Filter Results

4326 to 4350 of 12508
sepachecklistfor2016rowimfinal
, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a ...
0.00302929059 |
a/103933
georgetown_community_resource_guide_final
or NMFund@seattle.gov; For location and design assistance, contact Howard.Wu@seattle.gov or (206) 684-3902. ...
0.00302929059 |
a/106555
20210303-critical-bicycle-connections_sbab(0)
and opportunities3/3/21Department of Transportation 3Presentation overview•Goal and purpose of the critical bicycle connections ...
0.00302929059 |
a/99944
dwf
, and management program completes the inventory of ditches around the City for input into the City's Geographic Information System. Work ...
0.00302929059 |
a/60525
sdot acyclica sir draft - for public comment 2019-02-05
on both large roadside reader boards, and on the Traveler Information Map web application. Retroactive Technology ...
0.00302929059 |
a/117186
60plan_checklist_fill_202109
and plan sheets showing improvements within the right of way.The SDCI Land Use Zoning Correction letter from the initial SDCI Land Use ...
0.00302929059 |
a/104802
sdot acyclica sir draft - for public comment 2019-02-05(1)
time data provided by Acyclica informs the effectiveness of their actions. The TOC provides the data to commuters in real-time on both large ...
0.00302929059 |
a/117185
shivav7.0-flood
in critical areas. Vulnerability The National Flood Insurance Rate Maps and the U.S. Army Corps of Engineers inundation ...
0.00302929059 |
a/57152
dpdrecommendationsforgreenwoodrezone2010
opportunity, affirmative action employer. Accommodations for people with disabilities provided upon request. Greenwood Town Center Rezone ...
0.00302929059 |
a/87969
performance-audit-committee-4-30-2020
byAccountability Partners11Policy Work9•Descriptive Audits•Mapping SPD Crisis Intervention and human ...
0.00302929059 |
a/53244
sclcap_000
. Project Selection Criteria Three years ago, City Light completed the most extensive planning process ever undertaken by the utility to ...
0.00302929059 |
a/62353
cam2309
, or contaminated soil• The site is feasible for infiltration. Check the “Infiltration Evaluation Not Required” layer on the Seattle ...
0.00302929059 |
a/101632
ballardguidelines
Boundary as reflected in Map 1 (page v). Guidelines define the qualities of architecture, urban design, and public space ...
0.00302929059 |
a/87949
sdot acyclica sir draft - for public comment 2019-02-05(0)
roadside reader boards, and on the Traveler Information Map web application. Retroactive Technology Request By: ...
0.00302929059 |
a/117184
4193_preliminary_report_9082014
are subject to the City’s disposition policies and will be addressed separately in other preliminary reports. A map ...
0.00302929059 |
a/59360
bgt_sepachecklist_final
of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably ...
0.00302929059 |
a/99406
roadmap_section4
-funded public art projects. Fee-based consultation involves activities such as running an artist selection process. Public art walking tour ...
0.00302929059 |
a/49526
sclcap
Criteria Three years ago, City Light completed the most extensive planning process ever undertaken by the utility to serve as a road ...
0.00302929059 |
a/62544
gettingorganized_allmeetingpacketmaterials_02-01-2011
is to: Map your neighborhood and identify the locations of: the Neighborhood Meeting Site, First Aid Station and Shelter & ...
0.00302929059 |
a/57307
inclusive-outreach-and-public-engagement-guide-2012-update
Toolkit. Demographic data and maps http://www.census.gov/ Language maps and lists of interpretation and ...
0.00302929059 |
a/152526
encampmentsprogressdashboard
-informed practices • Quantity and hours of operation of public restrooms with running water Exhibit 2: Map of City Hygiene ...
0.00302929059 |
a/131445
sidewalksfinalreportrev3
over the summer to inspect 2,300 miles of city sidewalk using a geographic mapping application. The primary goal of the ...
0.00302929059 |
a/144601
sidewalksauditfinalreportrev2
to perform a sidewalk condition assessment of existing infrastructure. SDOT hired 14 interns over the summer to inspect 2,300 miles of city ...
0.00302929059 |
a/50638
aia-report_2012-2017
) approved the areas designated as the Central Core (including Pioneer Square) and the North AIAs boundaries in November 2006. (Please see ...
0.00302929059 |
a/72399
tews-june30-presentation-final-06302021
, 2021Date (xx/xx/xxxx)Department NameSeattle Public Utilities2Meeting agenda•Welcome(Alex Chen, Seattle Public Utilities)•Inundation ...
0.00302929059 |
a/116475