Filter Results

2326 to 2350 of 12078
2021swmanualvol1projectminimumrequirementsclean
or addition or replacement of a structure; 5. structural development, including construction, installation, or expansion of a ...
0.002202679 |
a/96984
boundarynrhp
a protracted fight, in December 1918, City Light secured construction permits from the federal government to ...
0.00220266334 |
a/50770
sdci
Budget Overview The City of Seattle continues to see historically high levels of development activity in 2019. In 2018, SDCI’s volumes ...
0.002202435 |
a/63380
urban design study - mha dtslu implementation
; or (c) no known proposals for redevelopment.Step 3We designated parcels as residential, commercial, or mixed-use according to several ...
0.00220241584 |
a/65086
adoptedufcmeetingnotes022422
no permits for removing significant trees on private property Voluntary reporting yes no 2 week posting ...
0.00220241584 |
a/127737
draftufcmeetingnotes022422
no permits for removing significant trees on private property Voluntary reporting yes no 2 week posting ...
0.00220241584 |
a/126490
seattle-water-rev-2015-os
Department of Commerce D-4 Construction The table below lists the value of housing construction for which building ...
0.00220239814 |
a/107422
seattle-water-rev-2015-os-plus-errata-notice
to build a hydroelectric power plant on the South Fork of the Tolt River, resulting in modifications to the terms of the ...
0.00220239814 |
a/107421
seattle-water-rev-2015-os
Department of Commerce D-4 Construction The table below lists the value of housing construction for which building ...
0.00220239814 |
a/58576
seattle-water-rev-2015-os-plus-errata-notice
to build a hydroelectric power plant on the South Fork of the Tolt River, resulting in modifications to the terms of the ...
0.00220239814 |
a/58575
seaclimatepreparedness_august2017
, design review and permit processes, incentives and assistance programs for energy and water conservation. Together, these ...
0.00220239768 |
a/57454
2021sfcintro
is fully compatible with all of the International Codes® (I-Codes®) published by the International Code Council® (ICC®), including the ...
0.00220239768 |
a/162467
lpbcurrentnom_swed_supplemental report_bola
permit set as the site for the building’s original construction.  Thus, while it includes two driveways to ...
0.00220239768 |
a/74549
upperqueenanneguidelines
(For more information refer to www.seattle.gov/dpd/Permits/GreenFactor ).b. Recommended Landscape Enhancements The ...
0.00220239768 |
a/96371
seaclimatepreparedness_august2017
, design review and permit processes, incentives and assistance programs for energy and water conservation. Together, these ...
0.00220239768 |
a/90398
muplifespanextensiondraftordinance
to the permit made it reasonable not to submit an application for a building 4 permit, or ...
0.00220233714 |
a/148672
psb5-4-16_minutes
050416.21 Pioneer Building 600 1st Ave Change of use from retail to office in the basement 5,055 square foot ...
0.002202258 |
a/73773
dpr_projects
the acceptance of a grant from the Interagency Committee for Outdoor Recreation (IAC) for $36,000 to pay for design and ...
0.0022022333 |
a/61186
2024floodplainregulationssepaordinance
and security devices and has 2 no permanently attached additions. 3 ((P.)) "Start of construction" ((means and)) includes substantial ...
0.00220222888 |
a/158923
165_coa_dwgs
ELEMENTS REQUIRED AS PART OF THIS BUILDING PERMIT MUST BE MAINTAINED FOR THELIFE OF THE PROJECT.IF ...
0.00220219279 |
a/74106
scl-frn-2018-pos
Bureau of Economic Analysis, U.S. Department of Commerce E-4 Construction The table below lists the value of housing construction for ...
0.00220216718 |
a/58465
psb-8-5-20
stucco siding materials are generally not permitted. (7/99) D. Color. Building facades are primarily ...
0.00220216578 |
a/73740
korn_sr
. Synthetic stucco siding materials are generally not permitted. (7/99) D. Color. Building facades are ...
0.0022020808 |
a/74161
lpb-minutes-01-21-15
finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ...
0.00220207847 |
a/74368
lpb-01-21-15-minutes
finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ...
0.00220207847 |
a/74606
Previous 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 Next