Filter Results

2101 to 2125 of 9052
seattleindustriallandsmemoapril2021
to the Director, that acknowledges that the owner(s) and occupants of the building accept the industrial character of the ...
0.002184955 |
a/87171
decisionnotice
Critical Area (ECAs) review is required for building permit applications and has been conducted on the ...
0.00218494236 |
a/77948
caoannualreport2010
community, respecting the civil liberties of all. Building upon a top-to-bottom reorganization (the first in more than thre ...
0.00218494236 |
a/50256
restaurant-example-seafood
be met; the building structure must also be seismically updated.Construction and trade permits can take ...
0.002184941 |
a/56605
bitterlakedirectorsreport
, and multi-story buildings containing office or other non-retail uses. Five large multi-family and mixed-use ...
0.002184941 |
a/86429
psbminutes2-19-20
projecting element per facade may be permitted. (12/94) 4. Blade signs (signs hanging perpendicular to the ...
0.0021849405 |
a/74228
oneseattleplaneisscopingdetailedcommentsummary
Policy Act (SEPA) to address public agency actions like new plans, regulations, or permits. The EIS will share existing ...
0.00218493538 |
a/135760
2008attachmentb,programevaluationandotheractivitiesnarrative
2008attachmentb,programevaluationandotheractivitiesnarrative Attachment B City of Seattle Program Evaluation and Other Activities ...
0.00218493538 |
a/113425
fmorefundpolicy
renewed a permit by error or misunderstanding and subsequently determines that they no longer needed the ...
0.00218492374 |
a/64216
lpbminutes9-4-19
1947 or early 1948, and the building permit for construction was received in April 1948. Griffiths’ and ...
0.00218492374 |
a/75056
psb062624600alaskanpp
at each end of this area are required egress stairs for occupants of the building to reach the public way. The three ...
0.00218492374 |
a/157577
12-09-04_minutes
of a construction project that completely renovated this community building, creating artist studios and a multi-purpose ...
0.00218492374 |
a/91969
majorinstitutionminorhousingordd10
regulations pertaining to major 21 institutions, including methods for institutions to request, obtain advisory committee 22 review, and ...
0.00218482339 |
a/76978
psb062123flatsticksr
of any building, or any portion of a building, structure or lot in a special review district, and no ...
0.00218482339 |
a/143649
oneseattleplanengagementhubopenendedsummary
such as: • Building for low-income and marginalized folks in well-resourced neighborhoods • Building ...
0.00218482339 |
a/132296
city_light_detail
. The customer pays for this feeder. The project includes design, preparing permits and either building ...
0.00218482339 |
a/61491
9electricaldesignfinalredacted
background information on SPU facility types, electrical design elements, and design resources. 9.2.1 SPU Facility Types SPU ...
0.00218482339 |
a/154295
9electricaldesignfinal
accordingly. This section provides general background information on SPU facility types, electrical design elements, and design resources. ...
0.00218482339 |
a/113741
permitcond_6401-install
lines. 2. Public ways. 3. Buildings. 4. Stored combustible materials. 5. Hazardous materials. 6. High-piled stock. 7. Other ...
0.00218482059 |
a/135766
public_edit_v3_ch8_drainagewastewater_final_redacted
with a removable cap or plug. Used to access the lateral to free blockages. A sewer cleanout is usually located just inside the property ...
0.00218482059 |
a/113871
highrisepredesignconference
unless the desired Code Alternate is published in the Seattle Building or Fire Code. The form can be found at: ...
0.00218480616 |
a/97961
treeregsconstituentemailsthrough082519v2
and Property Records website (**) posts no building plan permits for these three (3) unit lots on the ...
0.00218480616 |
a/119471
protec17_cba_2019-2021_12162019
to either gender. 1.3 The City and the Union are jointly committed to ensuring equal opportunity and building a workforce ...
0.00218480616 |
a/83756
urmfaqoct2024
retrofits be required?• Currently, owners must retrofit URM building parapets when they are doing other ...
0.0021846015 |
a/161590
7-administration
Budget Overview Franchise Fees, Licenses, Permits, and Fines, $7,423Interest Earnings/Investment Earnings, $462012 Proposed ...
0.0021846015 |
a/61962