersguide_spanish
derechos y revise sus registrosSea cortés y objetivoEscriba la cronología de los hechosIndique los próximos pasos si la ...
0.00220147474 |
a/176483
3-8_pubservutilities_mha_feis_2017
to this analysis.The City of Seattle is currently experiencing a construction boom, with over 17,000 housing units in the ...
0.00220147474 |
a/65037
3-2_landuse_mha_feis_2017
changed since the DEIS?New information and other corrections and revisions since issuance of the DEIS are described in ...
0.00220147474 |
a/65031
systems testing smoke control itm 09-2024 final
Chapter 4 and IFC 901.6.2) (required for buildings permitted under 2018 code or later).Option 1: SUMMARY OF PERIODIC ...
0.00220147474 |
a/161180
2022-solid-waste-plan-update_appendix-e_recycling-potential-asses ...
Assessment Model Outputs E.31 Figures and Tables Table E.1 2022 Plan Update Recommendations E.4 Figure E.1 Flow of Materials and Life ...
0.00220147474 |
a/146071
spu
approximately 448 miles of separated sanitary sewers, 968 miles of combined sewers, 481 miles of storm drains, 67 pump stations, 82 ...
0.00220147474 |
a/177936
cip_spu_drainwaste
of wastewater force mains•82 City-owned and permitted Combined Sewer Overflow points•38 Combined Sewer Overflow control ...
0.00220147474 |
a/178168
afs2020annualreport
than 500 temporary street use permits to restaurants, food trucks, retail vendors, and others to establish outdoor cafes, ...
0.00220147474 |
a/49017