Filter Results

1526 to 1550 of 9052
spucap
force mains87 City-owned and permitted Combined Sewer Overflow points38 Combined Sewer Overflow control detention ...
0.0021965506 |
a/62547
lpbminutes7-5-17
OF APPROVAL 070517.21 University Heights 5031 University Way NE Proposed chimney alterations and selective removal Matt Hamel, ...
0.00219650473 |
a/75046
lpbminutes9-20-17
: 5304-5310 Ballard Ave NW. This action is based upon the criteria set forth in Title 84 RCW Chapter 449; and based on the review and ...
0.00219650473 |
a/75055
2012sbcchapter6
the building elements listed inTable 601 are of noncombustible materials, except as permit-ted in Section ...
0.00219649356 |
a/97371
seattle_public_utilities
drains • 1,000 miles of combined sewers • 768 pump stations • 93 permitted combined sewer overflow outfalls • 277 storm ...
0.00219649356 |
a/60916
spu_06-11
miles of combined sewers • 768 pump stations • 93 permitted combined sewer overflow outfalls • 277 storm drain outfalls • ...
0.00219649356 |
a/60977
sigma-kappa-mu-designation
in the central section of 9'-6". 8 Documented Building Alterations and Existing Condition Date Architect Description ...
0.00219640671 |
a/76544
desrptsigmakappamu
in the central section of 9'-6". 8 Documented Building Alterations and Existing Condition Date Architect Description ...
0.00219640671 |
a/76260
psb101823boatlandingsr
on the building. 6. Projecting signs and neon signs may be recommended only if the Preservation Board determines that all ...
0.00219638227 |
a/148411
psb1821_sr_kwb
, carved stone and wooden or cast iron storefronts are also typically used throughout the District. Synthetic stucco siding materials are ...
0.0021963492 |
a/74203
ova_partialspecifications
ADDITIONSECTION 024119 - SELECTIVE AND STRUCTURE DEMOLITIONPART 1 - GENERAL1.01SUMMARYA.Section Includes:1.Demolition and removal of ...
0.0021963492 |
a/75394
2012sebcchapter11
1102 HEIGHTS AND AREAS1102.1 Height limitations. No addition shall increase theheight of an existing building beyond that ...
0.0021962882 |
a/97110
lpbminutes_3-2-22
and likely the entire state. Efforts to construct a new fire station building in South Park began as early as 1916. The ...
0.002196283 |
a/131138
mis07-00024 _morgan_
for certain accessory structures exempted from building permit requirements from 200 square feet to 120 ...
0.00219628 |
a/65201
2018sfcchapter4
2018sfcchapter4 2018 SEATTLE FIRE CODE87CHAPTER 4EMERGENCY PLANNING AND PREPAREDNESSUser note:About this chapter: Chapter 4 addresses the ...
0.00219628 |
a/97728
2012sbcchapter3
be appliedaccumulatively.f.The permitted quantities shall not be limited in a building equipped throughout ...
0.00219628 |
a/97362
wallingfordguidelines
, the building eleva-tion drawings will be in color to showbuilding materials in addition to façadetreatment and depth, ...
0.00219625374 |
a/96376
directors_report_mha_implementation_dt_slu
process whether they will be able to build the project they are proposing. This proposal would change the point in the ...
0.00219624466 |
a/65076
2012srcchapter8
forces shall be permitted to be multiplied by 0.75 for connections not located within 8 feet of building ...
0.00219614524 |
a/97812
fire-station-16-designation
of such neighborhood or city. DESCRIPTION The Site Completed in 1928, the reinforced concrete fire station building is ...
0.002196115 |
a/76373
desrptmontlakeschool
, Block 22 of the Second Addition to Union City, is 200’ (north-south) by 360’ (east-west), for a total area of 72,000 square feet. The ...
0.002196115 |
a/76171
montlake-school-designation
property, Block 22 of the Second Addition to Union City, is 200’ (north-south) by 360’ (east-west), for a total area of 72,000 square feet. ...
0.002196115 |
a/76472
mimp_annual_report_fy2013-2015_2015_10_01
Building along E Madison Street. When the university moves forward with a Master Use Permit (MUP) ...
0.00219610939 |
a/77261
seattlecitylight
scheduled to begin in 2015. The project rebuilds Generator 32 at Diablo Powerhouse as part of the utility's generator rebuild program. ...
0.002196092 |
a/62185
sclcap
in 2015. The project rebuilds Generator 32 at Diablo Powerhouse as part of the utility's generator rebuild program.  Diablo Facility – ...
0.002196092 |
a/62163