Filter Results

101 to 125 of 1155
sdot_2429adoptedcip
work includes street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, ...
0.0019030465 |
a/153290
transportation_projects
Bicycle Master Plan. Work includes installing bike lanes and bicycle route signing, completing key links ...
0.00190286979 |
a/61165
sdotcip_000
paving and resurfacing; • building new sidewalks and curb ramps; • school safety improvements; • implementation of the Bike and Transit ...
0.00190272881 |
a/63153
transportation
implementation of the Bicycle Master Plan, construction of more than 13 blocks of new sidewalks, further ...
0.001902536 |
a/61345
sdot_projects
in thousands of dollars.2007-2012 Proposed Capital Improvement Program-308-TransportationStart Date:End Date:This program implements the ...
0.00190247 |
a/61205
sdotcap
and resurfacing; • building new sidewalks and curb ramps; • school safety improvements; • implementation of the Bike and Transit ...
0.00190236617 |
a/63082
lightrailamendmentsordinanceapril2025
and must be terminated 14 or removed when construction of the related light rail transit facility is completed or in 15 accordance with the ...
0.00190113473 |
a/168160
transportation
of the Bicycle Master Plan, design and construction of three new trail segments, construction of more than ...
0.00190068036 |
a/61478
utilitiesandtransportation
the Transit Master Plan, accelerate implementation of the Pedestrian Master ...
0.00190064346 |
a/61884
transportation
the Gap program for 2009 include a plan to repave more that 24 lane miles of arterials, continued implementation of the ...
0.00190047047 |
a/61533
stp_checklist2022_0610_signed_rd_encrypted
for the environmental elements (Part B) that they determine do not contribute meaningfully to the analysis of the proposal. June 2022 City ...
0.00190024835 |
a/129527
approved sfab minutes october 2023
have a lot of concerns about the freight elements in particular, and the plan overall. I don't see where ...
0.00190003379 |
a/153908
appendixb
needs HCT.6/24/2014DisplayBoardsComp Plan must support all adopted transportation master ...
0.0018999977 |
a/87489
sdot_birt_report_appendices_110220_g
39) Freight W Dravus Street NB on/off-ramp SB Off/On-ramps Interbay Both Alternatives Freight ...
0.00189977058 |
a/103982
sfab minutes april 2023 approved
, a lot of community engagement. So, that was a big thing as part of coming in to make sure 16 Lot of community engagement. ...
0.00189865311 |
a/143516
august 2023 sfab minutes approved
not acceptable to mix bikes and trucks. SDOT knows how to do it right with the design guidelines and the Freight ...
0.00189829851 |
a/147926
transportation_projects
at the Budget Control Level. Amounts are in thousands of dollars.Bike Master Plan ImplementationSeattle ...
0.001897103 |
a/61670
southlakeunionurbancenterneighborhoodplan
, the City acquired the fi nal fi ve acres of Lake Union Park from the Navy, creating a twelve acre waterfront park. Redevelopment of the ...
0.00189698709 |
a/87715
transportation_projects
are in thousands of dollars.2010 - 2015 Proposed Capital Improvement ProgramBike Master Plan ...
0.00189669058 |
a/61738
spu_water_projects
Cathodic Protection Master Plan by installing pipe exterior corrosion protection systems along the major ...
0.001896534 |
a/61283
spu_water_projects
’s Cathodic Protection Master Plan by installing pipe exterior corrosion protection systems along the ...
0.001896534 |
a/61341
transportation_projects
in thousands of dollars.2008-2013 Adopted Capital Improvement Program-285-TransportationStart Date:End Date:This program implements the ...
0.00189638941 |
a/61290
transportation
projects identified in the City's Intelligent Transportation System (ITS) Strategic Plan and ITS Master ...
0.00189626124 |
a/60924
utilitiesandtransportation
in 2011 and 2012 to update and complete the Transit Master Plan, accelerate implementation of the ...
0.00189611688 |
a/61896
sfab dec 2022 minutes - approved
12/08/22 MEETING 8 Christopher Eaves: I don't have a good answer for you, Christine. To give context to some of our new board members, ...
0.001895654 |
a/138436