You just searched for:
Search
Filter Results
2726 to 2750 of 5663
cdbg
http://www.seattle.gov/documents/departments/financedepartment/04adoptedbud ...
in building a safe, healthy, educated, just, and caring community.Policies and priorities for distributing CDBG funds to community-based ...
0.002228257 |
a/60580
pier_58_replacement_sepa_checklist
http://www.seattle.gov/documents/departments/waterfront/pier_58_replacement ...
or schedule (including phasing, if applicable): Construction is expected to start in Fall of 2021 and last up to 3 years. 7. Do you have ...
0.002228257 |
a/171950
washington-hall-designation
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
, prolific use of historicizing elements, and ingenuity in planning. Voorhees was inspired by many different ...
0.002228257 |
a/76586
desrptwashingtonhall
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
, prolific use of historicizing elements, and ingenuity in planning. Voorhees was inspired by many different ...
0.002228257 |
a/76307
idminutes12-11-18
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
plans. The Bush Hotel was constructed in 1915. It is a contributing building located within the Asian Design Character ...
0.002228257 |
a/73112
pspbminutes4-17-19
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Trevina Wang proposed seven flower baskets on both the east and west sides of the building; she indicated locations on site ...
0.002228257 |
a/74069
psb9-21-16_minutes
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
of the structure ARC Report: Mr. Kralios reported that ARC reviewed the plans, photos and samples provided and that ARC ...
0.002228257 |
a/73791
doit
http://www.seattle.gov/documents/departments/financedepartment/14proposedbu ...
information security policy and management, development of common standards and architectures, development of a multi-year ...
0.002228257 |
a/62286
june282012approvedminutes
http://www.seattle.gov/documents/departments/seattleplanningcommission/minu ...
and multi-family housing throughout Seattle and might in this neighborhood. - Commissioner Matt Roewe disclosed that his firm, Via ...
0.002228257 |
a/108867
certificate-of-approval_instructions
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
: Depending on the board or commission, proposals may require an initial review by the Architectural/Design Review ...
0.002228257 |
a/72623
march82012approvedminutes
http://www.seattle.gov/documents/departments/seattleplanningcommission/minu ...
march82012approvedminutes City of Seattle Seattle Planning Commission Leslie Miller, Chair Barbara Wilson, Executive ...
0.002228257 |
a/108936
stadiumstudyconceptuallevelenvironmentalanalysis
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/stadiu ...
Stadium District area encompasses approximately 95 acres, including 36 acres of land that would be removed from the Downtown Urban Center ...
0.002228257 |
a/87725
itd_cip
http://www.seattle.gov/documents/departments/financedepartment/2631poposedc ...
Improvement Program (CIP) supports major maintenance, improvements, replacements, and decommissioning of and to the City’s technology ...
0.002228257 |
a/173305
spokane street swing bridge access project sepa checklist
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/west ...
then by an automated photo enforcement system. 7. Do you have any plans for future additions, expansion, or further ...
0.002228257 |
a/101515
sitcap
http://www.seattle.gov/documents/departments/financedepartment/1924proposed ...
2019 Proposed 2020 Proposed Planned Spending Discrete Projects Citywide Contract Management System $2,757,000 $79,000 ...
0.002228257 |
a/63083
itdcip
http://www.seattle.gov/documents/departments/financedepartment/19adoptedbud ...
Adopted 2020 Endorsed Planned Spending Discrete Projects Citywide Contract Management System $2,757,000 $79,000 Replace ...
0.002228257 |
a/63128
2016commercialwastestreamcompositionstudy
http://www.seattle.gov/documents/departments/spu/aboutus/reports/solid-wast ...
............................................................................... B-7 Table C-1. Summary of Planned vs. ...
0.002228257 |
a/112693
4-3_aesthetics_adu_deis_2018
http://www.seattle.gov/documents/departments/council/4-3_aesthetics_adu_dei ...
Element, and Shoreline Element of the Seattle Comprehensive Plan; the procedures and locational criteria for shoreline 4.3 ...
0.002228257 |
a/53172
fortlawton-guidelines
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
looking west toward the Olympic Mountains. The houses were constructed from standard Quartermaster General plans and are ...
0.002228257 |
a/72895
outreach_boards_final
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/capito ...
outreach_boards_final 1/11CAPITOL HILL NEIGHBORHOOD DESIGN GUIDELINES UPDATE NOVEMBER 2017Office of Planning &Community ...
0.002228257 |
a/86479
lpbcurrentnom_anderson house
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
– January 25, 2019 2 4211 Brooklyn Avenue NE Seattle Landmark Nomination INDEX I. Introduction 3 II. Building information ...
0.002228257 |
a/74415
psb121025prefontainefountainps
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
OF SUCH DISCREPANCY SHALL BE DONE ATTHE GENERAL CONTRACTOR'S RISK.3.PRIMARY STRUCTURAL ELEMENTS NOT DIMENSIONED ON THE STRUCTURAL ...
0.002228257 |
a/175636
psb121725prefontainefountainps
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
OF SUCH DISCREPANCY SHALL BE DONE ATTHE GENERAL CONTRACTOR'S RISK.3.PRIMARY STRUCTURAL ELEMENTS NOT DIMENSIONED ON THE STRUCTURAL ...
0.002228257 |
a/175844
concept_design_full
http://www.seattle.gov/documents/departments/waterfront/concept_design_full ...
Committee,The Seattle Department of Transportation,Department of Planning and Development,and Department of Parks and ...
0.002228257 |
a/171981
9astandardspecificationsforelectricaldesign
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
not offered for this project. B. Other Informational Submittals: Plans showing dimensioned as-built locations of ...
0.002228257 |
a/154294
Previous
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
Next