Filter Results

701 to 725 of 1811
stadiumstudyearlyguidancepacket1and2
its surroundings by reinforcing the existing city fabric and providing a destination, gathering place, and becoming a vital ...
0.00215709838 |
a/87727
lpb060524uwandersonhallpp
and they may not yet be showing signs of stress from these impacts. Due to the age of the two buildings on-site many of ...
0.00215709838 |
a/156834
2021sfcchapter12
for a duration of not less than 2 hours. 1203.2.6 Exit signs. Emergency power shall be provided for exit ...
0.00215709838 |
a/162447
2021sfcchapter32
or linen Class III Diapers; plastic or nonwoven fabric; cartoned Class IV Diapers; plastic or nonwoven ...
0.00215709838 |
a/162452
opcd-uptownneighborhooddesignguidelines-draft(0)
con-centrations of jobs and housing. These facilities work best when they are carefully integrated into the urban fabric ...
0.00215709838 |
a/87878
opcd-uptownneighborhooddesignguidelines-draft
-centrations of jobs and housing. These facilities work best when they are carefully integrated into the urban fabric of ...
0.00215709838 |
a/87879
uptowndg-sepa-draft
and housing. These facilities work best when they are carefully integrated into the urban fabric of the neighbor-hood and ...
0.00215709838 |
a/87886
uptowndg2019
. These facilities work best when they are carefully integrated into the urban fabric of the neighbor-hood and reinforce ...
0.00215709838 |
a/96373
techd
of the following general activities: • Demolition, including removal of pavement, curbs, sidewalks, driveways, trees, ...
0.00215709838 |
a/100524
ch3_design_construction
...........................................................................................................................3-35 ...
0.00215696543 |
a/113785
psb12-16-15_minutes
of the building ARC Report: Mr. Kralios reported that ARC reviewed plans and photos. Staff Report: I have met with the Alliance and ...
0.00215696543 |
a/73753
id5-10-16_minutes
OF APPROVAL 051016.21 628 S. Weller St. – Ohio Hotel Applicant: Peter Lai, Action Design Signs Ms. Frestedt ...
0.00215696543 |
a/72940
pspbminutes4-3-19
in kind. Ms. Curran said it is straightforward and there are no impacts to historic fabric. Mr. Donckers disclosed he is ...
0.00215696543 |
a/74071
ar2012
) • Signs on historic buildings can be problematic. The exterior of the Medical-Dental Building is a designated ...
0.00215696543 |
a/65123
desrptseafirst_natl_bank_denny
of continuous urban fabric that made up the westernmost portion of the Cascade neighborhood. (The U.S. Census defines the ...
0.00215696543 |
a/76235
lpb3-3-21
sign, select door replacement, security cameras, and relocation of sign and donor panels Rischel ...
0.00215696543 |
a/74659
seattledesigncommission-2002.11.07greenwoodlibraryminutes
signage; and ƒ recommends approval of Pre-Design. This is the second phase of a three-part project. The first phase was a pilot project that ...
0.00215696543 |
a/85304
sdot
8,414,048 8,716,699 8,082,550 Full-time Equivalents Total 33.25 33.25 33.25 33.25 Signs & Markings Program The ...
0.00215696543 |
a/62325
seattledesigncommission-2009.02.19rosestreetwolcottavesvacationmi ...
artworks. Commissioners prefer the idea of integrating signage in proposed walls, groundsurfaces etc. as opposed to separate and ...
0.00215696543 |
a/85466
seattledesigncommission-2008.12.04southeastseattletransportations ...
South, the sharrow idea is a waste. A well-signed, zig zag bike corridor would be a better alternative. Page 4 of 17 That ...
0.00215696543 |
a/85460
2016-art-interruptions-invitational-guidelines
signs or sign posts, unless pre-approved by Arts and SDOT • Artist will monitor and maintain the artwork ...
0.00215696543 |
a/49194
2011-2016_adopted_cip
Transit ST2 funding for the First Hill Streetcar project under an interlocal agreement signed in 2009. This project ...
0.00215696543 |
a/61786
final_2011-2016_cip
includes $130 million of Sound Transit ST2 funding for the First Hill Streetcar project under an interlocal agreement ...
0.00215696543 |
a/61799
2019.04capitolhill_dg
of the LINK light rail station construction staging sites that will mend the community fabric to create a new heart and ...
0.00215696543 |
a/86457
capitolhill_dg_sepa_draft_2019_01_17
initiatives:• Opening of the Capitol Hill LINK light rail station in 2016;• The upcoming development of the LINK light rail station ...
0.00215696543 |
a/86466