Sign Inspections

What Is It?

After you install a sign, you must schedule an inspection. Some signs also need footing or special inspections (structural or geotechnical) during construction. All sign installations require a final inspection before your permit expires.

Footing Inspection. You need a footing inspection for every ground sign or pole sign before you pour the concrete foundation or footing. Schedule the inspection at least 24 hours before your concrete delivery. If you need special arrangements, call the sign inspector directly at 1 (206) 684-8419" style="font-size: 12pt;">206-684-8419.

Special inspection. Some projects may need a special inspection if a technical expert is required to review the structure or soil conditions. We will give you a special inspection schedule form if your project requires one. You must send documentation from each special inspection to the sign inspector before you request a final inspection.

Special inspections may be required for:

  • structural fabrication or connection methods
  • soil conditions that affect safety
  • elements that add load or increase risk to the structure

The project engineer or SDCI will determine whether your sign needs special inspection.

Final inspection. Request your final inspection within three days of completing installation, or within 24 hours of energizing an electrical sign. “Energizing” means turning on electrical power for the first time.   During the final inspection, we confirm your installation matches the approved plans and all applicable codes.

You must pass a final inspection for all sign, awning, canopy, outline lighting, or border tube installations before your permit expires. If your permit expires first, you may need to reestablish your permit and pay a fee. If too much time has passed, you’ll need a new permit that complies with current regulations.

How to Schedule

  1. Request your inspection before 7 AM on the day you need it.
  2. Have your permit number ready when you request the inspection.
  3. If your installation includes a foundation, schedule your footing inspection at least 24 hours before you pour the concrete.
  4. We place inspection requests received after 7 AM on the list for the next business day.

Ways to Schedule

Construction and Inspections

Sam Steele, Interim Director
Address: 700 5th Ave, Suite 2000, Seattle, WA, 98104
Mailing Address: P.O. Box 34019, Seattle, WA, 98124-4019
Phone: (206) 684-8600
Phone Alt: Violation Complaint Line: (206) 615-0808
Contact Us

Sign Up for Latest Updates

Subscribe