Filter Results

1651 to 1675 of 1913
seattledesigncommission-2009.04.16seattletradecenterskybridgeminu ...
tackle given the budget, have you consider creating a critical mass in one area as opposed to spreading it out? In 07’ and 08’ we bumped up ...
0.00214489433 |
a/85476
seattledesigncommission-2008.09.04firestation21minutes
in a pedestrian zone. A bid is targeted for May, followed by construction starting in September. Public Comments Jess ...
0.00214489433 |
a/85451
hire_arborist
. The wrong tree in the wrong location will lead to future problems as a result of limited growing space, insects, diseases ...
0.00214489433 |
a/117871
eng450latecomeragreements
as a result of street improvements are not eligible for a utility Latecomer Agreement. Improvements required as a ...
0.00214489433 |
a/112905
seattledesigncommission-2005.07.21seattlecentergarageminutes
along a disused railroad corridor, behind the cemetery, west of Aurora. Has gone out to bid this week. Both north and ...
0.00214489433 |
a/85364
2004annualreportweb
Department to end themisuse of disabled parking placards. The result will be moreparking spaces for use by ...
0.00214489433 |
a/99358
fein-seec-testimony-20190805-2-with-coates-enclosure
-judge panels of the Ninth Circuit, have interpreted Citizens United to require this result, on the theory that ...
0.00214489433 |
a/53514
item3efeinsubmission
Circuit, have interpreted Citizens United to require this result, on the theory that contributions to independent ...
0.00214489433 |
a/129630
seattledesigncommission-2009.07.02sewardparkplayareaminutes
. The program is operationally driven. An analysis of adaptively reusing the existing facility was done, but ultimately ...
0.00214489433 |
a/85488
2019-2024strategicplan
. •This includes the review of results and recommendations from 2018 recovering cost of service connection work.•Drafted ...
0.00214489433 |
a/51083
2019-q1-report-final
the review of results and recommendations from 2018 recovering cost of service connection work.•Drafted changes to the ...
0.00214489433 |
a/51084
seattledesigncommission-2019.11.07_sr520roanokelidportagebaybridg ...
will be constructed by a design-build contract. The proposed concepts will include design elements and principles that will be embedded in ...
0.00214489433 |
a/85972
wmbe_outreach plan_18-19
and $305,000, for 2018. This approach has produced significant success in providing WMBE firms access to opportunities to ...
0.00214489433 |
a/113318
1823adoptedcipoverview
(OSE) for the Duwamish area and SDOT for Chinatown/ID). The result of this work includes several targeted capital ...
0.00214489433 |
a/62881
seattledesigncommission-2007.10.18terminal30-alaskanwaysminutes
of the last eight years. o Recognizes that CityDesign and DPD’s joint roles in mega CIP and transportation projects have ...
0.00214489433 |
a/85409
sdot 2019 wmbe outreach plan
projects in order to set the adequate parameters to gauge the effectiveness and efficiency of local WMBE inclusion efforts versus the ...
0.00214489433 |
a/99773
oed
for informational purposes only. Changes in FTEs resulting from City Council or Human Resources Director actions outside of ...
0.00214489433 |
a/147771
ellsworth-cottages-designation-nomination
. Spurred by the economic boom, a direct result of the 1897 Alaska Gold Rush, Seattle’s population rose ...
0.00214489433 |
a/76362
seattledesigncommission-2009.02.19rosestreetwolcottavesvacationmi ...
to increase after the Viaduct is replaced, depending on the final plan. Elliott Ave. is one-way going south. Minimal accidents have ...
0.00214489433 |
a/85466
2019_12_02 _paac meeting minutes
.  Three of the major themes for feedback received as a result of coordination meetings and outreach are: safe riding, ...
0.00214489433 |
a/103675
2015decnewsletter
crimes (including high rates of rape committed by buyers, pimps, and traffickers) and endure a higher risk of death as a ...
0.00214489433 |
a/50342
overview_2530proposedcip
. • If the 30% baseline total project cost is over $50 million, the department will initiate a third-party review of the baseline total ...
0.00214489433 |
a/160788
2019_4_22-structureforstability
. Projects must be done through a competitive bid process, be in compliance with public works, and pay prevailing wage.The ...
0.00214489433 |
a/49632
q2 2024 levy to move seattle report_final
and state grants, resulting in a total budget of $496.2 million when combined with $188.3 million carried over from 2023. ...
0.00214489433 |
a/159390
wmbe_outreach_plan_2017
are not readily added to the observed department performance. These represent significant progress towards capacity building and inclusion ...
0.00214489433 |
a/99836