Filter Results

2026 to 2050 of 2595
spr
event facilities, Amy Yee Tennis Center (AYTC), athletic fields, and for revocable use permits. Through ...
0.0015883774 |
a/160719
streetvacationfaq
, request additional time. The City Council will determine whether an extension of time is appropriate. May I apply for a ...
0.00158829894 |
a/104873
seattleindustrialfeisch3.3
by the US Army Corps of Engineers (USACE), provides for permitting of any work in, over, or under ...
0.00158829743 |
a/134525
spu
toilets) and the Automatic Public Toilets program. Provide funds for payment to the Department of Design, Construction and Land ...
0.00158821186 |
a/60515
appendix_b_route_40_transportation_tech_report
travel time, not dissimilar to right-turning vehicles using a bus lane (as discussed Section 3.6). The Route 40 operates ...
0.00158819428 |
a/142744
itsstrategicplan20102020
Stations for collecting traffi c data which • may be used to provide a real-time traffi c conditions fl ow ...
0.00158817391 |
a/105858
itsstrategicplan20102020
Stations for collecting traffi c data which • may be used to provide a real-time traffi c conditions fl ow ...
0.00158817391 |
a/117134
route_8_corridor_study_final_report_20250207
is conducting a master planning study2 of I-5 throughout Washington State. This study is expected to include an analysis of ...
0.00158817321 |
a/173443
transportation
Street and 103rd Street. Northgate South Lot developer, Lorig Associates, is expected to fund approximately one third of the cost to ...
0.00158816017 |
a/60924
q4_2022_sbp_report
unsheltered populations including trash, sharps, (i.e., used needle collection) and recreational vehicle servicesAnnual ...
0.00158812 |
a/139635
2015-oisgrantapp-gograntsfinal
of the geographic boundaries of your neighborhood business district and the area in which your work will focus.(Maximum characters allowed ...
0.00158810837 |
a/56461
2015-oisgrantapp-gograntsfinal
your work will focus. (Maximum characters allowed 1,000) MAP OF DISTRICT If you have a map of your ...
0.00158810837 |
a/56462
sdot_projects
to install the traffic signal as a condition of its Master Use Permit. The project ...
0.00158806017 |
a/61205
transportation_projects
of the cost to install the traffic signal as a condition of its Master Use Permit. The ...
0.00158806017 |
a/61165
seattledesigncommission-2004.12.16firestation10minutes
); 15 January 2004, 6 June 2000 (Pre-Design: Ballard Civic Center Master Plan); 7 October 1999 (Briefing) Presenters: ...
0.00158806017 |
a/85351
seattledesigncommission-2004.12.16ballardmunicipalparkminutes
Design); 15 January 2004, 6 June 2000 (Pre-Design: Ballard Civic Center Master Plan); 7 October 1999 (Briefing) ...
0.00158806017 |
a/85350
sdot_grant_application_s_holgate_st study
If yes, please specify which one Planning Projects U.S. DOT Crossing Number(s) 927461X (S Holgate) 085583Y (S Holgate) ...
0.00158806017 |
a/154488
sclcip
efficient use of CityLight’s products and services.270Seattle City Light 2024-2029 Proposed Capital Improvement Program ...
0.0015880561 |
a/147696
scl_2429adoptedcip
to help customers manage their energy bills through efficient use of City Light’s products and services. 271Seattle City ...
0.0015880561 |
a/153302
highlights opcd comprehensive plan urban village indicators ...
of Transportation’s (SDOT) Transit Master Plan (TMP) uses an envisioned Frequent Transit Network to guide ...
0.00158805423 |
a/87590
spu
miles of combined sewers, 481 miles of storm drains, 67 pump stations, 82 permitted combined sewer overflow points, 591 ...
0.00158798578 |
a/134201
seattlesaferoutestoschoolengineeringtoolkit
is repaved or reconstructed 2. We use the Pedestrian Master Plan to select and prioritize new curb ramp ...
0.00158798578 |
a/105160
seattlesaferoutestoschoolengineeringtoolkit
is repaved or reconstructed 2. We use the Pedestrian Master Plan to select and prioritize new curb ramp ...
0.00158798578 |
a/103301
seattlesaferoutestoschoolengineeringtoolkit
is repaved or reconstructed 2. We use the Pedestrian Master Plan to select and prioritize new curb ramp ...
0.00158798578 |
a/103246
northgateregionalcenterdraftplanappendix05_transportationreport
waivers are permitted along Major Pedestrian Streets. • Require protected bike parking • Establish a payment in lieu of ...
0.00158784946 |
a/178279