Filter Results

1501 to 1525 of 1913
20210714-modal-integration-next-steps_spab
•Transportation focus based on land use•References transportation master plans for prioritizing curb ...
0.00156041293 |
a/103877
desrptamericanmeter
is blank and made of non-original concrete masonry units (CMU) installed after a fire in the adjacent building to the south. Building ...
0.001560409 |
a/75878
draftufc2016work plan011316
SSD, DON, OSE, Assoc’s April Sept Position Paper f) Track the Cheasty Greenspace Mountain Bike Trail Pilot Tom/Donna Parks ongoing ongoing ...
0.00156039221 |
a/118547
2018-04-04finalsbabmeetingnotes
? With direction of the mayor, is it going more car oriented? • Liam Bradshaw: is upset that safety and bike infrastructure pitted against ...
0.00156039221 |
a/107059
2017-12-06finalsbabminutes
report avoiding use of the greenway because of these. • Robert Getch: Supports Beacon Avenue protected bike lanes to implement Bicycle ...
0.00156039221 |
a/107056
dcpresentation1bike-master-planagendaid4340
dcpresentation1bike-master-planagendaid4340 seattle bicycle master plan Seattle Design Commission March ...
0.00156039221 |
a/85155
20180918_sfab_presentation_fmp_2018-2022_implementationplan
of TransportationFreight Master Plan2018-2022 Implementation Plan and Progress ReportDate ...
0.00156035612 |
a/101860
cpi-10-highlights
Nickerson Street to meet the needs of a wide variety of users. Nickerson is an important bike corridor listed in the Bike ...
0.00156035612 |
a/88282
desrptpugetsoundpowerutilitiesbldg8th_roy
along Mercer Street, underway for more than a half-decade, has recently been completed, and construction is ongoing on nearby Broad Street, ...
0.00156021875 |
a/76213
puget-sound-power-designation
Street, underway for more than a half-decade, has recently been completed, and construction is ongoing on nearby Broad Street, just south of ...
0.00156021875 |
a/76505
desrptpugetsoundpower&light
Street, underway for more than a half-decade, has recently been completed, and construction is ongoing on nearby Broad Street, just south of ...
0.00156021875 |
a/76211
desrptpugetsoundpowerlight
Street, underway for more than a half-decade, has recently been completed, and construction is ongoing on nearby Broad Street, just south of ...
0.00156021875 |
a/76212
2018_0607_final_loc_juneminutes
in the Bicycle Master Plan sub-program. The 11 miles on Madison would be the most at risk because it’s not ...
0.00156021875 |
a/99519
memoworksheet2014compplanamendments
and the Freight Master Plan. • An economic study, with comparisons of job creation, tax ...
0.00156021875 |
a/108995
fairfax_nom_application
at this location [Image 18]. Above the basement level, two apartments are accessed on each side of the double-loaded corridor, with the ...
0.00156021875 |
a/75241
lpbcurrentnom_fairfax
at this location [Image 18]. Above the basement level, two apartments are accessed on each side of the double-loaded corridor, with the ...
0.00156021875 |
a/74463
2018_0913_bgt_dac_meeting10_summary_final
) Numerous members of the public attended the meeting and expressed the following: • The city’s Freight and Bicycle ...
0.00156019314 |
a/100389
west marginal way observations and questions
10 million tons per yearData from other plans –Streets Illustrated2016 Freight Master ...
0.00156019314 |
a/101904
notice-of-dns_2.13.2023
. ▪ Seattle Department of Transportation, Seattle Transit Master Plan, Determination of Non-significance, ...
0.00155990582 |
a/138519
first-hill-snapshot
Affordability• The Creation, Activation & Preservation of Cultural Space Report• 2017 Parks and Open Space Plan• Parks ...
0.00155990582 |
a/72497
roosevelt-snapshot
• Roosevelt Neighborhood Association• Roosevelt Neighborhood Land Use Committee• Roosevelt P-Patch• Seattle Northeast RotaryNeighborhood ...
0.00155990582 |
a/72514
judkins-park-snapshot
Strategic Plan• Pedestrian Master PlanFreight Master ...
0.00155990582 |
a/72502
aluv-snapshot
SchoolNeighborhood Past Plans / Reports / Resources• Aurora Licton Urban Village Find It, Fix It Post Walk Update• Aurora ...
0.00155990582 |
a/72485
adoptedufc2016work plan020316
Freight Master Plan Leif/Sandra SDOT TBD TBD Recommendation g) Track SDOT’s Pedestrian ...
0.00155988091 |
a/119434
adoptedrevisedufc2016work plan081016
Recommendation f) Track SDOT’s Freight Master Plan Leif/Sandra SDOT TBD TBD ...
0.00155988091 |
a/119427