Filter Results

2751 to 2775 of 10108
lpbcurrentnom_cassell
effect. Painted and unpainted cast stone is used as architectural ornament on the building, particularly on ...
0.00183753588 |
a/74442
admiral-plan
aspect of recent developments is due to land use code variances andconditional use permits.Policy ...
0.001837467 |
a/78387
oneseattleplanfeis-chapter3.11-publicservices
-premise signs and other signs. LU240 Shoreline street ends are a valuable resource for public use, access ...
0.0018374623 |
a/165721
071323 - se committee meeting minutes
free speech event - the Permit would be greater than the cost of the actual labor to review the permit. ...
0.00183745939 |
a/150868
question 102a - actions taken pursuant to s4f
street sweeping program to maintain compliance with Appendix 13. City of Seattle NPDES Phase I Municipal Stormwater ...
0.00183738174 |
a/155468
neighborhoods_and_development
; - Housing and Building Maintenance Code; and - Seattle Noise Ordinance. DPD reviews land use and ...
0.00183736626 |
a/61010
seattle ltgo impovement and refunding bonds 2024_os
are payable by the fiscal agent of the State of Washington (the “Bond Registrar”) (currently U.S. Bank Trust Company, ...
0.00183734426 |
a/157195
seattletimes-building-complex-1947-office-building
on the third floor. Nearly 100 permits have been issued for the entire Seattle Time complex. No permit for ...
0.0018373417 |
a/74590
2017annualreportfinancials
categories including for underground system network maintenance, contracting and support services, fewer wireless antenna upgrades, lower ...
0.00183732668 |
a/50692
oneseattleplanfeis-chapter02-proposalandalternatives
of housing. ▪ Creating a new Midrise zone. ▪ Adding or modifying design standards. ▪ Allowing more flexibility for commercial ...
0.00183731667 |
a/165712
3324-preliminaryreport11102017
Union. The 2015 report included a recommendation to sell the 800 Mercer St property after the street vacation is complete. ...
0.001837302 |
a/59253
roadmap_section4
will determine the specific requirements and steps you need to take to obtain the permit. Kent Hunnicutt is also the ...
0.00183729606 |
a/49526
1_2020-10-19 - wshb - rp-cba_final (1)[2]
, it is estimated that an average trip using the WSHB would have taken 6.25 minutes, while an average trip ...
0.00183720118 |
a/101260
seattledesigncommission-2008.10.161200stewartminutes
to maintain sites public use is being considered; and how to sustain that program. There are industrial sites which will ...
0.00183717231 |
a/85455
2024floodplainregulationssepadirectorsreportappendixc
not imply that land outside the areas of special flood hazards or uses permitted within such areas will be ...
0.0018370715 |
a/158926
permanentfloodplainregsdirectorreportappendixc
mains; electric, telephone, and sewer lines; and streets and bridges located in flood hazard areas; 6) Help maintain a ...
0.0018370715 |
a/148488
2012srcchapter4
the provisions of Section R322. Wood foundations shallbe designed and installed in accordance with AF&PA PWF.Exception: The provisions of ...
0.00183706032 |
a/97807
cam2503
Street Use fee schedule for current rate• Base permit fee of $588 due at intake, plus an ...
0.0018370545 |
a/104204
cnseattle_technical_appendix_may_2011
Streets enable pricing, transit, land use, and demand management programs to realize their full potential ...
0.0018370531 |
a/57389
cnseattle_technical_appendix_may_2011
Streets enable pricing, transit, land use, and demand management programs to realize their full potential ...
0.0018370531 |
a/88271
2020_2024_pmp_implemplan_v8_main_report_opt
Streets. Established in 2007, the Complete Streets ordinance guides how we develop projects to provide for ...
0.0018370524 |
a/103806
appdxa_biologicalassessment_geologysoilstechmemo
, a cycle track, a sidewalk and a mixed use trail/walkway. The project will either replace or relocate the existing (west ...
0.00183699909 |
a/100827
cam2504
for scheduled community building and pedestrian-oriented street activity. The Festival Street ...
0.00183697988 |
a/104205
sandpointnavalairstationlandmarkdistrictadopted7-3-13_withappendi ...
normal practice for similar streets elsewhere in the city.It is possible, for cost reasons, to specify only standard posts ...
0.00183697115 |
a/75801
sandpoint-guidelines
and the sign mustalways carry the reference to the building number, street address,or park functional name. ...
0.00183697115 |
a/74278