Filter Results

1301 to 1325 of 12258
shared_micromobility_permit_requirements
shared_micromobility_permit_requirements indemnFree-Floating Shared Micromobility Permit ...
0.002233272 |
a/143061
psbminutes7-19-17
with the building and that do not display a false historical appearance are permitted. (7/03) 4.Awnings ...
0.00223326357 |
a/73816
baroness-apartments-designation
at the City of Seattle’s Department of Planning and Development (DPD), the majority of alterations to the building have ...
0.00223322981 |
a/75819
desrptbaroness
of Seattle’s Department of Planning and Development (DPD), the majority of alterations to the building have been to the ...
0.00223322981 |
a/75891
1005_s_king_supp_plan
of the site,adjacent buildings plus open space, streets, alleys and proposeduses of the building.2. Respond to datum lines, ...
0.00223317253 |
a/73285
building greener cities seattle- green job opportunities in clean ...
/ProtectYourHomeFromEarthquakeDamage.pdfCity of Seattle. (2023s). Priority Green Expedited – Overview. Retrieved 16 05 2023 ...
0.00223316764 |
a/165087
pspb100522westlandplanset
. CORRIDORS ADJACENT TO THE EXTERIOR WALLS OF BUILDINGS SHALLBE PERMITTED TO HAVE UNPROTECTED OPENINGS ON ...
0.002233096 |
a/134389
treeregsconstitutentemailsthrough022221
building design, and locally grown produce; and • • (n) Permits and appeals. • • (6) The department may ...
0.002233036 |
a/119482
2022 draft director's rule_vending in the public place_sepa
. 5.5.3.2. 4-Month site trial vending: A specific 4-month period for a vendor to try out a vendor-identified new site. • Site trial ...
0.00223302841 |
a/131925
2018srcchapter4
and exterior, shall besupported on continuous foundations.Exception: Two-story buildings shall be ...
0.002232939 |
a/97882
56_ifc_2021
, public highways and passenger railways based on the maximum quantity of explosive materials permitted to be in the ...
0.00223290431 |
a/139035
2025-2026 spr fees and charges
/ Photography Permits ............................................................................................... 4 • ...
0.00223283074 |
a/163296
dpdp021679
dpdp021679 Sandra Mallory DPD Sustainable Building Policy REP August 30, 2011 Version #5 1 Mayor’s Recommendations: ...
0.00223278487 |
a/88291
dpdp021679
dpdp021679 Sandra Mallory DPD Sustainable Building Policy REP August 30, 2011 Version #5 1 Mayor’s Recommendations: ...
0.00223278487 |
a/57394
bgt_shilshole_culturalresources_final
No TCP(s) found? Yes No Replace a draft? Yes No Satisfy a DAHP Archaeological Excavation Permit requirement? Yes # ...
0.00223267 |
a/100469
neighborhoods_and_development
permit activity, the building industry in Seattle and throughout the region has experienced a slowdown. ...
0.00223247567 |
a/61404
lpbcurrentnom_bucca_de_beppo _ supplemental_report
” for commercial projects over 4,000 square feet in area. As any proposed redevelopment of the subject building described ...
0.002232464 |
a/74438
2021sebcchapter10
of occupancy changes over time shall be considered. 3. Unreinforced masonry bearing wall buildings assigned to Risk ...
0.002232339 |
a/162612
2021swmanualvol4sourcecontrolclean
activity into a building or cover (Figure 10), contain the activity, and connect floor drains to the sanitary sewer. Obtain ...
0.0022322333 |
a/96987
thorntoncreekdeparturerecommendationsfinal
and approved by DPD prior to the issuance of any permit, and made conditions of the issuance of any ...
0.0022321858 |
a/77680
psbminutes5-17-17
'). Awnings may be permitted on upper floors for the purpose of climate control. All awnings shall be of a design ...
0.002232099 |
a/73811
2012srcchapter24
shall be permitted to terminate aboveground outside of buildings where installed inpremanufactured ...
0.00223203236 |
a/97802
sdot_smc_15.16_cafe_in_the_public_place_ordinance_draft
, straight, and unobstructed 7 corridor within the designated pedestrian clear zone that extends along the permitted area ...
0.00223191176 |
a/104277
neighborhoodsanddevelopment
for additional reductions in DPD in the 2011-2012 Proposed Budget. As of August, 2010, the volume of incoming building ...
0.00223191 |
a/61894
cost-of-green-affordhousing
Current Common Building ...
0.00223180349 |
a/88276
Previous 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 Next