Filter Results

1601 to 1625 of 1913
phac-notes-2021-05-12
, and is already attendingpre-bid meetings and will soon be at pre-jobs. SPS is also implementing new work WMBE ...
0.00214489433 |
a/58861
sbp_meeting_summary_2019-10-02f
unsuccessful higher bids and have asked for input by those companies about why they bid what they did. We ...
0.00214489433 |
a/112270
2018_0607_final_loc_juneminutes
. Betty: I did not read the article about the Magnolia Bridge but is that a result of this work? Goran: Yes, the $1M ...
0.00214489433 |
a/99519
initiativestatus2016q13.0
Capital Funds Preserve long-term use of Parks and Recreation facilities through capital investments. In 2016, reduce the backlog of major ...
0.00214489433 |
a/90851
2023-food-systems-rfq_q-av3
or MPC networks? For the purposes of this RFQ, agencies receiving services funded through the resulting contract must be ...
0.00214489433 |
a/140437
12_02_2021_dc_plan_regular_meeting_minutes_final - signed
against peers. The improvements will be live in December. Participation Satisfaction Survey Results: Frank McCafferty ...
0.00214489433 |
a/68711
desrpteitelbuilding
by the economic boom, a direct result of the 1897 Alaska Gold Rush, Seattle’s population rose dramatically—growing from ...
0.00214489433 |
a/75991
dag16_summary
problems in construction and result in increased costs. The team identified about twenty different items that could ...
0.00214489433 |
a/101070
2023_state_legislative_agenda
the inequities and loss of rights resulting from the Dobbs v. Jackson decision. We support a constitutional amendment to ...
0.00214489433 |
a/138025
preapproveddaduinfosessionsummary
310, SDCI currently allows an applicant to submit a design, pay for permit review, and create a standard plan. The pre-approved DADU plan ...
0.00214489433 |
a/86967
sbp_meeting_summary_2019-10-02
in Portland and DC. Pre-work will continue until early 2020 when construction will begin. We are doing a deep dive on the budget now. ...
0.00214489433 |
a/112269
spu_water_overview
forward. As a result of this analysis, several projects have been dropped when costs far exceed the benefits. Several ...
0.00214489433 |
a/61730
recommendations-2009-01-08
and currently wants to lease the property. The lease or sale process involves open market transaction for interested parties to submit ...
0.00214489433 |
a/76840
attachment 1 - team questions for ovg 4.24.17
that this is a substantial alteration, requiring a seismic evaluation? 12. And depending on the results of the evaluation, ...
0.00214489433 |
a/56252
eng450realpropertycharges-draft
. Utility improvements that are required as a result of street improvements are not eligible for a utility Latecomer ...
0.00214489433 |
a/112907
2023-congregate-meals-rfq_questions_and_answers
will be made for the period of January 1, 2024 - December 31, 2024. It is the City’s intention to renew agreements ...
0.00214489433 |
a/139810
2019-sbt-rfp-presentation_final
specific facts with back-up documentation;5.Indicate what relief or corrective action you believe City should make;6.Demonstrate you made ...
0.00214489433 |
a/69276
2020levydeliveryplan_0106_2020_final
2020 accomplishments reflect current project schedules. The BMP Implementation Plan’s 2020 projects included some deliverables that are ...
0.00214489433 |
a/99555
05-10_spl_adopted_project_detail_final
, as initial construction bids exceeded the budget. The project will be re-bid in early 2005. Operations ...
0.00214489433 |
a/60798
hsd-general-terms-conditions-agreement_2022
the Director of the Department. “Personal Information” means information received by Agency as a result of Agency’s ...
0.00214489433 |
a/134055
05-10_proposed_cip_spl_project_detail
for All” bond interest earnings, and the Executive is proposing adding $350,000 from the Cumulative Reserve Subfund - REET I in 2005, as ...
0.00214489433 |
a/60860
may132013draftmeetingsummary
liability—something wrong with the City system, as opposed to the side sewer. If the backup is caused by an extreme act of nature, then SPU ...
0.00214489433 |
a/111546
6acsispecificationsforcathodicprotection
to the Engineer the result of factory resistance tests for each anode lead wire connection to assure the finished ...
0.00214489433 |
a/154281
gb-city-case-carkeek
resulted in a total site imperviousness of 38.71 percent, even with twice the roof area of the previous structure. This is ...
0.00214489433 |
a/88356
marra-desimonenotessept2015
construction documents this Winter and be out to bid in the Spring with construction completed by next Fall, 2016. 6. ...
0.00214489433 |
a/93407