Filter Results

226 to 250 of 2572
505_briefing
no.datedaterevisions:byno.Reserved for permit stamp03/30/2021ZONING CODESUMMARYA0.03505 1ST REPOSITION505 1ST AVE SSEATTLE, ...
0.00225492916 |
a/74111
2012cityofseattleproposedbudget
of its revenues and expenditures according to a system of funds and subfunds. In general, funds or subfunds are established to account for ...
0.00225467747 |
a/61957
2021swmanualvol2constructionstormwatercontrolclean
/Regulations-Permits/Guidance-technical-assistance/Dangerous-waste-guidance/Common-dangerous-waste/Construction-and-
0.00225451333 |
a/96985
entire_2009-2010_proposed_budget
and subfunds. In general, funds or subfunds are established to account for specific revenues and permitted expenditures ...
0.00225431821 |
a/61415
revised september 2025 with initial responses to public comments
Stormwater Code ● Added and updated definitions and requirements for clarity and to be consistent with the 2024 Phase I Municipal Separate ...
0.002254296 |
a/173192
fortlawton_feis
Year 2 (2019) Permit intake, design development Year 3 (2020) MUP/building permit approval, begin ...
0.002254121 |
a/151004
opcd-seattle20235comprehensiveplanamendments2023
scale than in hub urban villagesGrowth AccommodationZoning that permits• a minimum of 15,000 jobs within 0.5 miles of a ...
0.002254005 |
a/168993
awpow_final_eis_oct_2016
of A WPOW under SEPA to assist decision-makers and permit authorities in assessing the environmental effects associated ...
0.00225384883 |
a/171955
ssp-magbuild31rehabstudyfeasibilityreport
Rehabilitation Study Report Page 47 of 155 February 7, 2020 Image 19 An enlargement of JARPA permit drawings ...
0.0022538167 |
a/93386
2022-solid-waste-plan-update_chapter-8_construction-demolition-de ...
Department of Construction and Inspection (SDCI) has grown for nine out of the past 11 years, and SDCI anticipates that ...
0.00225352612 |
a/146065
seattlecomprehensiveplan
goals.Through the urban village strategy, the Plan intends to achieve goals that are shaped by the core values. ...
0.00225341227 |
a/87651
seattlecomprehensiveplan
goals.Through the urban village strategy, the Plan intends to achieve goals that are shaped by the core values. ...
0.00225341227 |
a/87795
seattlecomprehensiveplan
goals.Through the urban village strategy, the Plan intends to achieve goals that are shaped by the core values. ...
0.00225341227 |
a/87296
counciladopted2022fullplan
with household incomes below established thresholds before issuing permits for housing demolition, change ...
0.00225302414 |
a/142406
counciladopted2020
established thresholds before issuing permits for housing demolition, change of use, or substantial ...
0.00225302414 |
a/87545
comprehensiveplancounciladopted2021
and payment of relocation assistance to tenants with household incomes below established thresholds before issuing permits ...
0.00225302414 |
a/87518
counciladopted2019
with household incomes below established thresholds before issuing permits for housing demolition, change ...
0.00225302414 |
a/87539
seattlecomprehensiveplancounciladopted2016
in the demolition of existing housing. LU 7.10 Reflect the character of existing low-density development through the ...
0.00225302414 |
a/87652
seattlecomprehensiveplancounciladopted2017
of relocation assistance to tenants with household incomes below established thresholds before issuing permits for housing ...
0.00225302414 |
a/87653
seattlecomprehensiveplancounciladopted2018
with household incomes below established thresholds before issuing permits for housing demolition, change ...
0.00225302414 |
a/87654
march draft summary of changes to stormwater manual
and State waste disposal regulations applicable to PCBs. Inform the City Permitting group of the presence of PCB-containing ...
0.00225302414 |
a/178685
2024floodplainregulationssepadns
the review of permit applications and determining compliance of the regulations through issuing or denying ...
0.002252955 |
a/158929
march draft stormwater vol 4 source control
, including the following: ● Federal Clean Water Act ● Federal Coastal Zone Management Act ● Phase I National Pollutant Discharge ...
0.002252906 |
a/178485
2016-2021proposedcapitalimprovementprogram9-23-15
Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is required, for ...
0.00225219084 |
a/62334
201621adoptedcip
. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one ...
0.00225219084 |
a/62537