Filter Results

951 to 975 of 1811
2019annual_report_0106_2020_final
improvements 10 17 12 10 10 49 4 Traffic spot improvements 11 10 14 14 10 49 4 Corridors optimized 5 5 5 6 5 21 4 Regulatory street ...
0.00215204339 |
a/99533
lpb504_sta_nom
& Galer, Seattle for Steinhart Stanley Theriault & Anderson Architects.” The drawings include the plot plan and profile sheet ...
0.00215204339 |
a/127584
backyardcottagesguide-final
choose configuration, site planning, style and design features based on individual needs, financial resources and site conditions.The ...
0.00215204339 |
a/108133
4171_landmarks-information
of the City, State or Nation.” The language calling for significant character has been described as a standard of integrity. Integrity is a ...
0.00215204339 |
a/59318
mayors plan - neighborhood plans
of the First Hill/Capitol Hill Urban Center N215Seattle 2035Neighborhood Plans CH-P9 Zoning and design guidelines should ensure that new ...
0.00215204339 |
a/87426
lfs-existing-conditions-and-context-memorandum
and localtraffic impacts, freeway function, and the ability to connect the lid to the adjacentneighborhood ...
0.00215204339 |
a/135026
publicspacesliferecommendations
little room, positive microclimates and social space may be created. Green pockets should be inserted into the downtown ...
0.00215204339 |
a/96578
lpb040523montlakedwgs
BOARD FORANCHOR BOLT.5.3/8" X 8" ANCHOR BOLT, 24" O.C. MAX.6.CONCRETE CURB PER 9/L2.01 OR RETAINING WALL7.BASE STONE (SEC 321123.23), 3" ...
0.00215204339 |
a/140522
st_final_coa
DRAWINGS SHALL BE SIGNED AND SEALED BY LICENSED ELECTRIACAL ENGINNER, OR MASTER ELECTRICIAN. PRIOR TO WORK ...
0.00215204339 |
a/75470
sc_nomapp
flag poles. Each of the canopy’s metal sections feature a five-point golden crown at the western opening; the central section has a ...
0.00215204339 |
a/75428
lidi5existingconditionscontextmemorandum
the lid to the adjacentneighborhood fabric.·North-south pedestrian and bicycle connectivity would need further study, ...
0.00215204339 |
a/87191
2012sbcintro
of these generous people.Electronic Mailing ListIf you would like to receive occasional email messages notifying you of future amendments ...
0.00215204339 |
a/97377
can_can
primary performance venue.DEMO NON LOAD BEARING OFFICE WALLWall to be removed-We hope to replace the 3 current Steelhead ...
0.00215204339 |
a/73660
sdot_birt_report_appendices_110220
stakeholders.Ballard Bridge Planning Study (2019) Magnolia Bridge Replacement The Magnolia Bridge opened in 1930 and is showing ...
0.00215204339 |
a/103975
lpbcurrentnom_steinhart_theriault_anderson
for the “Architects’ Office at Eastlake & Galer, Seattle for Steinhart Stanley Theriault & Anderson Architects.” The drawings include the ...
0.00215204339 |
a/74546
lpbcurrentnom_swedishclub
the canopy to become flag poles. Each of the canopy’s metal sections feature a five-point golden crown at the western opening; the central ...
0.00215204339 |
a/74548
lpb040523montlakedwgs
BOARD FORANCHOR BOLT.5.3/8" X 8" ANCHOR BOLT, 24" O.C. MAX.6.CONCRETE CURB PER 9/L2.01 OR RETAINING WALL7.BASE STONE (SEC 321123.23), 3" ...
0.00215204339 |
a/140470
desrpt_steinharttheriaultandersonofficebuilding
& Galer, Seattle for Steinhart Stanley Theriault & Anderson Architects.” The drawings include the plot plan and profile sheet ...
0.00215204339 |
a/166888
01-13-05
, and American Eagle Communities-LLC, the City will buy the 23-acre Capehart housing site for $9 million and some City-owned land to be ...
0.00215204339 |
a/91970
02-23-06
on this project, please see http://www.seattleaquarium.org/about/pna/index.html 2 Freeway Park: This week Sea Reach Ltd. installed the ...
0.00215204339 |
a/91995
07-27-06
Programs for the Arts is using Neighborhood Matching Fund (NMF) and community fundraising to fabricate a new one and to ...
0.00215204339 |
a/92004
thestateofthenycurbanforest
positive signs. For example, canopy has increased across site types and most geographies due to a mix of new tree plantings ...
0.00215204339 |
a/127700
policytreemanagement
, weeding,mulching, and pruning, etc. It may also include a completed Maintenance Agreement signed by permittee.For Tree ...
0.00215204339 |
a/92566
viewpoints_vmp
amount of exposed soil to steep sites with signs of previous mass failures. There are important distinctions between ...
0.00215204339 |
a/92747
counciladopted2016_neighborhoodplanning
Hill/Capitol Hill Urban Center N224Seattle 2035Neighborhood Plans Capitol HillCH-P9 Zoning and design guidelines should ensure that new ...
0.00215204339 |
a/87526