You just searched for:
Search
Filter Results
9501 to 9525 of 9659
07-17-17-beacon-hill-greenbelt
http://www.seattle.gov/documents/departments/homelessness/cleanups/07-17-17 ...
☐ No SITE OCCUPANCY DATA Tents Structures Bed Rolls Vehicles TOTAL COUNT 2 0 0 1 (directly across street) 3 SITE CHARACT ...
0.00219842652 |
a/66330
rpmtgmaterials20250319
http://www.seattle.gov/documents/departments/citylightreviewpanel/documents ...
. The meeting was called to order at 9:03 a.m. Public Comment. There was no public comment. Standing Items: Chair’s Report. Leo Lam ...
0.00219842652 |
a/166857
09-8-2017-1st-mercer
http://www.seattle.gov/documents/departments/homelessness/cleanups/09-8-201 ...
OCCUPANCY DATA Tents Structures Bed Rolls Vehicles TOTAL COUNT 0 1 0 0 0 SITE CHARACTERISICS HEALTH CONDITIONS Park ☐ Y ...
0.00219842652 |
a/66358
02-24-20 yesler terrace-harborview litter pick
http://www.seattle.gov/documents/departments/homelessness/cleanups/2020/02- ...
conditions, tents, storage, and before/after photos. SITE OCCUPANCY DATA- Site occupancy must equal zero or ...
0.00219842652 |
a/66697
highland park_evaluation_accessible_
http://www.seattle.gov/documents/departments/sdot/stay healthy ...
, and Excellence.January 12, 2021What are Healthy Streets?Healthy Streets are closed to pass through traffic, but open to ...
0.00219842652 |
a/171869
20201105 nodo map for c3
http://www.seattle.gov/documents/departments/sdot/transportationplanning/no ...
Streets ExtensionCommunity Outreach•Informational mailer•Online survey requesting input on existing curb space usage•Survey ...
0.00219842652 |
a/106581
03-12-20 sw 1st ave s and s mead st litter pick
http://www.seattle.gov/documents/departments/homelessness/cleanups/2020/03- ...
, storage, and before/after photos. SITE OCCUPANCY DATA- Site occupancy must equal zero or photographic proof must show ...
0.00219842652 |
a/66763
08-8-17-1st-ave-s
http://www.seattle.gov/documents/departments/homelessness/cleanups/08-8-17- ...
☐ No SITE OCCUPANCY DATA Tents Structures Bed Rolls Vehicles TOTAL COUNT 1 1 1 0 3 SITE CHARACTERISICS HEALTH ...
0.00219842652 |
a/66346
udatsdotpresentationfeb52015
http://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/ballar ...
/ifltifibticollaborative/informal meeting spaces, fiberoptic data connections)BildiBuildingHeight•Higher floor to floor ...
0.00219842652 |
a/86368
adopted mm sdc meeting 2023-03-16 bell st
http://www.seattle.gov/documents/departments/opcd/designcommission/bell ...
EquityPreference between the two concepts, and advice for a hybridThe commissioners expressed a preference for the bike facility design of ...
0.00219842652 |
a/147377
cap update report_final_screen
http://www.seattle.gov/documents/departments/ose/cap update ...
a new public space for community activation and economic activity. Seattle currently has 4 parklets open and another 12 in ...
0.00219842652 |
a/88255
don2017_annualreport
http://www.seattle.gov/documents/departments/neighborhoods/shared/don2017_a ...
of this report. It is a snapshot to show you what we are doing and how people are responding. As this was our first full year leading this d ...
0.00219842652 |
a/78511
greenlakepavingboards_32018
http://www.seattle.gov/documents/departments/sdot/maintenanceprogram/greenl ...
on surveys, emails, meetings, and an open house, these are the themes that we heard: We are currently in the design phase ...
0.00219842652 |
a/102978
greenlakepavingboards_32018
http://www.seattle.gov/documents/departments/sdot/maintenanceprogram/35thav ...
on surveys, emails, meetings, and an open house, these are the themes that we heard: We are currently in the design phase ...
0.00219842652 |
a/102817
16-006_slanderst_sbab_presentation_10-5-16 final
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/pr ...
we heard 13 Feedback from the June open house indicated preferences for: •Architectural elements reflecting neighborhood’s ...
0.00219842652 |
a/107109
2016 rsji annual report
http://www.seattle.gov/documents/departments/rsji/2016 rsji annual ...
the country to speak on racial equity. In 2016, RSJI welcomed two extraordinary figures to speak at events that were open ...
0.00219842652 |
a/95894
2016 rsji annual report spread
http://www.seattle.gov/documents/departments/rsji/2016 rsji annual report ...
Speaker Series brings powerful and provocative speakers from across the country to speak on racial equity. In 2016, RSJI welcomed two ...
0.00219842652 |
a/95893
1656-documents
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
: 06.17.2006)Printed: 06.16.15 @10:15 AMPage6WA-CT-FNSE-02150.622476-SPS-1-15-0042059-066.Please be advised that our search did not ...
0.00219842652 |
a/59192
mhc011123comcastpp
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
TIMES EXCEPT WHEREPRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.11. BARRICADE OPEN DEPRESSIONS AND HOLES ...
0.00219842652 |
a/137249
june_sac_2025_minutes
http://www.seattle.gov/documents/departments/arts/downloads/sac/june_sac_20 ...
involved with social prescribing/art pharmacy for our community. TSAC expressed interested in this; this creates a positive narrative around ...
0.00219842652 |
a/171008
2017_0727_bgt_dac4_presentation_final_web_sm
http://www.seattle.gov/documents/departments/sdot/bikeprogram/bgt/2017_0727 ...
between June-July 2017 (including 4thof July weekend!)•Data shows increased levels in the block between 26th-24thduring ...
0.00219842652 |
a/100334
uhab_in_seattle
http://www.seattle.gov/documents/departments/council/members/obrien/uhab_in ...
or less!)The 7 Principles of Cooperation 1.Voluntary and open membership2.Democratic member control3.Member economic ...
0.00219842652 |
a/54495
06-14-17-eb-i-90-onramp
http://www.seattle.gov/documents/departments/homelessness/cleanups/06-14-17 ...
Community Photos to FAS? ☒ Yes ☐ No SITE OCCUPANCY DATA Tents Structures Bed Rolls Vehicles TOTAL COUNT 8 2 0 0 10 ...
0.00219842652 |
a/66318
bld120723thehansenbuildingpp
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
bld120723thehansenbuildingpp Project description: Install removable bollard on private property, directly in front of 5101 Ballard Ave at ...
0.00219842652 |
a/150154
06-21-17-ne-ravenna-blvd-i-5
http://www.seattle.gov/documents/departments/homelessness/cleanups/06-21-17 ...
☐ No SITE OCCUPANCY DATA Tents Structures Bed Rolls Vehicles TOTAL COUNT 0 0 2 0 2 SITE CHARACTERISICS HEALTH ...
0.00219842652 |
a/66322