Filter Results

2601 to 2625 of 2664
2017_jan31-23rd-union-workshop(0)
permitting barriers•Maximize efficient construction methods•Provide incentives for family-sized housing•Net new rent-and ...
0.00208976958 |
a/54173
2017_jan31-23rd-union-workshop
permitting barriers•Maximize efficient construction methods•Provide incentives for family-sized housing•Net new rent-and ...
0.00208976958 |
a/54174
psb031324117smainpp
in Pioneer Square (see: ...
0.00208976958 |
a/153690
lpb110624woodinhousepp
. 82. 19“Since 1957… 41 rezones from residential to industrial or commercial have been granted by the city. In addition, the city has ...
0.00208976958 |
a/162038
sdot2008annualreportfinal
Techniques.”University Link Light RailSound Transit awarded preliminary contracts for the University of Washington utility relocation, ...
0.00208976958 |
a/99442
2017_0306-morgan-junction-workshop
to expand housing options to meet growing demand•Continue growth in urban centers•Reduce permitting barriers•Maximize ...
0.00208976958 |
a/54166
2017_0306-morgan-junction-workshop
to expand housing options to meet growing demand•Continue growth in urban centers•Reduce permitting barriers•Maximize ...
0.00208976958 |
a/54104
transportationequity_framework_report_41422
or location even though they do not wish to do so:• Physical displacement is the result of things such as eviction, acquisition, ...
0.00208976958 |
a/129113
capstonereport2019
types of displacement: 2.Physical displacement (direct displacement): Results from eviction, landacquisition, and rehabilitation or ...
0.00208976958 |
a/87021
2017_jan17-wallingford-workshop
options to meet growing demand•Continue growth in urban centers•Reduce permitting barriers•Maximize efficient construction ...
0.00208976958 |
a/54171
2017_0313-eastlake-workshop
growing demand•Continue growth in urban centers•Reduce permitting barriers•Maximize efficient construction methods•Provide ...
0.00208976958 |
a/54167
2017_0329-rainier-beach-workshop
•Continue growth in urban centers•Reduce permitting barriers•Maximize efficient construction methods•Provide incentives for ...
0.00208976958 |
a/54168
udistrictplanningrezoneprocess
, potentially reducing demolitions.By increasing the total number of housing choices to help meet U District demand, the ...
0.00208976958 |
a/87840
northgatees_departurespresentation_200619crd
the demolition of theexisting building.>Occupied ConstructionThe school site will continue to be occupied duringthe ...
0.00208976958 |
a/76848
tef--part-1---values---strategies-document-final
residence or location even though they do not wish to do so:• Physical displacement is the result of things such as eviction, acquisition, ...
0.00208976958 |
a/126589
tef part 1 values strategies draft jan2021
even though they do not wish to do so:• Physical displacement is the result of things such as eviction, acquisition, rehabilitation, or ...
0.00208976958 |
a/103833
transportationequity_framework_report_3.9.22
residence or location even though they do not wish to do so:• Physical displacement is the result of things such as eviction, acquisition, ...
0.00208976958 |
a/126590
rdhctexistingconditionsreport11-30-15
Link Extension will connect the Northgate, Roosevelt, and University District neighborhoods to downtown Seattle. Construction has been ...
0.00208976958 |
a/106337
sclartplan
permitting umbrella as the capital project and completed at the same time as the capital project. If the work is temporary ...
0.00208976958 |
a/155158
reconnectsouthparkalternativesreviewpotentialfatalflaws
mainlines are not permitted because maintaining access to critical points is necessary in any future condition. “Reroute ...
0.00208976958 |
a/171524
mpcf_sept2017_daybreakstarculturalcenterreport
with equipment1EA85,000.0085,000Signage2EA100.00200Demolition load out & disposal103CY53.205,503Truck & dispose of concrete demoliti ...
0.00208976958 |
a/90858
one center city_022317_dw
construction begins•D2 Roadway closes•Madison BRT construction begins•Madison BRT open•SR 99 Tunnel open*•Alaskan Way Viaduct ...
0.00208976958 |
a/109104
strategic parking study - seattle center 1-2017
overpass at the south end of downtown that allows traffic to bypass train blockages near Seattle’s busiest port terminal.• ...
0.00208976958 |
a/56217
2022_1107 - t6 public trust_final draft (1)
BuildingNote: Demo MUPS and demo permits were approved in Spring 2022; site demolition has been completed ...
0.00208976958 |
a/136765
uptownseattlecenterstrategicparkingstudy
overpass at the south end of downtown that allows traffic to bypass train blockages near Seattle’s busiest port terminal.• ...
0.00208976958 |
a/87904