Filter Results

1701 to 1725 of 2177
sbabapril1bmp
progress report •Bridging the Gap Summary •Project highlights •Program highlights •Ridership Data 10 2014 Bridging the Gap Deliverable 2014 ...
0.00214708922 |
a/106906
7-24-2014
” did not want the “downhillers” in their neighborhood. The neighbors never said that. She requests the record be corrected ...
0.00214708922 |
a/91885
03-10-11
of operation schedule. The Queen Anne neighborhood is interested in raising funds to add an additional 26 hours of ...
0.00214708922 |
a/92098
resolution-25
control services. Works to enhance downtown and neighborhood parks operations by strengthening activation. Att B -2019 ...
0.00214708922 |
a/90774
property-toolkit-with-cover-2016-3
Seattle Association, Alliance for Pioneer Square, and Waterfront and Pioneer Square neighborhood representatives, has ...
0.00214708922 |
a/106510
eastmarginalsurveysummary_appendix b_comments(0)
provide a great greenway connection to Georgetown (Ohio Ave S. to S. HudsonSt., S. Hudson St. to 3rd Ave S., 3rd Ave S. to ...
0.00214708922 |
a/101645
eastmarginalsurveysummary_appendix b_comments
provide a great greenway connection to Georgetown (Ohio Ave S. to S. HudsonSt., S. Hudson St. to 3rd Ave S., 3rd Ave S. to ...
0.00214708922 |
a/101646
2018annualreport
in collaboration with SDOT and community volunteers300 Small trees funded by City Light in collaboration with the Trees for ...
0.00214708922 |
a/50700
mlkpbl_qanda_april2021(0)
Judkins and Rainier because it’s where both high speeds and collisions happen most frequently. We are ending near South Judkins Street ...
0.00214708922 |
a/100610
mlkpbl_qanda_april2021
and Rainier because it’s where both high speeds and collisions happen most frequently. We are ending near South Judkins Street because you ...
0.00214708922 |
a/100611
mlk_pbl_presentation_script_apr2021_live event
is complete, a route of protected bike lanes, the I-90 bike path, and neighborhood greenways will allow ...
0.00214708922 |
a/100621
c2c-cac-6-19
houses - very proud of community and all the work and donationsFor upcoming Refresh event, will be rallying volunteers and neighbors to do ...
0.00214489433 |
a/65967
stsc_16dec2016_meetingnotes
in neighborhood. Kids walk and bike along the greenway on 16th(?) and cross at 67th. Drivers N/S on 15th ...
0.00214489433 |
a/96237
stscminutesnovember2018
. There has been issue with a specific guard checking in and then leaving.School Traffic Audits - Robin RandelsRobin is contracting w/ ...
0.00214489433 |
a/96221
stscminutesoctober2018
sense due to greenway improvements (curb bulbs).Steven is crossing guard contact in Yvonne's absence. Can get electronic ...
0.00214489433 |
a/96222
stscminutes_102618
due to greenway improvements (curb bulbs).Steven is crossing guard contact in Yvonne's absence. Can get electronic file for ...
0.00214489433 |
a/96236
sbab-agenda11-05-14
sbab-agenda11-05-14 Seattle Bicycle Advisory Board Wednesday, November 5, 2014, 6:00 pm - 8:00 pm Seattle City Hall, Room 370 600 4th Ave, ...
0.00214489433 |
a/106956
nov 19 commentcard
the recommended route and safety improvementsfor the neighborhood greenway?What questions or comments do ...
0.00214489433 |
a/102118
6-2-15sbabcommentsonmoveseattle
, not just the most intrepid bicyclists, will choose to ride bikes for transportation because the city has more Protected Bike Lanes, ...
0.00214489433 |
a/107009
sbabminutes07_09_14
in the works are leveraging other program funding sources and tying in with planning of proposed Greenways: adding raised ...
0.00214489433 |
a/107087
route 44 online presentation script
crossing And add bicycle detection for future Neighborhood Greenway crossingsThis design will improve ...
0.00214489433 |
a/106445
highland park s
highland park s N21ST AVE SW20TH AVE SWDELRIDGE WAY SW18TH AVE SW17TH AVE SWSW HENDERSON ST15TH AVE SWSW BARTON ...
0.00214489433 |
a/104021
spab october 2014 meeting notes
infrastructure is a big part of design details that we will describe. • Paul: Three neighborhoods within corridor: Belltown ...
0.00214489433 |
a/107892
spab october 2014 meeting
infrastructure is a big part of design details that we will describe. • Paul: Three neighborhoods within corridor: Belltown ...
0.00214489433 |
a/107893
spabnovember2014meetingnotes
with national best practices. Are we getting the right data, using it in the best way? Review and update the toolbox. One key tool not yet ...
0.00214489433 |
a/107931