Filter Results

501 to 525 of 2790
north-district-plan
ultimately to a major river or body of water.ZONING: The legally permitted use or uses ...
0.00169382535 |
a/78411
entire_2009-2014_proposed_cip
projects in the buildings and grounds they use. Project Selection: Seattle Center management decides which projects are of ...
0.00169381371 |
a/61504
ose director's rule 2025-01_final - signed
2025-01 Building Emissions Performance Standard Requirements 15 o A covered building must be proposed to be demolished in a ...
0.00169377879 |
a/175728
strataegicplan_appendixii_combined
For what reason are you most likely to visit a Seattle park? (A) Connect with nature. (B) Play a sport. (C) Use ...
0.0016935945 |
a/92589
seattle city light 2024 pos
or the Federal Savings and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as permitted under ...
0.00169348135 |
a/158102
2018-04-06 q1 surveillance review report-final
. The service is used to verify whether the driver license data is valid for the purposes of issuing or renewing a for-hire ...
0.00169326225 |
a/116975
seattle city light 2023 pos
or to the extent guaranteed as permitted under any other provision of State law. 5 USE OF PROCEEDS ...
0.00169317843 |
a/144115
seattle water rev 2022 pos
that it will neither take any action nor make or permit any use of gross 16 proceeds of that Series (or ...
0.00169283908 |
a/130992
adoptedufcmeetingnotes030420
Lot subdivision that came up last month. I’ll quote Art to explain the big picture: “The “3-million” MUP (Master ...
0.001692827 |
a/119031
2010_adopted_cip
of Transportation • Reimbursable services to other City departments or outside agencies (e.g. street use ...
0.00169236481 |
a/61612
seattle city light 2024 os with errata
Deposit Insurance Corporation or the Federal Savings and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as ...
0.00169233547 |
a/158600
adoptedufcmeetingnotes061020
the approach to the access driveway into Kubota Garden. It is irresponsible for Parks to defer to participate in the design process until ...
0.00169217191 |
a/119038
shivav6.3final
(MMI) Scale is a subjective measurement of earthquake effects and damage. The Mercalli scale uses twelve steps to describe ...
0.00169184175 |
a/57146
2010_proposed_cip_book
basis (e.g. accounting, payroll, human resources, facility rental, vehicles and equipment) • Reimbursable services to other City departments ...
0.00169161719 |
a/61672
cherry hillcompiledmimp_2016_07_08(0)
of the master planning process is to permit appropriate institutional growth within boundaries while ...
0.00169142359 |
a/77376
cherry hillcompiledmimp_2016_07_08
of the master planning process is to permit appropriate institutional growth within boundaries while ...
0.00169142359 |
a/77377
urbanvillagestudy
Density…….……...52    Task  4—Improvements  to  Identification  of  Villages  on  Future  Land  Use ...
0.00169141451 |
a/87676
ballardurbandesign-draftexistingconditionsreport
to provide design guidance to new development through the Design Review process. Rather, implementation of the Street Improvement Design ...
0.00169110636 |
a/86293
ballardexistingconditionsreport
Review process. Rather, implementation of the Street Improvement Design Standards would occur at a different stage of the ...
0.00169110636 |
a/108449
final_cemp_v15_08_08
to declare a “Civil Emergency”, for the Mayor to use an emergency power and, when circumstances permit, ...
0.001690979 |
a/57119
cheshiahud_appendices
. Implementation of the CLUL Master Plan will require improvements at several locations. Design, ...
0.00169088459 |
a/92248
2018 q4 surveillance technology acquisition report
for bench tests of a primary and backup solid state relay. SDOT 373 Public Facing Temporary No Parking Permit ...
0.00169084675 |
a/116973
opcd_oh_sdci_mha-c-amendments_ord
)) documentation 15 A. ((Permit application. The)) General 16 1. For any development to which this Chapter 23.58B applies, ...
0.00169069134 |
a/64769
movingtowardzerowastestudyvol2
polymer ƒ Product utilization ƒ Supplies ƒ Permitting and monitoring ƒ Contingency (15%) 289 Volume 2 ƒ This equates to ...
0.00169065665 |
a/113462
strategies_considered
ƒ Product utilization ƒ Supplies ƒ Permitting and monitoring ƒ Contingency (15%) 289 Volume 2 ƒ This equates to ...
0.00169065665 |
a/113244