Filter Results

2726 to 2750 of 5663
cdbg
in building a safe, healthy, educated, just, and caring community.Policies and priorities for distributing CDBG funds to community-based ...
0.002228257 |
a/60580
pier_58_replacement_sepa_checklist
or schedule (including phasing, if applicable): Construction is expected to start in Fall of 2021 and last up to 3 years. 7. Do you have ...
0.002228257 |
a/171950
washington-hall-designation
, prolific use of historicizing elements, and ingenuity in planning. Voorhees was inspired by many different ...
0.002228257 |
a/76586
desrptwashingtonhall
, prolific use of historicizing elements, and ingenuity in planning. Voorhees was inspired by many different ...
0.002228257 |
a/76307
idminutes12-11-18
plans. The Bush Hotel was constructed in 1915. It is a contributing building located within the Asian Design Character ...
0.002228257 |
a/73112
pspbminutes4-17-19
Trevina Wang proposed seven flower baskets on both the east and west sides of the building; she indicated locations on site ...
0.002228257 |
a/74069
psb9-21-16_minutes
of the structure ARC Report: Mr. Kralios reported that ARC reviewed the plans, photos and samples provided and that ARC ...
0.002228257 |
a/73791
doit
information security policy and management, development of common standards and architectures, development of a multi-year ...
0.002228257 |
a/62286
june282012approvedminutes
and multi-family housing throughout Seattle and might in this neighborhood. - Commissioner Matt Roewe disclosed that his firm, Via ...
0.002228257 |
a/108867
certificate-of-approval_instructions
: Depending on the board or commission, proposals may require an initial review by the Architectural/Design Review ...
0.002228257 |
a/72623
march82012approvedminutes
march82012approvedminutes City of Seattle Seattle Planning Commission Leslie Miller, Chair Barbara Wilson, Executive ...
0.002228257 |
a/108936
stadiumstudyconceptuallevelenvironmentalanalysis
Stadium District area encompasses approximately 95 acres, including 36 acres of land that would be removed from the Downtown Urban Center ...
0.002228257 |
a/87725
itd_cip
Improvement Program (CIP) supports major maintenance, improvements, replacements, and decommissioning of and to the City’s technology ...
0.002228257 |
a/173305
spokane street swing bridge access project sepa checklist
then by an automated photo enforcement system. 7. Do you have any plans for future additions, expansion, or further ...
0.002228257 |
a/101515
sitcap
2019 Proposed 2020 Proposed Planned Spending Discrete Projects Citywide Contract Management System $2,757,000 $79,000 ...
0.002228257 |
a/63083
itdcip
Adopted 2020 Endorsed Planned Spending Discrete Projects Citywide Contract Management System $2,757,000 $79,000 Replace ...
0.002228257 |
a/63128
2016commercialwastestreamcompositionstudy
............................................................................... B-7 Table C-1. Summary of Planned vs. ...
0.002228257 |
a/112693
4-3_aesthetics_adu_deis_2018
Element, and Shoreline Element of the Seattle Comprehensive Plan; the procedures and locational criteria for shoreline 4.3 ...
0.002228257 |
a/53172
fortlawton-guidelines
looking west toward the Olympic Mountains. The houses were constructed from standard Quartermaster General plans and are ...
0.002228257 |
a/72895
outreach_boards_final
outreach_boards_final 1/11CAPITOL HILL NEIGHBORHOOD DESIGN GUIDELINES UPDATE NOVEMBER 2017Office of Planning &Community ...
0.002228257 |
a/86479
lpbcurrentnom_anderson house
– January 25, 2019 2 4211 Brooklyn Avenue NE Seattle Landmark Nomination INDEX I. Introduction 3 II. Building information ...
0.002228257 |
a/74415
psb121025prefontainefountainps
OF SUCH DISCREPANCY SHALL BE DONE ATTHE GENERAL CONTRACTOR'S RISK.3.PRIMARY STRUCTURAL ELEMENTS NOT DIMENSIONED ON THE STRUCTURAL ...
0.002228257 |
a/175636
psb121725prefontainefountainps
OF SUCH DISCREPANCY SHALL BE DONE ATTHE GENERAL CONTRACTOR'S RISK.3.PRIMARY STRUCTURAL ELEMENTS NOT DIMENSIONED ON THE STRUCTURAL ...
0.002228257 |
a/175844
concept_design_full
Committee,The Seattle Department of Transportation,Department of Planning and Development,and Department of Parks and ...
0.002228257 |
a/171981
9astandardspecificationsforelectricaldesign
not offered for this project. B. Other Informational Submittals: Plans showing dimensioned as-built locations of ...
0.002228257 |
a/154294