Filter Results

1251 to 1275 of 1291
center
for the replacement of the Flag Pavilion, with a new Festival Pavilion and adjacent open spaceadditions to the Seattle Center campus, was ...
0.002142034 |
a/60381
restorationthinningtrialsummary
Restoration Thinning budgets. Installation of the blocks was included in bid packages for thinning contractors. A separate ...
0.002142034 |
a/115366
1924proposedcipoverview
, FAS implemented a Citywide requirement on all public work bids and contracts above $300,000 called the “Public Works WMBE ...
0.002142034 |
a/63072
2021_q1_report(0)
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.002142034 |
a/99575
2021_q1_report
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.002142034 |
a/99576
overview
address contracting equity for minority‐ and women‐ owned businesses. In 2011, FAS implemented a Citywide requirement on all public work 
0.002142034 |
a/63142
seattledesigncommission-2008.12.04southeastseattletransportations ...
determine the direct results. What other factors are considered? In terms of modeling for the future, there will be a ...
0.002142034 |
a/85460
2021levydeliveryplan_0223_2021
* 5-92021 accomplishments reflect current project schedules. The BMP Implementation Plan’s 2020 projects included some deliverables that are ...
0.002142034 |
a/99571
seattledesigncommission-2006.11.02mercercorridorminutes
are currently under construction and renovation. 3 major trail projects are going to bid next year, of which this is one, ...
0.002142034 |
a/85390
fta-dbe-goal-setting-methodology-2015-2016
assigned to each NAICS code. Then, for each NAICS code, the percentage of relative DBE availability was multiplied by the corresponding ...
0.002142034 |
a/59001
2021-07-21_annexiv.eop.signed
through ESFs into an area after an incident has occurred or in anticipation of an approaching incident or event that is expected to cause a ...
0.002142034 |
a/57064
spl_2328cip
roof and mechanical system replacement bid came in several hundred thousand dollars over estimates due to higher cost of ...
0.002142034 |
a/138623
seattledesigncommission-2019.06.06_sr520roanokelidportagebaybridg ...
-build contract. The proposed concepts will include design elements and principles that will be embedded in WSDOT’s request for proposals ...
0.002142034 |
a/85968
solidwastefacilitiesplanappendixf
and disposal. Although thetransportation and disposal contract could be re-negotiated or re-bid after the expirationdate, a ...
0.002142034 |
a/113167
city_of_seattle_open_data_2017_annual_report
October Facebook Machine Learning Hackathon winners Spoke about the tools they created using Seattle open datasets to address information ...
0.002142034 |
a/117282
6 - q1 2023 report
between Stewart St & Virginia St.Bottom: Stairway at S Morgan St under construction.BEFOREAFTERMaintenance and Repair•Continued work leading ...
0.002142034 |
a/143161
2024 grant guidelines
adopted by Council and signed by the Mayor). This framework has served as a roadmap for Seattle to move closer to the ambitious goal of ...
0.002142034 |
a/147278
2024 grant guidelines
adopted by Council and signed by the Mayor). This framework has served as a roadmap for Seattle to move closer to the ambitious goal of ...
0.002142034 |
a/146971
208100 parking lot e-18 solar canopy -- cucac ppt 2024-04-19 ...
canopy design15’-0”12’-0”Canopy paint color: Patrician BronzeSection through electrical equipment enclosureSolar canopy example ...
0.002142034 |
a/156285
review panel 1st quarter sp update 2015 final
and Army Corps of Engineers September 30, 2014) – September 2015 •Completion of construction contract – October 2015 Completion Other ...
0.002142034 |
a/51400
q1-2015-strategicplanupdatepresentation
of the permitting process resulted in a one year delay in the contract bidding phase now targeted for ...
0.002142034 |
a/51355
seattledesigncommission-2004.07.15firestation10minutes
. They identified initial phases of construction, and appropriate contracting methods for design-bid-build. Project ...
0.002142034 |
a/85341
industriallandsbenefitsandchallenges
funds to the City and suggested tax breaks for small or start up companies rather than blanket reductions. Another suggestion was for ...
0.002142034 |
a/87982
parksviewpolicy051315
violation of the permit will result in the imposition of civil and/or criminal penalties. Arborist Certification ...
0.002142034 |
a/118432
move_seattle_oc_meeting_07272017
of program ramp-up•2018 projects are planned to bid earlier than 2017 projects•After three years, we are scheduled to have ...
0.002142034 |
a/99644