Filter Results

2876 to 2900 of 5618
treeregsconstitutentemailsthrough040720
passes without an updated Tree Protection Plan as recommended in the latest draft by the Seattle Urban Forestry Commission. ...
0.00217957515 |
a/119485
eisscopingdisplays
eisscopingdisplays City of SeattleDepartment of Planning & DevelopmentScoping Meeting124 Sept 2013Stephanie Bower, ...
0.00217957515 |
a/87767
20230419rpmtgmaterials
: Review and approval of meeting minutes of March 22, 2023 d. Communications to Panel (Leigh) 4. General Manager Update (40 min.) ...
0.00217957515 |
a/141159
2designforpermittingenvreviewfinalredacted
SEPA Responsible Official SUP Street Use Permit TCP Traffic Control Plan UMP Utility Major Permit WAC Washington ...
0.00217957515 |
a/154258
doitcap
. Computing Services Architecture This ongoing program funds major maintenance and regular replacement of computing and ...
0.002179416 |
a/62341
seattledesigncommission-2004.05.20fremontbridgeapproachesandmaint ...
Frances Nelson Iain M. Robertson Nic Rossouw Donald Royse Sharon E. Sutton Tory Laughlin Taylor Guillermo Romano, Executive Director Layne ...
0.002179416 |
a/85339
99parksrecreationa
year strategic business plan to systematically build the donation and sponsorship programs for ongoing recreational ...
0.002179416 |
a/62071
doitcap
2015-2020 Proposed Capital Improvement Program Computing Services Architecture This ongoing program funds major ...
0.002179416 |
a/62374
proposed-2019_2020-omnibus
area shall be legibly shown and described on the site plan, and a covenant shall 20 be required as set out in Section ...
0.002179416 |
a/53455
3-3_aesthetics_mha_feis_2017
these areas, various building heights, scales, and architectural styles characterize these areas. Townhouse development ...
0.002179416 |
a/65032
desrptcarmack
” details and massings (gambrel rooflines) was important in the development of Seattle’s own residential architectural ...
0.00217936677 |
a/75934
lpbminutes9-20-17
OF APPROVAL 092017.31 Harvard-Belmont Landmark District 1137 Harvard Ave E Proposed landscape alterations Garrett Devere ...
0.00217936677 |
a/75055
mm sdc meeting 2022-12-1 130th station final
of Planning and Community Development 600 4th Avenue, Floor 5 PO Box 94788 Seattle, WA 98124-4019 TEL 206-615-1349 FAX ...
0.00217936677 |
a/140882
lpbminutes_1-5-22
has a life cycle which is why regeneration plan based on thorough understanding of the original design and plantings is ...
0.00217936677 |
a/133696
pspbminutes6-27-18
transparency and hide architectural features of the building and did not improve the visual relationship between the ...
0.00217936677 |
a/74080
ffd
five major operating functions, including the Real Estate Services division; Architecture, Engineering, and Space ...
0.00217936677 |
a/60596
2022.05.13_seattledesigncommision_soundtransitletter
CraryPuja ShawMolly SpetalnickElaine WineMichael JenkinsExecutive DirectorValerie Kinast Strategic AdvisorJuliet Acevedo Administrative ...
0.00217936677 |
a/129574
sdc_letter_2022_0513_sound transit
provided the Commission and the public a comprehensive evaluation of complex architectural and engineering studies, ...
0.00217936677 |
a/135689
wsble letter to sound transit - early design advice
CraryPuja ShawMolly SpetalnickElaine WineMichael JenkinsExecutive DirectorValerie Kinast Strategic AdvisorJuliet Acevedo Administrative ...
0.00217936677 |
a/140691
itd
. The Proposed Budget allocates Federal Coronavirus Local Fiscal Recovery (CLFR) Fund to Seattle IT as part of Seattle Rescue ...
0.00217936677 |
a/63604
bullitt house facility loi with attachments ada
............................................................... 9 7. Appendix C- OAI, Architecture and ...
0.00217936677 |
a/173748
2020_11_28-report_base-screen
, including the Northwest African American Museum. He is a founding board member of AIA Seattle’s strategic initiative, Design in Public, ...
0.00217936677 |
a/49633
165_coa_dwgs
ADJACENT TO HATCHPLANT SHRUBS AND GROUNDCOVERS A MINIMUM OF 18'' FROM PAVED SURFACESSHRUB WITH A MATURE HEIGHT OF 24" OR GREATER, (FOR GREEN ...
0.00217936677 |
a/74106
pspb100522westlandpp
DeveloperFocused on Place-Making, Diversity ofActivation and UsesCommitted to Climate LeadershipLong-Term View in Project ...
0.00217936677 |
a/134388
idminutes1-22-19
included photographs, plans and specifications. The Board received a briefing on the proposal on June 12, 2018. Applicant ...
0.00217919541 |
a/73093