Filter Results

1651 to 1675 of 3125
cb118402final
, 11 restriping of 5,000 crosswalks, implementation of 48 Safe Routes to School projects and 12 30 Neighborhood Street Fund ...
0.00215696543 |
a/99246
4-1 (uw parrington hall)
they are now missing; if possible, curbs and gutters should also be added. The 1998 Eastlake Neighborhood Plan and the ...
0.00215696543 |
a/78092
4-4 (university branch)
students from Roosevelt high walk through the neighborhood. RavennaSDOT17-473Crossing improvements to 12th Ave NE & NE ...
0.00215696543 |
a/78095
130th145thstationareaplanningfaq
improvements that will make it easier and safer to get to transit stations, such as separated bike lanes, neighborhood ...
0.00215696543 |
a/87255
idminutes5-23-17
discussion at the May 23, 2017 public meeting, and forward this written recommendation to the Department of Neighborhoods ...
0.00215696543 |
a/73134
appendixcap
and Connecting to GreenwaysThis project will increase the number of miles of safe pedestrian routes for all ages.200CitywideK73484Belltown ...
0.00215696543 |
a/62337
notes-2015-03-12(1)
that the goals ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and ...
0.00215696543 |
a/77472
notes-2015-03-12(0)
that the goals ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and ...
0.00215696543 |
a/77471
notes-2015-03-12
ramp down over time. Some improvements are tied to the first project, including curb-bulbs, the traffic signal at 16th and Cherry, the ...
0.00215696543 |
a/77473
9.appendixofneworexpandedcapitalfacilites
STK730309Activating and Connecting to GreenwaysThis project will increase the number of miles of safe pedestrian routes for all ...
0.00215696543 |
a/62538
160114sbabrvltr
Porter Michael Wong January 14, 2016 ...
0.00215696543 |
a/106992
2014_doit_annual_report_web
a facelift to our open data portal, ensuring that it provides the underlying resources to create new solutions to solve challenges in our ...
0.00215696543 |
a/70106
2017_0418_fauntleroy_walk_and_talk_summary_final_v2
of Neighborhoods, complete comment forms Ia copy of the SEATTLE DEPARTMENT OF TRANSPORTATION FAUNTLEROY BOULVEARD PROJECT ...
0.00215696543 |
a/100540
resolution_3213_response_new_levy_programs
that are expected to deliver community co-created projects, including Neighborhood Scale Traffic Safety Programs, ...
0.00215696543 |
a/164431
2024_transportation_levy_readiness_approach
-Gilman Trail Missing Link  Neighborhood Greenways  Maintenance  New Program: Early readiness priority ...
0.00215696543 |
a/161121
sepachecklistdelridgends101514
with this proposal? If yes, explain. The City of Seattle Department of Transportation (SDOT) plans to build Neighborhood ...
0.00215696543 |
a/115445
2017 12-14 bpc minutes approved
Area a permanent fixture; this park sees dozens of dog owners every day and produces positive activation in the ...
0.00215696543 |
a/92172
1_2020-10-19 - wshb - rp-cba_final (1)[2]
potentially impact surrounding neighborhoods. Any foundation retrofit work, which would include driving new piles to ...
0.00215696543 |
a/101260
sdot-vision-zero-toptobottomreview-fullreport
, such as the Safe Routes to School, Neighborhood Greenways, and Home Zone programs, which deploy a ...
0.00215625879 |
a/139131
levytomoveseattlesbab4.1.15
•Repair or restore 144 blocks of sidewalks •Build 117 blocks of new sidewalks •Restripe 5,000 crosswalks •Create "safe routes to schools" ...
0.00215625879 |
a/106899
2021_lms_q2_report
Connection Neighborhood Greenways were completed in Q2, adding over three more miles to our bike network. ...
0.00215625879 |
a/99574
transportationlevytomoveseattlepresentation
in the Rainier Valley A Safe City 12 •Build 50 miles of protected bike lanes and 60 miles of greenways •Repair up to 225 ...
0.00215625879 |
a/107337
spab-march2014meetingnotes
Topic: East Howe Street Park—Pedestrian Pathway and Stairs Presenters: Brian Ramey, steering committee • Brian lives in the Eastlake ...
0.00215625879 |
a/107905
ne65th_vz_aprillistserv(0)
and 35th Ave NE paving projects to minimize and coordinate construction impacts. The future neighborhood ...
0.00215625879 |
a/106732
ne65th_vz_aprillistserv
Ave NE paving projects to minimize and coordinate construction impacts. The future neighborhood greenway ...
0.00215625879 |
a/106733