Filter Results

1476 to 1500 of 2177
3i_19-118
, 22nd Ave E and E Madison Image: Existing marked crosswalk associated with Neighborhood Greenway Vision ...
0.00214893953 |
a/78248
appendix
and environmentally-friendlyamenities such as swales, natural landscaping, and benches.0Bell STK73484Belltown Neighborhood ...
0.00214893953 |
a/61985
constructionlist_221007
17toTBD24/7"Stay Healthy Streets"Portions of neighborhood greenways are opening to people living in the ...
0.00214893953 |
a/134718
constructionlist_220909
PMSODODate(s) and TimesProject /LocationDescription of Traffic ImpactsLocationApril 17toTBD24/7"Stay Healthy Streets"Portions of ...
0.00214893953 |
a/133420
construction list 220922
17toTBD24/7"Stay Healthy Streets"Portions of neighborhood greenways are opening to people living in the ...
0.00214893953 |
a/134074
constructionlist_220916
17toTBD24/7"Stay Healthy Streets"Portions of neighborhood greenways are opening to people living in the ...
0.00214893953 |
a/133702
constructionlist_220930
/LocationDescription of Traffic ImpactsLocationApril 17toTBD24/7"Stay Healthy Streets"Portions of neighborhood ...
0.00214893953 |
a/134480
841appendix
and environmentally-friendly amenities such as swales, natural landscaping, and benches.0Bell STK73484Belltown Neighborhood ...
0.00214893953 |
a/61975
appendix
friendly.02400 Massachusetts STK73484Belltown Neighborhood CenterThis project will provide approximately 6,000 square feet ...
0.00214893953 |
a/62371
kenyonways_construction_notice
ramps including a multi-use ramp toconnect the Chief Sealth Trail•two new seating areas on Kenyon Way S (part ofthe Kenyon ...
0.00214893953 |
a/137061
crs_639_660
to serve the private development, the developer would be helping to catalyze the development of a larger district energy system in the ...
0.00214893953 |
a/62091
seattledesigncommission-2017.08.03burkegilmanmissinglinkminutes
team continues to coordinate with adjacent city projects such as the RapidRide program, Neighborhood ...
0.00214893953 |
a/84807
2019_1105_rr_delridge_late_design_final
• New paving for a smoother ride and long-lasting street • New sewer and water pipes for drinking water and wastewater • New protected bike ...
0.00214893953 |
a/106005
alki_survey_report_ part1_of_2
Healthy Streets, which were installed on existing Neighborhood Greenways. At this time, the project team ...
0.00214893953 |
a/105723
alki_survey_report_ part1_of_2
Healthy Streets, which were installed on existing Neighborhood Greenways. At this time, the project team ...
0.00214893953 |
a/128173
ne_ngw_map
GreenwayLittle Brook Healthy StreetOlympic HillsHealthy StreetOlympic HillsNeighborhood GreenwayWedgwood Neighborhood ...
0.00214893953 |
a/158142
shs_delridgehighland_trenton_flyer
an opportunity for you to consider how they might improve your community long-term. How was my street selected? • We considered existing ...
0.00214893953 |
a/104113
appendixa_2429adoptedcip
neighborhood uses. Alternative(s): The do nothing alternative leaves the 4kV system in place. The capacity concerns will ...
0.00214893953 |
a/153299
2023-2024proposedbudgetoverview_09.28.2022
of the Park Ranger program to enhance safety and promote voluntary compliance of park rules. Park Rangers will begin 2023 downtown and will ...
0.00214893953 |
a/145057
accessiblemt.baker3-17-15
accessiblemt.baker3-17-15 Accessible Mt. Baker Integrated Multimodal Plan Freight Advisory Board Michael James, SDOT March 17, 2015 ...
0.00214893953 |
a/107222
sdot_levy_proposal_folio_may2024
ramps so people walking and rolling can safely get to where they need to go ($135M)nnnnnnnExpand Seattle’s protected bike lane network; ...
0.00214893953 |
a/155966
sdot_levy_proposal_folio_may2024_spreads
lane network; connect schools to bike lanes, paths, and neighborhood greenways; and maintain and upgrade ...
0.00214893953 |
a/155965
seattledesigncommission-2019.06.06olympicskybridgeminutes
the Transforming Age organization. The organization has operated its current facility on the block bounded by Cherry St., Columbia St., 8th ...
0.00214893953 |
a/85056
2020_q2_levyreport_0708_2020_final
4 1 5 4 Corridors optimized 5 1 1 2 4 Regulatory street signs replaced 3,000 750 750 1,500 5 Protected bike lane (miles) 3.5-4.0 0 0.9 ...
0.00214893953 |
a/99568
2020_q2_levyreport_0708_2020_final(0)
10 4 1 5 4 Corridors optimized 5 1 1 2 4 Regulatory street signs replaced 3,000 750 750 1,500 5 Protected bike lane (miles) 3.5-4.0 0 ...
0.00214893953 |
a/99567