You just searched for:
Search
Filter Results
401 to 425 of 1929
2015tigerappconsolidated
https://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/2015 ...
aggressive goals for increasing the share of people walking, biking and using transit as part of its Climate Action Plan an ...
0.00189506845 |
a/100747
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2126propose ...
sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master ...
0.00189463468 |
a/63418
transit
https://www.seattle.gov/documents/departments/sdot/stp/transit.pdf
on and supersede the 2016 Transit Master Plan (TMP). The Seattle Department of Transportation’s (SDOT’s) ...
0.00189462793 |
a/158024
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2429propose ...
; school safety improvements; implementation of the Bike, Pedestrian, Freight, and Transit Master ...
0.00189459464 |
a/147702
ballardurbandesign-draftexistingconditionsreport
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/balla ...
approved the Sound Transit 2 plan, which included studying potential High Capacity Transit (HCT) options between Ballard ...
0.00189443515 |
a/86293
ballardexistingconditionsreport
https://www.seattle.gov/documents/departments/seattleplanningcommission/min ...
Transit 2 plan, which included studying potential High Capacity Transit (HCT) options between Ballard and downtown Seattle. ...
0.00189443515 |
a/108449
sfab oct 2022 minutes - approved
https://www.seattle.gov/documents/departments/sdot/boardscommittees/sfab/sf ...
SODO, and the manufacturing and industrial areas. I got involved in the Freight Master ...
0.0018944128 |
a/138437
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2126adopted ...
new sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, and Transit Master ...
0.00189430872 |
a/63403
seattle industrial deis ch 3.8 2021_12
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/indus ...
use goals and policies in the Comprehensive Plan and/or the VISION 2050 regional growth plan, Countywide ...
0.001893887 |
a/87157
sdotcip
https://www.seattle.gov/documents/departments/financedepartment/2227adopted ...
and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, ...
0.0018935086 |
a/127136
transportation
https://www.seattle.gov/documents/departments/financedepartment/1015adopted ...
. ♦ Pedestrian and Bicycle Infrastructure Investments: To strengthen pedestrian and bicycle infrastructure throughout the City, a new ...
0.00189338275 |
a/61667
2019_2024_pmp_implemplan_opt
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/pe ...
2019_2024_pmp_implemplan_opt Seattle Department of TransportationSEATTLE PEDESTRIAN MASTER PLAN2019-2024 Implementation ...
0.00189333782 |
a/99323
oneseattleplandeissummary
https://www.seattle.gov/documents/departments/opcd/seattleplan/oneseattlepl ...
oneseattleplandeissummary Draft EIS ▪ One Seattle Comprehensive Plan Update ▪ March 2024 1-1 1 SUMMARY Source: City of ...
0.00189286086 |
a/153569
transportation
https://www.seattle.gov/documents/departments/financedepartment/1015propose ...
ongoing revenue from this source. ♦ Pedestrian and Bicycle Infrastructure Investments: To strengthen pedestrian and bicycle infrastructure ...
0.00189279183 |
a/61735
livablesouthdowntownplanningstudy2009
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/china ...
(1998);The Chinatown, Japantown, Little Saigon International District Urban Design Streetscape and Open Space Master ...
0.001892643 |
a/86586
southdowntownexecutiverecommendations
https://www.seattle.gov/documents/departments/opcd/vault/southdowntown/sout ...
Streetscape and Open Space Master Plan (2003, InterIm Community Development;Greater Duwamish Manufacturing ...
0.001892643 |
a/88170
seattle-ltgo-utgo-2012-os
https://www.seattle.gov/documents/departments/investorrelations/delete/seat ...
demands, including those priorities and investments identified in the Pedestrian Master Plan and the ...
0.00189234107 |
a/58540
seattle-ltgo-utgo-2012-os
https://www.seattle.gov/documents/departments/seattlegovportals/business/in ...
demands, including those priorities and investments identified in the Pedestrian Master Plan and the ...
0.00189234107 |
a/107398
transportation
https://www.seattle.gov/documents/departments/financedepartment/0813adopted ...
of arterials; early implementation of the Bicycle Master Plan; construction of more than 13 blocks of new ...
0.00189217809 |
a/61287
treesidewalksoperationsplan_final215
https://www.seattle.gov/documents/departments/sdot/trees/treesidewalksopera ...
maintenance to address implementation of the revised Street Tree Ordinance and the walkable zone (as defined in the Pedestrian ...
0.00189217809 |
a/106624
treesidewalksoperationsplan_final215
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/tr ...
maintenance to address implementation of the revised Street Tree Ordinance and the walkable zone (as defined in the Pedestrian ...
0.00189217809 |
a/99148
pedestrianmasterplan_sepa_checklist
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/pe ...
, directly related to this proposal. The following information has been prepared in relation to this project: Seattle ...
0.00189217215 |
a/99325
sdot
https://www.seattle.gov/documents/departments/financedepartment/2227propose ...
throughout the city. Funding allocation varies year to year based on planned projects. The table below shows a summary of ...
0.00189205236 |
a/63567
sdot_2429adoptedcip
https://www.seattle.gov/documents/departments/financedepartment/2429adopted ...
work includes street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, ...
0.00189186307 |
a/153290
transportation_projects
https://www.seattle.gov/documents/departments/financedepartment/0712adopted ...
Bicycle Master Plan. Work includes installing bike lanes and bicycle route signing, completing key links ...
0.001891689 |
a/61165