You just searched for:
Search
Filter Results
1251 to 1275 of 1291
center
https://www.seattle.gov/documents/departments/financedepartment/0207adopted ...
for the replacement of the Flag Pavilion, with a new Festival Pavilion and adjacent open spaceadditions to the Seattle Center campus, was ...
0.002142034 |
a/60381
restorationthinningtrialsummary
https://www.seattle.gov/documents/departments/spu/environmentconservation/w ...
Restoration Thinning budgets. Installation of the blocks was included in bid packages for thinning contractors. A separate ...
0.002142034 |
a/115366
1924proposedcipoverview
https://www.seattle.gov/documents/departments/financedepartment/1924propose ...
, FAS implemented a Citywide requirement on all public work bids and contracts above $300,000 called the “Public Works WMBE ...
0.002142034 |
a/63072
2021_q1_report(0)
https://www.seattle.gov/documents/departments/sdot/about/funding/2021_q1_re ...
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.002142034 |
a/99575
2021_q1_report
https://www.seattle.gov/documents/departments/sdot/about/funding/2021_q1_re ...
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.002142034 |
a/99576
overview
https://www.seattle.gov/documents/departments/financedepartment/19adoptedbu ...
address contracting equity for minority‐ and women‐ owned businesses. In 2011, FAS implemented a Citywide requirement on all public work
0.002142034 |
a/63142
seattledesigncommission-2008.12.04southeastseattletransportations ...
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
determine the direct results. What other factors are considered? In terms of modeling for the future, there will be a ...
0.002142034 |
a/85460
2021levydeliveryplan_0223_2021
https://www.seattle.gov/documents/departments/sdot/about/funding/2021levyde ...
* 5-92021 accomplishments reflect current project schedules. The BMP Implementation Plan’s 2020 projects included some deliverables that are ...
0.002142034 |
a/99571
seattledesigncommission-2006.11.02mercercorridorminutes
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
are currently under construction and renovation. 3 major trail projects are going to bid next year, of which this is one, ...
0.002142034 |
a/85390
fta-dbe-goal-setting-methodology-2015-2016
https://www.seattle.gov/documents/departments/fas/purchasingandcontracting/ ...
assigned to each NAICS code. Then, for each NAICS code, the percentage of relative DBE availability was multiplied by the corresponding ...
0.002142034 |
a/59001
2021-07-21_annexiv.eop.signed
https://www.seattle.gov/documents/departments/emergency/plansoem/2021 emap ...
through ESFs into an area after an incident has occurred or in anticipation of an approaching incident or event that is expected to cause a ...
0.002142034 |
a/57064
spl_2328cip
https://www.seattle.gov/documents/departments/financedepartment/2328adopted ...
roof and mechanical system replacement bid came in several hundred thousand dollars over estimates due to higher cost of ...
0.002142034 |
a/138623
seattledesigncommission-2019.06.06_sr520roanokelidportagebaybridg ...
https://www.seattle.gov/documents/departments/opcd/designcommission/sr520_r ...
-build contract. The proposed concepts will include design elements and principles that will be embedded in WSDOT’s request for proposals ...
0.002142034 |
a/85968
solidwastefacilitiesplanappendixf
https://www.seattle.gov/documents/departments/spu/documents/plans/solidwast ...
and disposal. Although thetransportation and disposal contract could be re-negotiated or re-bid after the expirationdate, a ...
0.002142034 |
a/113167
city_of_seattle_open_data_2017_annual_report
https://www.seattle.gov/documents/departments/tech/opendata/city_of_seattle ...
October Facebook Machine Learning Hackathon winners Spoke about the tools they created using Seattle open datasets to address information ...
0.002142034 |
a/117282
6 - q1 2023 report
https://www.seattle.gov/documents/departments/sdot/boardscommittees/loc/6 - ...
between Stewart St & Virginia St.Bottom: Stairway at S Morgan St under construction.BEFOREAFTERMaintenance and Repair•Continued work leading ...
0.002142034 |
a/143161
2024 grant guidelines
https://www.seattle.gov/documents/departments/tech/tmf/2024 grant ...
adopted by Council and signed by the Mayor). This framework has served as a roadmap for Seattle to move closer to the ambitious goal of ...
0.002142034 |
a/147278
2024 grant guidelines
https://www.seattle.gov/documents/departments/tech/digitalengagement/tmf/20 ...
adopted by Council and signed by the Mayor). This framework has served as a roadmap for Seattle to move closer to the ambitious goal of ...
0.002142034 |
a/146971
208100 parking lot e-18 solar canopy -- cucac ppt 2024-04-19 ...
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
canopy design15’-0”12’-0”Canopy paint color: Patrician BronzeSection through electrical equipment enclosureSolar canopy example ...
0.002142034 |
a/156285
review panel 1st quarter sp update 2015 final
https://www.seattle.gov/documents/departments/citylightreviewpanel/document ...
and Army Corps of Engineers September 30, 2014) – September 2015 •Completion of construction contract – October 2015 Completion Other ...
0.002142034 |
a/51400
q1-2015-strategicplanupdatepresentation
https://www.seattle.gov/documents/departments/citylightreviewpanel/document ...
of the permitting process resulted in a one year delay in the contract bidding phase now targeted for ...
0.002142034 |
a/51355
seattledesigncommission-2004.07.15firestation10minutes
https://www.seattle.gov/documents/departments/opcd/designcommission/project ...
. They identified initial phases of construction, and appropriate contracting methods for design-bid-build. Project ...
0.002142034 |
a/85341
industriallandsbenefitsandchallenges
https://www.seattle.gov/documents/departments/opcd/vault/industriallands/in ...
funds to the City and suggested tax breaks for small or start up companies rather than blanket reductions. Another suggestion was for ...
0.002142034 |
a/87982
parksviewpolicy051315
https://www.seattle.gov/documents/departments/urbanforestrycommission/2015/ ...
violation of the permit will result in the imposition of civil and/or criminal penalties. Arborist Certification ...
0.002142034 |
a/118432
move_seattle_oc_meeting_07272017
https://www.seattle.gov/documents/departments/sdot/about/funding/move_seatt ...
of program ramp-up•2018 projects are planned to bid earlier than 2017 projects•After three years, we are scheduled to have ...
0.002142034 |
a/99644